Hukoro F52315-11i 5-Light Kitchen Island Linear Pendant Chandelier Instruction Manual
- October 30, 2023
- Hukoro
Table of Contents
Hukoro F52315-11i 5-Light Kitchen Island Linear Pendant Chandelier
CAUTIOUS
CAUTION
- Inspect the wire insulation for any cuts, abrasions, or exposed copper that may have resulted during shipping. If there is a defect in the wire, do not attempt installation.
- Before starting installation of this fixture or removal of a previous fixture, disconnect the power by turning off the circuit breaker or by removing the fuse at the fuse box.
TOOLS REQUIRED
-
Ladder
-
Safety glasses
-
Electrical tape
-
Phillips screwdriver
-
Flat blade screwdriver
-
Pliers
-
Wire strippers
HARDWARE INCLUDED
-
Fixture
-
Iron Rack A **
**
-
Iron Rack B
-
Iron Rack C
-
Screws A
-
Screws B
-
Nuts
-
Stems
-
Swivels
-
Ceiling Plate
-
Ball Nuts
-
Baseplate
-
Lanyards
-
Washers
-
Decorative Nuts
-
Ground Wire
-
Mounting Unit
-
Wood Screws
-
Wall Anchors
-
Mounting Screws
-
Wire Nuts
*PARTS SHOWN MAY DIFFER SLIGHTLY PER LIGHT FIXTURE
EXPLODED PARTS
INSTALLATION
STEP 1
Attach the iron rack B into iron rack A using screws A a
as shown.
STEP 2
Attach the iron rack C into iron rack B using nuts.
Attach the iron rack C and fixture into iron rack A using screws
B.
STEP 3
- Unscrew the ball nuts and green grounding screw from the mounting unit.
- Disassemble the swivels under the ceiling plate by unscrewing decorative nuts. Keep the baseplate, washers, ground wire and lanyards for later use.
ASSEMBLY INSTRUCTIONS (INSTALLATION)
STEP 4
- Weave the fixture wire and fixture ground wire through the stems and swivel.
- Install swivels and stems into the fixture. Install stems based on the desired length of the item on the fixture.
STEP 5
- Weave the fixture wire and fixture ground wire through the ceiling plate, baseplate, ground wire, lanyards, washer and decorative nut.
- Install baseplate, lanyards, ground wire and swivels into the ceiling plate, and secure with washers and decorative nuts.
STEP 6
Attach the mounting unit to the junction box using the mounting
screws.
Secure mounting unit to ceiling with wood screws and wall anchors.
STEP 7
- Attach the lanyards on to the mounting unit.
- Make the electrical connection from the junction box to the fixture. Connect the ground wire to the mounting unit using the preinstalled green ground screw.
Then, connect the positive, negative and ground wires with the supplied wire nuts. Secure with electrical tape.
STEP 8
Attach the ceiling plate to the mounting unit through screw holes as shown, and secure it with ball nuts.
STEP 9
Install bulbs (not included)
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>