WORKPRO W082095AE 4 Tier Metal Shelving Unit with 4 Hooks User Manual
- June 17, 2024
- WORKPRO
Table of Contents
WORKPRO W082095AE 4 Tier Metal Shelving Unit with 4 Hooks User Manual
CAUTION: Read and follow all Safety Rules and Operating instructions
before first use of this product.
NOTE: Ensure all components are present. If any components are missing,
do not proceed with assembly. Please send an email to
service@greatstartools.com or call 877-
876-7562.
FOR YOUR SAFETY : CAREFULLY READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE USE.
SAFETY INFORMATION
WARNING!
- DO NOT let children climb on or play with the unit.
- Make sure not to drill into water or electricity lines when securing the shelving unit to the wall. Use a wire tracer and/or a water pipe finder (not included) if necessary.
- Handle with care.
- For ease and efficiency, the product should be assembled by two adults.
- Regularly check if all screw connections are tight and if all shelves are attached in a stable way.
- To avoid scratching the floor, assemble the shelving unit on a soft surface such as a carpet.
- Load the unit evenly and place the heaviest items on the lower shelves.
SPECIFICATIONS
Maximum load of Shelving unit | 600 lbs. |
---|---|
Maximum load of One single shelf | 150 lbs. |
PACKAGE CONTENTS
Ensure all components are present. If any components are missing, do not proceed with assembly. Please send an email to service@greatstartools.com or call 877- 876-7562.
# | DESCRIPTION | # |
---|---|---|
**A** | **** Shelf x 4 | **D** |
**B** | **** Top Post (with Post Cap Preassembled) x 4 | **E** |
**C** | **** Bottom Post x 4 | **F** |
TOOLS REQUIRED (NOT INCLUDED):
Rubber Mallet
Protective Gloves
ASSEMBLY
NOTE:
- Discard the black plastic spacers. These are used to separate the shelves for shipping purposes.
- Assemble on a flat surface. A piece of cardboard is recommended to keep the product from being scratched during assembly.
- Two people are recommended for assembly.
STEP 1: FOOT LEVELER ASSEMBLY
- Screw four foot levelers (D) clockwise into the bottom of four bottom posts (C).
PART | C | D |
---|---|---|
DESCRIPTION | Bottom Post | Foot Leveler |
QTY | 4 | 4 |
STEP 2: FIRST AND SECOND SHELF ASSEMBLY
- Attach four plastic sleeves (F) to the appropriate bottom posts (C) one in each post. Ensure the arrows 0on the plastic sleeves should point upwards. The plastic sleeves must be at the same height for each post to ensure the shelf sits on the sleeves levelly.
- Slide the first shelf (A) down from the top of the posts and onto the plastic sleeves (F). Push down on each corner of the shelf, ensuring that the shelf is in the fully locked position.
- Repeat for the second shelf (A).
PART | A | C | F |
---|---|---|---|
DESCRIPTION | Shelf | Bottom Post | Plastic Sleeves |
QTY | 2 | 4 | 8 |
STEP 3: TOP POST ASSEMBLY
- Screw four top posts (B) into four bottom posts (C) tightly together clockwise.
PART | B | C |
---|---|---|
DESCRIPTION | Top Post | Bottom Post |
QTY | 4 | 4 |
STEP 4: THIRD AND FOURTH SHELVES ASSEMBLY
Repeat the step 2 to install the third and fourth.
Place cardboard over the corners of each shelf and gently tap down with a
rubber mallet (or similar tool) until the shelf is level.
PART | A | F |
---|---|---|
DESCRIPTION | Shelf | Plastic Sleeves |
QTY | 2 | 8 |
STEP 5: S HOOK ASSEMBLY
- Place four S hooks (G) on the shelves at your desired position as you need.
PART | G |
---|---|
DESCRIPTION | S Hook |
QTY | 4 |
CLEANING AND MAINTENANCE
- Wipe with a dry cloth as needed to remove dust and dirt.
- Avoid contact with corrosive substances like acids, alkaline or similar substances
CUSTOMER SERVICE
If you are having difficulty in using this product and require support, please
send an email to
service@greatstartools.com or call
877-876-7562.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>