Uplink Vista 10SE Dual Port Gigabit User Guide
- June 1, 2024
- Uplink
Table of Contents
Uplink Vista 10SE Dual Port Gigabit User Guide
CAUTION:
- It is advised that an experienced alarm installer programs the panel as further programming may be required to ensure proper performance and use of the full functionality.
- Do not route any wiring over circuit board.
- Full panel testing, and signal confirmation, must be completed by the installer.
NEW FEATURE: For 5530M Communicators, the status of the panel can be
retrieved not only from the status PGM but now also from the Open/Close
reports from the dialler.
IMPORTANT NOTE: The Open/Close reporting needs to be enabled during the
initial pairing procedure
Wiring the 5530M communicators to Honeywell Vista 10S
Wiring and Programming
Uplink Communicators to Honeywell Vista 10SE
Programming the Honeywell Vista 10SE Alarm Panel via the Keypad
Enable Contact ID reporting:
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>