ALAN KD-2036D-2 Operation Lamp User Manual

June 1, 2024
ALAN

ALAN KD-2036D-2 Operation Lamp User Manual

I Brief introduction

It adopts 36 brand 3W LED bulbs as the light source, with adjustable high brightness, the lighting depth can reach 200 mm. The product is mainly composed of lamp holder, spring arm and ceiling support.
The diameter of lamp panel is 500mm, larger than the ordinary operation lamp, smaller than traditional LED shadow less lamp. Ceiling installation,double handle design, adjust light spot by the center handle.
Make up for short lighting depth and low illumination of the examination lamp, and the expensive of traditional LED shadowless light.

This product adopts wide voltage input, low voltage output power supply, stable and reliable performance; High-quality spring arm, positioning accuracy, no displacement.
Suitable for clinic operation,dental implant, plastic surgery,pet medical,and so on.

Ⅱ Performance summary

The design and production of this product strictly executes the first part of the safety requirements of medical electrical equipment GB9706.1-2007: general requirements are guaranteed in safety.

Ⅲ Main technical parameters

  1. Input voltage: AC90V~240V 50/60Hz
  2. Input power: ≤120VA
  3. Power of bulb: 3W*36
  4. Working distance: 1000mm
  5. Diameter of light spot: φ120~240mm
  6. Installation height: 2800~3200mm

Ⅳ Security tips and symbol instructions

  1. When the check lamp is in use, you should always abide by the basic safety precautions in order to avoid fire, electric shock or the risk of injury.
  2. Please read the instructions carefully, and operating according to the specifications and requirements.
  3. Before clean the product, unplug the power line, and do not use liquid or spray cleaners.
  4. Please don’t install or use the product near the water or in moisture environment.
  5. When replace the bulbs, you must turn off the power switch.
  6. Maintenance should be performed by professionals.
  7. The brightness of this examination light is very high, when you use, don’t contact with eyes directly, in case of damage.
  8. Symbol:

OFF Light off ON Light on
Brightness increase
Brightness decrease
Protect the grounding

Ⅴ Working environment

a.Environment temperature: -5℃ ~40℃
b.Relative humidity: 35%~75%
c.Atmospheric pressure: 700hPa~1060 hPa

Ⅵ Product interface (Picture 1)

①Lamp holder ②Ring handle ③Center handle ④Spring arm⑤Lampswitch ⑥Brightness adjustment ⑦Cap of connecting pole ⑧Horizontal pole ⑨Decoration cover ⑩Button of center handle○11 Center tube ○12 Damping screw ○13 Fixed base board ○14 Horizontal substrate ○15 Power box ○16 Fixed screw for decorative cover

Ⅶ Usage

  1. Check before use
  2. Open the package,check whether it is damaged or not.
  3. Check whether the model、name and quantity are in keeping with“packing list”;Please contact with factory or distributor in time to get properly resolved if you find something incorrect.
  4. Read the instructions carefully and follow the installation steps.

2.Installation

  1. Position selection : The first step is to install the “fixing and leveling”device, which is inside of the decoration cover⑨and consists of thefixed base board○13 , the horizontal substrate○14 and the power box○15
    (Picture 1-9).
    Its installation is in housetop, the biggest arm span is 1.92M, accordingly, the distance between fixed base board and all round wall cannot be less than 1.95m, the distance from housetop or decorations to the ground cannot be less than 2.4m, it is advisable to be in  commonly installation height 2.8m to 3.2m.

  2. Preparation of embedded parts: In the selected position, the size position of the embedded parts shall be drawn according to the requirements of Picture 2-1. The embedded parts shall be welded on the slab reinforcement with M12 screws, or embedded in the concrete pouring layer with piercing screws. The screws can be downward beyond the top surface by 70-80mm.
    When the suspended ceiling is needed, the transition bridge shall be welded in the selected position before the suspended ceiling. The installation surface and the suspended ceiling shall be in the same plane. The connection between the roof and the bridge can still adopt the above method .[Note: Expansion screws are not allowed to be installed in this product]
    Picture 2

  3. Fixed base board:Install the board according to Picture 3-A、B, tighten screws .[Note:After fix the board, screw 4 nuts on 4 downward bolts, the reserved length is about 50mm,as shown in Picture 3-C、D]

  4. Center tube: The center tube, horizontal substrate○14 , Horizontal  pole⑧, decorative cover⑨, power box○15 and fixing ring○16 of theoperating lamp are assembled together before leaving the factory.
    During installation, the four mounting holes○14 on the horizontal substrate should be aligned with the four bolts of fixed base board○13 , and then screw on the nuts. Do not tighten them first, use the level  device to adjust the horizontal state of the horizontal rod⑧left, right andfront and rear respectively. After horizontal adjustment, tighten a total of 8 nuts above and below the horizontal substrates [Note:Pleaseregularly check the nuts for tightness,if they are loose,tighten intime]. AC power line connection: L-red line, N-blue line, yellow-greenline – ground (shown in Picture 4-1).And wrap it with insulatingtape,insert into the gap between the fixed base board and the horizontal substrate. Finally, push the decoration cover⑨and tighten thefastening screws○16 of the decoration cover (Picture 4-2).
    Picture 4

  5. Spring arm: Remove the four screws on the rotate axis of springarm④, open the connecting cap⑦(Picture 5-1),connect the springarm④ with the pole, and pull out the power line from the link pole, install and fix the four screws, docking the power cord plug, put on the cap of the pole (As shown in Picture 5-2).
    Picture 5

  6. Installation of lamp holder: Unscrew the screw on cover of crescent pin, push up and remove the crescent pin, then connect the lamp holder① and the spring arm④ according to Picture 6-E,the order of 1、 2、3;That is :First step, docking the power connector. Second step, install the crescent pin. The third step, put down the cover and fix it. Finally, press the button⑩ of the center handle in Picture 6-F, the guide groove of the center handle③ must be pushed in place, loosen the button to pop, the installation of operation lamp is completed.

    Picture 6

Usage:

  1. Close the main control switch,,press the key ON to turn on lamp switch⑤,the lamp light on.
  2. Press the Brightness adjustment⑥ could change the brightness of the lamp; key ▲ brightness increase, brightness decrease.
  3. Rotate the center handle③ could change the size of light spot, realizethe focusing function.
  4. Hold the center handle③ or ring handle②up and down, left and right to adjust the height of the lamp holder and lighting angle; It is alsopossible to change the angle and the range of illumination by rotatingthe spring arm④ and horizontal pole⑧ left and right.
  5. When in using, in the case of rotate axis is too alive or too tight, youcan use allen wrench to adjust damping screws; Spring arm adjustment method is the same.
  6. After usage of operation or examination, press the button⑩of centerhandle to remove handle and sterilize it.

Attentions

  1. Please pull out the power plug before clean the lamp, do not use liquidspray to clean it.
  2. When install the lamp, please assemble and reinforce it according tothe instruction of the technical requirements.
  3. Installation with expansion screws is prohibited.
  4. Do not use the lamp near water.
  5. The repair, installation and commissioning of the operation lampshould be performed by professionals.
  6. The light intensity is high, you should be cautious in use with your eyes.

Failure judgment and eliminating methods

(This link requires professional operation)

Failure phenomenon Reason Solution
1. The master switch is not closed Close the master switch

The lamp doesn’t work

| 2. The lamp switch⑤ is not turned on| Turn on the switch⑤ with key ON
---|---|---
3. The brightness adjustment⑥ at theminimum position| Press the brightness adjustment⑥ ▲ to the maximum.
4. Poor contact with docking plug between spring arm andhorizontal pole.| Open the cap⑦,re-docking again
5. Poor contact withdocking plug of lamp holder①| Remove the lamp holder①, re-docking

Bulb replacement

The bulb is LED light source,the normal life up to 10000 hours,no need to replace normally. In case of any failure, please inform the manufacturer in time for processing.

After-sales service

  • The product warranty period is 18 months
  • During warranty period, Send or give us your warranty and purchase invoices, we will provide free maintenance service when you have quality problems.
  • Light bulbs are consumable accessories.
  • If you modified the function by yourself and then it does not work , is not covered under warranty.
  • If the marks on the product such like model, serial number, date of manufacture has been altered, deleted, moved, or unidentifiable, will not provide free warranty service.
  • If moving falling, squeezing, soaking, moisture and other failures caused by human factors can not enjoy our free warranty service.
  • The production date shown on label, service life is 5 years, we provide lifetime maintenance.

Transportation and storage condition

Environment temperature: -40℃~55℃
Relative humidity: 30%~80%
Atmospheric pressure: 500hpa~1060hpa

Electrical schematic diagram and components list

N0. Material Specification Quantity Remar k
1 Circuit    board 7D1A 1
2 Field-effect tube SL20C20U 1
3 Filter choke 220mH 1
4 Inductance 470mH 1
5 Capacitance F103M/2KV 3
6 Capacitance 22nj/T100V 1
7 Capacitance 102M/2KV 1
--- --- --- --- ---
8 Electrolytic capacitor 50V/1uf 1
9 Capacitance 222J/250V 1
10 Capacitance 102J/100P 1
11 Electrolytic capacitor 50V/4.7uf 3
12 Electrolytic capacitor 50V/22uf 1
13 Electrolytic capacitor 50V/47uf 1
14 Electrolytic capacitor 50V/1000uf 2
15 Electrolytic capacitor 250V/470uf 2
16 Capacitance 22nj/T100V 1
17 Capacitance 102M/2KV 1
18 Electrolytic capacitor 50V/1uf 1
19 Capacitance 222J/250V 1
20 Capacitance 102J/100P 1
21 Electrolytic capacitor 50V/4.7uf 3
22 Electrolytic capacitor 50V/22uf 1
23 Electrolytic capacitor 50V/47uf 1
24 Electrolytic capacitor 50V/1000uf 2
25 Electrolytic capacitor 250V/470uf 2
26 CBB capacitor 400V/105J 1
27 Filter capacitor 0.1uf 2
28 Resistance 150K/0.25VA 1
29 Resistance 15Ω/0.25VA 2
30 Resistance 120KΩ/0.25VA 1
31 Resistance 12KΩ/0.25VA 1
32 Resistance 10KΩ/0.25VA 1
33 Resistance 1KΩ/0.25VA 1
34 Resistance 22KΩ/0.25VA 1
35 Resistance 15KΩ/0.25VA 1
36 Resistance 5.6KΩ/0.25VA 2
37 Resistance 560Ω/0.25VA 1
38 Resistance 1.2KΩ/0.25VA 1
39 Resistance 3.9KΩ/0.25VA 1
--- --- --- --- ---
40 Resistance 680KΩ/0.25VA 1
41 Resistance 1.5KΩ/0.25VA 1
42 Resistance 100KΩ/0.25VA 1
43 Resistance 4.7KΩ/0.25VA 1
44 Resistance 220Ω/0.25VA 1
45 Resistance 150KΩ/0.25VA 5
46 Resistance 2Ω/0.25VA 2
47 Resistance 22K/0.25VA 2
48 Resistance 24Ω/0.25VA 2
49 Resistance 3.9K/0.25VA 2
50 Resistance 100Ω/3VA 1
51 Resistance 680Ω/3VA 1
52 Diode F107 6
53 Diode IN4752 2
54 Diode IN4148 2
55 Audion 1815 3
56 Thermistor 5D-15 1
57 Piezoresistor 10D471K 1
58 Integrated circuit LM494 1
59 Rectifier bridge KBU810 1
60 Bulb LED 36

Any products may be updated or improved. The change of circuit orelement specifications of the product will not with prior notice.

Warranty card and maintenance card

Warranty card

Company name:

Address| | Phone No.|
Product name| | Model|
Serial Number| | Manufacture-date|
Sale date| | |
Fault description:
Remark: The warranty of our products is 18 months since the release date.

(Please truthfully fill in this form, cut it according to the dotted line and send it back to our company, thank you for your cooperation)

Maintenance card

Company name:

Address| | Phone No.|
Product name| | Model|
Serial Number| | Manufacture date|
Sale date| | |
Fault description:
Remark: You can enjoy seventy percent discount for the maintenance services even if you use this card over the quality assurance period.

Configuration list

No. Name Specification Quantity Remark
1 Lamp holder LED 108W 1
2 Spring arm Ceiling type 1
3 Center adjustinghandle 1
4 Tool 口 No. 4 Allen wrench口 No. 3 Allen wrench口 No. 6 Allen wrench Each
1pc
5 User manual A5 1
6 Quality certificate 1
7
8
9
10
11
12
13

Notice: Please check the goods according to the configuration list within3 days after receiving the goods.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals