Product Information

Product Name: PV Cable Lead/Cable Extension MC4/MC4-Evo 2

Model Number: MA070101 (dpel__eenn))

Sealing Caps: PV-BVK4 32.0716, PV-SVK4 32.0717

Product Intended Use

The PV DC connection cable is assembled on one or both sides with MC4 or MC4-Evo 2, for installation or prepared for further assembly.

Requirements for Personnel

Only an electrician or electrically instructed person may assemble, install, and commission the system.

Required Tools

PV-MS-PLS Assembly and unlocking tool, 1 set = 2 pcs Order No 326058 or Open- end spanner set PV-MS, Order No 326024

Product Usage Instruction

Safety Instructions

NOT following the assembly and safety instructions could result in life- threatening injuries due to electric shock, electric arcs,fire, or failure of the system.

Mating and Disconnecting

To mate the cable coupler, connect the MC4/MC4-Evo 2 connectors until a “click” can be heard. Check correct engagement by lightly pulling on the connector (maximum pulling force: 20 N). Do not modify or repair the component. Assembly of not fully engaged
connectors is not permitted as this could lead to a permanent deflection of clips and thus to a potential loss of the locking function. The engaged connector locking function has to be verified.

To disconnect, use PV-MS-PLS/2 or PV-MS.

Notes on Installation

Cable routing should be done with a minimum distance of 20 mm.If connectors are contaminated or damaged, they should not be used.  Mechanical stress should be avoided during installation.

Sealing caps

Safety instructions

Importance of the assembly instructions
NOT following the assembly and safety instructions could result in life- threatening injuries due to electric shock, electric arcs, fi re, or failure of the system

  • Follow the entire assembly instructions
  • Use and install the product only according to this assembly instructions
  • Safely store the assembly instructions and pass them on to subsequent users

Intended use

PV DC connection cable assembled on one or both sides with MC4 or MC4-Evo 2, for installation or prepared for further assembly

Requirements for personnel
Only an electrician or electrically instructed person may assem-ble, install, and commission the system

  • An electrician is a person with appropriate professional training, knowledge, and experience to identify and avoid the dangers that may originate from electricity. An electrician is able to choose and use suitable personal protective equip-ment
  • An electrically instructed person is a person who is instructed or supervised by an electrician and can identify and avoid the dangers that may originate from electricity

Prerequisites for installation and assembly

  • NEVER use an obviously damaged product.
  • ONLY tools and procedures approved by Stäubli shall be used.
  • When mounting a connector, the respective assembly instructions of the connector (see technical data table) must be observed.

Mating and disconnecting

Live parts can remain energized after isolation or disconnection.

  • ALWAYS de-energize the photovoltaic system before mating and disconnecting the connectors.
  • NEVER disconnect the connectors under load.
  • NEVER connect male or female part of Stäubli connector with connectors of other manufacturers.

Do NOT modify NOR repair component

  • Do NOT modify component.
  • Replace defective component.

Note: For technical data, consult the corresponding connector assembly instructions.
MC4: MA231
MC4-Evo 2: MA273, MA298
For technical questions regarding the cables used in this product, Stäubli kindly asks customers to refer to the data sheet of the cable manufacturer.

Required tools

(ill. 1)
PV-MS-PLS Assembly and unlocking
tool, 1 set = 2 pcs.
Order No. 32.6058
or
Open-end spanner set PV-MS,
Order No. 32.6024

Mating and disconnecting

Note:
Unmated connectors must be protected from any contamination using Stäubli sealing caps.

(ill. 2)
Mating:
Mate the cable coupler until a „click“ can be heard. Check correct engagement by lightly pulling on the connector (maximum pulling force: 20 N).

Attention
Assembly of not fully engaged connectors is not permitted as this could lead to a permanent deflection of clips and thus to a potential loss of the locking function. The engaged connector locking function has to be verified.

(ill. 3)
Disconnecting:
Use PV-MS-PLS/2 or PV-MS to disconnect.

Notes on installation

General notes on installation

  • Unmated connectors must be protected from environmental impact (moisture, dirt, dust, etc.) with sealing caps (socket PV-BVK4, order No. 32.0716; plug PV-SVK4, order No. 32.0717).
  • Do not mate contaminated connectors.
  • Connectors must not come into contact with any chemicals.

Cable routing

  • Cable management must allow a minimum of 20 mm of cable that exits straight from the cable seal without bending or stress. Refer to cable manufacturer specification for minimum bending radius.
  • In particular, the application notes according to Annex A of IEC 62930 must be observed.

Contaminated/damaged connectors:

  • Do not allow connectors to be contaminated by the environment (e.g. soil, water, insects, dust).
  • Do not allow the connector to be contaminated on its surface (e.g. stickers, paint, heat shrink tubing).
  • Do not allow that the connector is directly on the roofing surface.
  • Do not allow that the connector is at the lowest point of cabling where water can collect.
  • Do not allow that the connector is in standing water.
  • Do not allow cable ties to be mounted directly on the connector body.

Mechanical stress:

  • Check that the connectors are not subjected to a permanent mechanical tensile load or vibration.
  • Connectors shall not be under strain from cable management.