MAXPEEDINGRODS 667-203 Replacement Turbo Charger Installation Guide
- June 16, 2024
- MAXPEEDINGRODS
Table of Contents
MAXPEEDINGRODS 667-203 Replacement Turbo Charger Installation Guide
TOOLS NEEDED
- Pliers
- 5/16 Nut Driver
- T45 Torx Bit Socket
- E10 Inverse Toex Socket
- 7 mm / 10 mm / 11 mm Sockets
- 17 mm Wrench
WARNING
To prevent damage and personal injury,please note the followingpoints:
Always use the turbocharger part number specified by the engine manufacture.
Do not touch before checking surface temperatures.
Do not work on a running turbocharger or engine.
Disassemble and re-assemble using the engine manufacturer’s instructions.
Do not modify the turbocharger in anyway.
Professional installation is highly recommended.
TURBOCHARGER REMOVAL
- Open the hood.
- Disconnect battery negative cable.
- Drain the cooling system.
- Remove the air cleaner outlet duct (A).
- Disconnect the positive crankcase ventilation pipe (B) from turbocharger.
Note:
Close all pipes to prevent debris from entering.
- Remove the exhaust manifold heat shield.
- Disconnect the turbocharger wastegate regulator solenoid valve wiring harness connector (C) and unclip wiring harness **(D).
**
- Remove the turbocharger oil feed pipe hollow screw. Remove and discard the 2 seal rings **(E).
**
- Remove the turbocharger oil feed pipe bolt and pipe.
- Loosen the turbocharger coolant return hose clamp (F) and remove the turbocharger coolant return hose from the oil cooler inlet pipe.
- Remove the turbocharger coolant return pipe bolt **(G).
**
-
Remove the charge air cooler inlet air hose (H) from the turbocharger
-
Remove the plastic protective cover at the bottom of the car. Remove the air conditioner bracket.
-
Remove the turbocharger coolant feed pipe hollow screw (I), Remove and discard the 2 seal rings **(J).
**
-
Loosen the exhaust pipe clamp, remove the clamp and catalytic converter. Discard the exhaust pipe flange gasket.
-
Remove the 2 turbocharger oil return pipe bolts. Remove the turbocharger oil return pipe and the gasket.
-
Remove and discard the 8 turbocharger nuts.
-
Remove the turbocharger assembly.
-
Remove and discard the turbocharger gasket.
-
Remove the turbocharger coolant return pipe and coolant feed pipe.
TURBOCHARGER INSTALLATION
-
Install the assembly parts to the turbocharger as necessary.
Note: To avoid oil leaks, it is recommended that you replace the oil and coolant pipes. -
Clean all sealing surfaces and all threads
-
Install a NEW turbocharger gasket.
-
Install the turbocharger assembly
-
Install and tighten the 8 NEW turbocharger nuts. The installation sequence refers to the following
-
Repeat the tightening procedure to ensure a proper fastening of the turbocharger nuts.
-
The rest of the installation is the opposite of removal.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>