Marathon Lighting ML-GC-2347 LED Lighting Fixture Installation Guide
- June 16, 2024
- Marathon Lighting
Table of Contents
LED Lighting Fixture
Installation Guide
ML-GC-2347 LED Lighting Fixture
SAVE THESE INSTRUCTIONS
BEFORE YOU BEGIN
Read and follow all safety instructions
WARNING
RISK OF FIRE, EXPLOSION AND ELECTRIC SHOCK
- This product should be installed, inspected, and maintained by a qualified electrician only , in accordance with the NEC (National Electric Code) and all local codes.
- Turn off electrical power before inspection, installation or removal.
- Use only UL (or other NTRL) approved wire for input/ou tput connections.
- Minimum size 18 AWG or 14 AWG for continuous runs.
- Make sure LEDs and drivers are cool to touch when performing maintenance.
- Make sure the supply voltage is the same as the rated voltage of the luminaire.
- Do not install in a hazardous atmosphere, except where the ambient temperature does not exceed the rated operating temperature of the fixture.
- Keep tightly closed when in operation
Prepare Electrical Wiring
Electrical Requirements
- The LED driver must be supplied with 120 to 277V, 50/60 Hz and connected to an individual, properly grounded branch circuit protected by a 20 Ampere circuit breaker. Use min. 75°C supply.
Grounding Instructions
- The grounding and bonding of the overall system shall be done in accordance with NEC Article 600 and local codes
LED Canopy Light
Tools Required :
Philli ps Screw Drivers
Wire Strippers
Wire Cutters
-
Before start ing ensure that the power is disconnected.
-
Unpack fixture and ensure that there are no damaged part s.
-
If mounting on surface:
-
The included quick mount is used to be mounted onto a recessed junction box.
-
Install the quick mount plate t o the junction with 2 screw (Not Provided).
-
Hang the fixture to t he quick mount on the metal loop on the fixt ure.
-
Connect the power leads wit h the included wire nuts as seen below.
Black to Black(Hot), Whit e to Whit e(Neutral), Green to Green(Ground). -
Push the connection splices int o the junction box and secure the fixt ure onto t he quick mount bracket and secure wit h the set screw.
-
If mounting on pendant stem:
-
Remove wire plug from top of fixt ure to expose t he NPS thread.
-
Feed housing wires through pendant stem.
-
Make wiring connections as seem below to junction box Black to Black(Hot), Whit e to Whit e(Neutral), and Green to Green(Ground).
-
Thread pendant pipe to top of housing. Be sure to wrap Teflon tape or silicone gel to thread of pipe to prevent moisture from entering.
Standard Wiring Diagram
Documents / Resources
|
Marathon Lighting ML-GC-2347 LED Lighting
Fixture
[pdf] Installation Guide
ML-GC-2347 LED Lighting Fixture, ML-GC-2347, LED Lighting Fixture, Lighting
Fixture, Fixture
---|---