LNC A05009C Engaveric 8-Light Polished Gold with Textured Glass Tiered Modern/Contemporary LED Dry rated Chandelier Instruction Manual

May 15, 2024
LNC

~~~~

LNC A05009C Engaveric 8-Light Polished Gold with Textured Glass Tiered

Modern/Contemporary LED Dry rated Chandelier

LNC-A05009C-Engaveric-8-Light-Polished-Gold-with-Textured-Glass-Tiered-
Modern-Contemporary-LED-Dry-rated-Chandelier-product

Product Information

Specifications

  • Item Number: A05009C
  • Voltage: 120V
  • Maximum Wattage: Type B, Max 40W per bulb

Product Usage Instructions

Installation

We strongly recommend that the installation of this product be done by a licensed electrician. However, if you choose to install it yourself, please follow these instructions:

  1. Read the instruction manual carefully and save it for future reference.
  2. Before starting any work, make sure to shut off the electricity.
  3. Ensure that the mounting surface is clean, dry, flat, and strong enough to hold the product.
  4. The mounting surface should be 1/4 larger than the canopy on all sides. If any gaps are exceeding 3/16, correct them as required.
  5. Make sure that the ceiling or wall can support the weight of the lamp before installation.

Safety Precautions

  • Keep the lamp away from acidic and alkaline substances to avoid damaging its surface.
  • When replacing bulbs, turn off or unplug the lamp and wait until it is cool, as bulbs can get hot quickly.
  • Use caution and common sense when working with electrical products.

Tools Required

Before starting assembly and installation, make sure you have the following tools:

  • Ladder
  • Philips Head or Flat Blade Screwdriver
  • Electrical Tape
  • Pliers
  • Wire Cutter/Stripper

Parts Included

The product comes with the following parts:

  • (C) Single bar (1)
  • (D) Green ground screw (1)
  • (E) Canopy (1)
  • (F) Collar ring (1)
  • (G) Collar loop (1)
  • (H) Quick link (2)
  • (I) Chain (1)
  • (J) Loop (1)
  • (K) Socket assembly (1)
  • (L) Hook
  • (M) Glass sheet (80)
  • (N) Socket (8)

Assembly and Installation Instructions

  1. Carefully remove the fixture from the carton and ensure that all parts and accessories are included.
  2. Using chain pliers, disconnect and discard any unwanted parts.
  3. Attach the chain to the top of the socket assembly (K) until you reach the top of the chain (I). Gently pull the wires to ensure they are not stressed.
  4. Mount the single bar (C) to the mounting surface using the provided mounting screws (B).
    • Note: The side of the single bar marked GND must face out.
  5. Ensure that the canopy (E) is snug against the ceiling and that the collar loop (G) is screwed with enough threads (no less than 6 threads) on the preassembled threaded nipple for secure hanging. Adjust the collar loop (G) on the single bar (C) if necessary.
  6. Pass the fixture wires through the collar loop (G) to the top of the pre-assembled threaded nipple. Gently pull to ensure the wires are not stressed.

FAQ

Q: What should I do if my mounting surface has gaps exceeding 3/16?

  • A: Correct any gaps exceeding 3/16 as required before installation to ensure a secure mounting surface.

Q: Can I replace the bulbs while the lamp is still on?

  • A: No, when replacing bulbs, you should turn off or unplug the lamp and wait until it is cool to avoid burning yourself.

Q: Are all the necessary tools included with the product?

  • A: No, you need to prepare your tools before starting assembly and installation. The required tools are listed in the instructions.

INSTALLATION INSTRUCTION

Item Number: A05009C

WARNING (To reduce the risk of fire, electric shock, or personal injury):

  1. We suggest installation by a licensed electrician.
  2. Please read the instructions carefully and save them as you may need them at a later time.
  3. Before you start, NEVER attempt any work without shutting off the electricity until the work is done.
    • Go to the main fuse, or circuit breaker, box in your home.
    • Place the main power switch in the “OFF” position.
    • Place the wall switch in the “OFF” position.
  4. The mounting surface should be clean, dry, flat, strong enough, and 1/4” larger than the canopy on all sides. Any gaps between the mounting surface and canopy exceeding 3/16” should be corrected as required.
  5. Make sure that the ceiling or wall can stand the weight of the lamp before installation.
  6. Make sure the voltage you are using is 120V. The maximum wattage is Type B, with a max of 40W per bulb.
  7. Keep the lamp away from acidic and alkaline substances in case of damaging the surface of the lamp.
  8. When replacing bulbs, you should turn off or unplug the lamp and you must wait until it is cool as bulbs get hot quickly.
  9. The safety instructions appearing in this manual are not meant to cover all possible conditions that may occur.
    • It must be understood that common sense, caution, and care must be used with any electrical products.

IMAGE FOR FINISHED PRODUCT

TOOLS REQUIRED

(NOT INCLUDED):

Before starting assembly and installation please prepare the needed tools as below pictureLNC-A05009C-Engaveric-8-Light-Polished-Gold-with-Textured-
Glass-Tiered-Modern-Contemporary-LED-Dry-rated-Chandelier-
fig-2

PARTS TYPE & QTY INCLUDING

LNC-A05009C-Engaveric-8-Light-Polished-Gold-with-Textured-Glass-Tiered-
Modern-Contemporary-LED-Dry-rated-Chandelier-fig-3

  • (C) Single bar (1)
  • (D ) Green ground screw (1)
  • (E) Canopy (1)
  • (F) Collar ring (1)
  • (G) Collar loop (1)
  • (H) Quick link (2)
  • (I) Chain (1)
  • (J) Loop (1)
  • (K) Socket assembly (1)
  • (L) Hook
  • (M) Glass sheet (80)
  • (N ) Socket (8)

ACCESSORIES & QTY ENCLOSED:

  • (A) Wire connector (3)
    (B) Mounting screw (2)

  • (M) Glass sheet (2) (spare parts)

ASSEMBLY & INSTALLATION INSTRUCTIONS

  1. Carefully remove the fixture from the carton and check that all parts and accessories are included as shown in the above illustration.
  2. Make pre-installationLNC-A05009C-Engaveric-8-Light-Polished-Gold-with-Textured-Glass-Tiered-Modern-Contemporary-LED-Dry-rated-Chandelier-fig-4
    • Step A1 » By measuring, determine the correct number of links needed for proper hanging height. Using the chain pliers, disconnect and discard the unwanted parts.
    • Step A2 » Pass the fixture wires through the loop (J), and then screw loop (J) onto the top of socket assembly (K).
    • Step A3 » Attach quick link (H) to chain (I) and loop (J) on the top of socket assembly (K) as shown in the illustration.
    • Step A4 » Carefully weave the fixture wires through the chain (I) in and out of every other link and stop just when you reach the top of the chain (I).
    • Gently pull the wires to ensure they wires are not stressed.
  3. Turn off power
    • Before you start the installation, NEVER attempt any work without shutting off the electricity until the work is done.
    • Go to the main fuse, or circuit breaker, box in your home.
    • Place the main power switch in the “OFF” position.
    • Place the wall switch in the “OFF” position.
  4. Make installationLNC-A05009C-Engaveric-8-Light-Polished-Gold-with-Textured-Glass-Tiered-Modern-Contemporary-LED-Dry-rated-Chandelier-fig-5
  • Step B1 » Remove collar ring (F) from collar loop (G). Attach single bar (C) to the outlet box with mounting screws (B).
  • Note: the side of the single bar (C) marked “GND” must face out.
  • Step B2 » Raise canopy (E) over collar loop (G) and screw collar ring (F) to measure a proper position.
  • NOTE: canopy (E) should be snug against the ceiling and collar loop (G) should be screwed with enough threads (no less than 6 threads) on the pre-assembled threaded nipple for more secure hanging.
  • If not, adjust the collar loop (G) on the single bar (C) by screwing the collar loop (G) in or out of the single bar (C) until the secure length is achieved.
  • Step B3 » Pass chain (I) through collar ring (F) and then through canopy (E).
  • Step B4 » Open quick link (H), attach quick link (H) to collar loop (G). Close quick link (H).
  • Pass the fixture wires through the collar loop (G) to the top of the pre-assembled threaded nipple and gently pull to ensure the wires are not stressed.
  • Step B5 » If needed, shorten the length of fixture wires. At this point, the remaining wire length measured above the single bar (C) is at least 6″.
  • Step B6 » Make wire connections Connect wires as below wires connection shown. PLEASE NOTE THAT GROUND WIRE IS BARE COPPER WIRE, NEVER CONNECT OTHER WIRES TO GROUND WIRES.

Connect ground wires according to the below chart

Connect wires according to the below chart

  • Twist wires together with plastic wire connectors until tightly joined.
  • Wrap each connector with approved electrical tape.
  • Be sure that no wire strands are exposed and then carefully tuck all wires into the outlet box.
  • Step B7 » Raise canopy (E) to the ceiling and secure canopy (E) in place by tightening collar ring (F) onto collar loop (G).
  • Step B8 » 1) Install bulbs (not included) (Please do not exceed the maximum wattage recommended on the socket.)
  • When installing the bulb, if the bulb touches the socket, you can adjust the angle of the socket as shown in the illustration.
  • Hang glass sheets (M) on hooks (L) from inside to out as shown in the illustration.
  • Check everything is already installed properly, then you can turn on the light. Enjoy!

ORDERING PARTS

  • Keep this sheet for future reference in case you need to order replacement parts.
  • All parts for this fixture can be ordered from the place of purchase.
  • Be sure to use exact wording from illustrations when ordering parts.

CLEANING

  • To clean, wipe the fixture with a soft cloth. Clean glass with a mild cleaner (such as mild and non-abrasive soap).
  • Do not use abrasive materials such as scouring pads or powders, steel wool, or abrasive paper.
  • +1 850 296 2377 Working hours: Mon – Fri 9:00 – 16:00 EST
  • [email protected]

Documents / Resources

| LNC A05009C Engaveric 8-Light Polished Gold with Textured Glass Tiered Modern/Contemporary LED Dry rated Chandelier [pdf] Instruction Manual
A05009C Engaveric 8-Light Polished Gold with Textured Glass Tiered Modern Contemporary LED Dry rated Chandelier, A05009C, Engaveric 8-Light Polished Gold with Textured Glass Tiered Modern Contemporary LED Dry rated Chandelier, Polished Gold with Textured Glass Tiered Modern Contemporary LED Dry rated Chandelier, Textured Glass Tiered Modern Contemporary LED Dry rated Chandelier, Glass Tiered Modern Contemporary LED Dry rated Chandelier, Contemporary LED Dry rated Chandelier, LED Dry rated Chandelier, rated Chandelier, Chandelier
---|---

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

LNC User Manuals

Related Manuals