Commercial Electric 4FT Led Strip Light Installation Guide

June 13, 2024
Commercial Electric

Commercial Electric 4FT Led Strip Light

IMPORTANT
Before assembling your fixture, please make sure that you carefully read through this instruction sheet. Consider having your fixture installed by a qualified licensed electrician.
Note: The important safeguards and instructions that appear in this sheet are not meant to cover all possible conditions and situations that may occur. It must be understood that common sense, caution, and care are factors that cannot be built into any product. These factors must be supplied by the person(s) caring for and operating the fixture.

General Wiring Diagram

Wiring Diagram With Emergency

Commercial-Electric-4FT-Led-Strip-Light-fig-2

Wiring Diagram With Emergency and Sensor

Commercial-Electric-4FT-Led-Strip-Light-fig-3

Note
In the case of 208 or 240 line voltage, the 2nd hot leg will be connected to the white lead coming from the fixture.

WARNING

  • Turn off electrical power at the fuse or circuit breaker box before wiring the fixture to the power supply.
  • Turn off the power when you perform any maintenance.
  • Verify that the supply voltage is correct by comparing it with the luminaire label information.
  • Modifications to the product void the warranty.

Surface Mount Installation

Commercial-Electric-4FT-Led-Strip-Light-fig-4

  1. Bolt the brackets to ceiling, beam, joist, or rain(bolts not included). Press open left and right double ends plastic fixing fixture.
  2. Connect the wiring in accordance with the wiring diagram in these specifications. If dimming is not required, then keep caps on dimming leads.
  3. Then mount the fixture onto the ceiling with mounting crews.
  4. When the wire connection is completed, screw the wiring cover, align and fasten the left and right plastic clamps. Installation completed.

Chain Hang Installation

Commercial-Electric-4FT-Led-Strip-Light-fig-4

  1. Install the hanging hooks (included) onto the top of the fixture. Make sure the wiring hangers are fully engaged into the holes on the top channel.
  2. Hook the chain onto the hanging hooks, then onto the ceiling anchors (not provided).
  3. open the wiring cover and make the wiring connections with the terminal cap (refer to the General Wiring Diagram), then replace the wiring cover.
  4. Installation completed.

Linkable Installation

Commercial-Electric-4FT-Led-Strip-Light-fig-6

  1. Press open left and right double ends plastic fixing fixture.
  2. Connect the wiring in accordance with the wiring diagram in these specifications. If dimming is not required, then keep caps on dimming leads.
  3. For surface mounting, screw the fixtures onto the ceiling and re-affix the lens and end caps onto the fixtures.
  4. For chain hanging, hook the chain onto the hanging hooks, then onto the ceiling anchors (not provided).
  5. Installation completed.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Commercial Electric User Manuals

Related Manuals