BELLEVUE MVLP37828MTBG Mottled Black Gold Zuri 4 Light 18 Wide Taper Candle Pendant Instruction Manual
- June 1, 2024
- BELLEVUE
Table of Contents
BELLEVUE MVLP37828MTBG Mottled Black Gold Zuri 4 Light 18 Wide Taper
Candle Pendant
Tools Required: Flathead screwdriver, Phillips screwdriver, pliers, wire
cutters, wire strippers, electrical tape, safety glasses, ladder
Helpful Tools (not included): Wire strippers
Bulb Recommended: (4) Candelabra Base 60W Maximum, Alternate (4) LED
bulb. Estimated Assembly Time: 40 – 60 minutes
Preparation:
- Identify and inspect all parts before beginning installation
- Check package contents list and diagrams below to be sure all parts are included . If any parts are missing or damaged, do not attempt to assemble, install or operate the fixture.
Warnings And Cautions
- Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
- These instructions are provided for your safety. It is very important you read them completely before installing fixture. We strongly recommend that a licensed, professional electrician perform the installation.
- Disconnect fixture from power source before replacing bulbs .
- Make sure bulbs are given sufficient time to cool before removal.
- Do not subject glass parts to any shock while in operation or shattering may result.
Package Contents
PART
A B
| DESCRIPTION
- Crossbar Assembly
- Green Ground Screw
- (Pre-assembled to Crossbar)
| QUANTITY
- 1 pc
- 1 pc
| Stock Part#
913088KIT
---|---|---|---
C| Wire Connector| 3 pcs
D E|
- Outlet Box Screw
- Quick Link
|
- 2 pcs
- 2 pcs
F| Ceiling Canopy| 1 pc
G H|
- Fixture Chain
- Rod with Fixture Loop
|
- 1 pc
- 1 pc
| M2455CHMB N/A
I j|
- Center Column
- Side Arm
|
- 1 pc
- 3 pcs
K| Rod| 1 pc
L M|
- Socket Assembly
- Shade
|
- 1 pc
- 1 pc
NOTE: ALL DIMENSIONS ARE ROUNDED UP TO THE NEAREST 1/2″
STEP 1
For 8 foot ceilings:
- Thread the rods onto the socket assembly.
- Thread the center column onto top end of the rod.
- Hand tighten until snug.
- Remove the fixture loop and nipple from end of rod.
- Pass supply wires and ground wire through the nipple and fixture loop.
- Thread the nipple and fixture loop onto top end of the center column.
- Hand tighten until snug.
For 9 foot ceilings and higher:
- Thread the rods onto the socket assembly.
- Thread the center column onto top end of the rod.
- Hand tighten until snug.
- Pass supply wires and ground wire through the rod with fixture loop.
- Thread the rod with fixture loop onto top end of the center column.
- Hand tiqhten until snuq.
STEP 2
- Secure the crossbar to the outlet box (not included) with outlet box screws.
- Tighten until snug.
- Note: The preassembled mounting nipple on the crossbar should protrude outward.
STEP 3:
- Remove the pre-assembled canopy lock ring from the crossbar assembly.
- Temporarily attach the ceiling canopy to the pre-assembled nipple on the crossbar assembly.
- Secure with canopy lock ring.
Note: If the ceiling canopy is not snug against the ceiling, remove it from the crossbar assembly and adjust the length of the pre- assembled nipple by unscrewing the pre-assembled hex nut. Screw the nipple in or out of the crossbar until the correct length is achieved. Then, re-attach the ceiling canopy.
STEP 4:
- Choose desired hanging length for the light fixture. Suggested mounting height over a table or island is 30 inches from the table/island top to the bottom of the fixture.
- Adjust the Fixture Chain to the desired length, removing links if needed.
- Connect one end of the Fixture Chain to the canopy chain loop preassembled to Crossbar Assembly with one Quick Link.
- Connect the other end of the Fixture Chain to the fixture loop with the remaining Quick Link.
Note: You may need to use pliers (not included) to open the links of Fixture Chain.
- If so, put a cloth over the Fixture Chain to protect the finish from the pliers.
- Suggested chain length to hang fixture 30 inches above table top:
- 8-ft. ceiling: 7 inches of chain+ 2 quick links (rod with fixture loop not used)
- 9-ft. ceiling: 7 inches of chain+ 2 quick links
- 10-ft. ceiling: 19 inches of chain+ 2 quick links
STEP 5:
Confirm that the mounting height is acceptable. Refer to
STEP 4 if changes are required.
Note: To make the next step easier, cut the supply wire and ground wire
24 inches longer than the distance from the fixture loop to the ceiling.
Important: Please pay attention to the polarity (wires labels L & N) when
cutting wires. Wire identification will be needed in
STEP 7.
- Pull the Supply Wires and Ground Wire up through the Fixture Chain alternating links.
- Push the ends of the supply wires and ground wire up through the canopy chain loop and into the outlet box.
- The remaining slack wire will be pushed into the box in
STEP 6.
STEP 6:
- Unthread the canopy lock ring.
- Slide canopy lock ring and ceiling canopy down the quick link.
- Push all slack fixture wire through canopy chain loop and into the outlet box.
- Trim excess fixture wire leaving a minimum of 6 inches hanging out of the outlet box.
- Separate the smooth side and ribbed side of the supply wire to about 3 inches from the end.
- Using wire strippers, strip each wire½ inch from the end.
STEP 7:
- Use Wire Connectors (supplied) to connect the wires.
- Ground Wire:
- Wrap supply ground wire around green ground screw on mounting bracket, no less than 2 in. from the end of the wire. Tighten ground screw.
- Connect fixture ground wire to supply ground wire with wire connector.
- Supply Wire:
- Connect the supply white wire to the fixture supply wire (ribbed sided) from fixture identified with the label “N”.
- Connect the supply black (or red) wire to the fixture supply wire (smooth side) from fixture identified with the label “L
- Wrap each connection with approved electrical tape and carefully stuff all of the connected wires into the outlet box.
- STEP 8:
- Attach the ceiling canopy back over the canopy chain loop.
- Secure with canopy lock ring.
STEP 9:
- NOTE: Two people are recommended for this step.
- Attach hook from side arm to the loop on the shade.
- Rotate the arm so that the hook is facing down. Attach loop from side arm to the hook on the ceiling hook.
- Repeat steps above with the remaining side arms.
STEP10:
- Install correct bulbs referring to fixture markings and/or labels for maximum wattage.
- Your installation is now complete! Restore electricity and save this sheet for future reference.
CARE AND MAINTENANCE
Wipe clean using soft, dry cloth or static duster. Always avoid using harsh chemicals and abrasives to clean fixture as they may damage the finish.
TROUBLESHOOTING
PROBLEM POSSIBLE CAUSE CORRECTIVE ACTION
Bulbs will not light.|
- Bulb is burned out.
- Power is off.
- Faulty wire connection.
- Faulty switch.
|
- Replace light bulb.
- Make sure power supply is on.
- Check wiring.
- Test or replace the switch.
---|---|---
Fuse blows or the circuit breaker trips when light is turned| Crossed wires or
power wire is grounding out.| Check wire connection.
on.| |