Oatey 63977309 Freestanding Tub Drain Installation Guide
- June 13, 2024
- Oatey
Table of Contents
Oatey 63977309 Freestanding Tub Drain
Product Information
The Freestanding Tub Drain is a high-quality drain system designed for use with freestanding bathtubs. It is suitable for both wood sub-floor and concrete installations. The drain body is made of durable materials and comes with a pre-installed test plug for easy testing and installation. The drain assembly includes a protective cap cover that should be kept in place until ready for tub installation. The product is available with two different installation options: Brass Tailpiece Tub Installation and Schedule 40 PVC/ABS Tub Installation.
Brass Tailpiece Tub Installation
- Cut a 4-inch hole into the wood sub-floor using the supplied cutout template.
- Affix the drain body to the sub-floor using 4 screws. For concrete installations, use approved anchors and/or screws.
- Ensure the drain body is level.
- Confirm that the pre-installed test plug is securely in place in the drain opening.
- Test for leaks.
- Leave the test plug in the drain opening and secure the protective cap over the drain assembly until ready to set the tub.
- Install flooring up to the protective cap cover and do not remove it until ready for tub installation.
- Check the distance between the base of the tub drain and the base of the P-Trap to ensure it accommodates the supplied brass tailpieces.
- Select the appropriate threaded or flanged tailpiece and connect it to the tub drain using an ABS/PVC adapter if needed.
- If using a threaded tailpiece, use approved Oatey Thread Sealant to create a seal. If using a flanged tailpiece, use the supplied nut and washer.
- Apply the supplied lubricant to the tailpiece.
- Carefully lower the tub with the installed brass tailpiece into the drain opening, ensuring the tailpiece is fully engaged with the sealing mechanism.
- Make sure the tub base makes contact with the flooring.
Schedule 40 PVC/ABS Tub Installation
- Cut a 4-inch hole into the wood sub-floor using the supplied cutout template.
- Affix the drain body to the sub-floor using 4 screws. For concrete installations, use approved anchors and/or screws.
- Ensure the drain body is level.
- Confirm that the pre-installed test plug is securely in place in the drain opening.
- Test for leaks.
- Leave the test plug in the drain opening and secure the protective cap over the drain assembly until ready to set the tub.
- Install flooring up to the protective cap cover and do not remove it until ready for tub installation.
- Measure the distance between the inside ledge of the drain flange and the top of the finished floor (DIM A).
- Measure the distance from the top of the finished floor to the inside of the sanitary hub (DIM B).
- Use recommended steps for solvent cementing, including deburring and chamfering both sides of the pipe.
- Apply the supplied lubricant to the pipe.
- Carefully lower the tub with the installed Schedule 40 pipe into the drain opening, ensuring the tailpiece is fully engaged with the sealing mechanism.
- Make sure the tub base makes contact with the flooring.
Please contact Oatey technical support at technical@oatey.com for any additional information or assistance.
USING INSTRUCTION
The Oatey® Freestanding Tub Drain Kit removes the guesswork and complexity from installing a freestanding/island center or offset tub. Simply connect the drain to the DWV system from above the floor at rough-in – only a 4 in. subfloor hole is needed. The compact, universally compatible drain works with brass or Schedule 40 tailpieces and easily connects to any plumbing configuration. Included in the kit are a pre-installed, tool-free quarter-turn leak test plug and an easy-to-grab protective cap to prevent drain tile-over.
ROUGH-IN – WOOD SUBFLOOR
- Cut 4 in. hole into wood sub-floor (use supplied cutout template).
- Affix drain body to sub-floor with 4 screws. For concrete installations, use approved anchors and/or screws.
- Ensure drain body is level.
- Use approved Oatey primer and cement to connect drain body to P-Trap below floor. If using 2 in. P-Trap, use supplied 1-½ in. x 2 in. Adapter
TESTING
- Confirm pre-installed test plug is secured in drain opening.
- Test for leaks.
- Leave test plug in drain opening and secure protective cap over drain assembly until ready to set the tub.
FLOORING INSTALLATION
- Install flooring up to protective cap cover. DO NOT remove until ready for tub installation.
- NOT for use with liquid applied or sheet membranes.
Depending on preferred tub drain connection method, select brass tailpiece or schedule 40 tub installation steps below.
BRASS TAILPIECE TUB INSTALLATION
-
Remove protective cap cover and test plug (using counter clockwise ¼ turn) from drain assembly and remove any existing debris.
-
Confirm distance between base of tub drain and base of P-Trap will accommodate the supplied brass tailpieces.
NOTE: DO NOT CUT THE SUPPLIED BRASS TAILPIECES. -
Depending on tub drain, select threaded or flanged tailpiece and connect to tub drain. Use ABS/PVC adapter as needed.
- If u sing threaded tailpiece, use approved Oatey Thread Sealant to create seal.
- If u sing flanged tailpiece, use supplied nut and washer.
-
Apply supplied lubricant to tailpiece.
-
Carefully lower Tub with installed brass tailpiece into drain opening. Ensure tailpiece is fully engaged with sealing mechanism.
-
Ensure tub base makes contact with flooring.
SCHEDULE 40 PVC/ABS TUB INSTALLATION
- Remove protective cap cover and test plug (using counter clockwise ¼ turn) from drain assembly and remove any existing debris.
- Measure distance between inside ledge of the drain flange to top of the finished floor (DIM A).
- Measure distance from top of finished floor to inside of sanitary hub (DIM B).
- Add these two measurements and an additional 1-½ in. Cut pipe to this length.
- Use recommended steps for solvent cementing which includes deburring and chamfering both sides of the pipe.
- Apply supplied lubricant to pipe.
- Carefully lower tub with installed Schedule 40 pipe into drain opening. Ensure tailpiece is fully engaged with sealing mechanism.
- Ensure tub base makes contact with flooring.
EXAMPLE
- Inside Ledge of Drain Flange to Top of Finished Floor – 1-¼ in.
- Top of Finished Floor to Inside Fitting Hub – 2-½ in.
- Add Additional 1-½ in.
- Total Length of Pipe – 5-¼ in.
Please contact Oatey technical support at technical@oatey.com for any additional information or assistance.
References
- Solvent Cements, Drains, & More for All Your Plumbing Needs | Oatey
- Solvent Cements, Drains, & More for All Your Plumbing Needs | Oatey