GOLDEN LIGHTING 6085-FM BLK-NR Camden Flush Mount Ceiling Light Instruction Manual

June 1, 2024
GOLDEN LIGHTING

GOLDEN-LIGHTING-LOGO

GOLDEN LIGHTING 6085-FM BLK-NR Camden Flush Mount Ceiling Light

GOLDEN-LIGHTING-6085-FM-BLK-NR-Camden-Flush-Mount-Ceiling-Light-
PRODUCT

Pendants & Linear Pendants Above a Kitchen Island
Center a linear pendant over the island. If hanging pendants, use one pendant for every 24″ of the island. Fixtures should hang at least 30″ above the countertop.

Pendants & Chandeliers Above a Dining Room Table
Fixtures should stay at least 30″ above the table. Use a fixture that is 12″ narrower than the width of the table.

Pendants and Chandeliers in Open Areas
The bottom should hang at least 7.5 feet from the floor. Allow clearance for any opening doors.

We appreciate your business and hope you love your new light!
Great lighting can add value and enhance the look of your home. To ensure the best lighting in your space, remember to layer your lighting. This ensures that your space will have both task and ambient lighting. Coordinating fixtures like sconces, flush mounts, and pendants can help you meet your layered lighting needs and reinforce your desired aesthetic. Install the lights with dimmers that allow you to control the level of light output at any given moment. Get function and style! Browse our site for coordinating lights and expert lighting advice. To help create the perfect look, visit www.GoldenLighting.com.

How to Identify the Fixture’s Wires

GOLDEN-LIGHTING-6085-FM-BLK-NR-Camden-Flush-Mount-Ceiling-Light-FIG-
\(4\)

  • Hot: Smooth, Black, or Transparent with Black Inner Thread

Assembly Instructions

For Customer Service, contact the place of purchase to arrange for replacement parts.

GOLDEN-LIGHTING-6085-FM-BLK-NR-Camden-Flush-Mount-Ceiling-Light-FIG-
\(5\)

IMPORTANT

  • All installation work should be done by an accredited professional.
  • Shut off the power supply at the fuse or circuit breaker!
  • Use only the specified bulbs. Do not exceed the maximum wattage!

PREPARING FOR INSTALLATION

Carefully remove the new fixture from the carton as well as the yellow bag that holds all of the parts. See the important notes above. Shut off power at the circuit breaker and remove the old fixture from the wall, including the old mounting strap.

  1. From the parts bag remove the mounting strap assembly. One end of the nipple (F) should be attached to the mounting strap (A) with hex nut (D) and washer (C) in place.
  2. Test mounting strap (A) against ceiling pan (H) to ensure that finial (G) may be threaded on nipple (F) tightly. Remove the finial (G) and place the fixture aside for later.
  3. Attach mounting strap (A) to the junction box using mounting screws (B) and a screwdriver. Tighten the screws securely.

ASSEMBLING THE FIXTURE
No Assembly Required – This item arrives assembled and ready for installation. Please proceed to the next step.

CONNECTING THE WIRES

  • Have an assistant support the fixture’s weight while completing the wiring. Refer to the wiring diagram and attach the fixture’s wires to the power supply wires from the junction box. Attach the fixture’s wires to the power supply wires from the junction box.  Connect Hot to Hot (transparent wire with black inner thread, black, or smooth wire) Neutral to Neutral (transparent wire with white inner thread, white, or ribbed wire), and Ground to Ground (transparent wire with green inner thread, green wire, or copper).
  • Twist the ends of the wire pairs together, and then twist on a wire connector. Make sure all twists are in the same direction. If there is no house ground wire coming from the junction box, locate ground screw (E) on the mounting bracket/mounting strap and wrap the fixture’s ground wire around the ground screw. Use a screwdriver to tighten the top of the ground screw (E) onto the wires and into the mounting bracket/mounting strap. Tuck the wires into the junction box.

FINISHING THE INSTALLATION

Push the ceiling pan up to the ceiling and thread the finial (G) onto the threads of the nipple (F) to secure the ceiling pan (H) in place. 6. Install light bulbs (not provided) into sockets (I) under the fixture’s specifications. Do not exceed the maximum wattage. Your installation is now complete. Turn on the power and test the fixture.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

GOLDEN LIGHTING User Manuals

Related Manuals