VODALAND HEXpave Grid System Installation Guide

June 12, 2024
VODALAND

VODALAND-logo

VODALAND HEXpave Grid System

VODALAND-HEXpave-Grid-System-product

Product Information

The Vodaland HEXpave Grid System is a versatile product designed for ground preparation and installation of various surfaces. The grid system is 1 inch in height and is suitable for light to medium loads when filled with gravel. It also has the option to utilize installation anchors for incline installations. The HEXpave Grid System is perfect for projects such as ground preparation, creating walking paths, and supporting grass or sod growth.

Product Usage Instructions

Ground Preparation

  1. Remove all large rocks and debris from the area.
  2. If installing on existing grass, scan the area to ensure there are no obstacles that may prevent the grid from laying flat.
  3. Compact the soil (sub-base) and lay geo-textile (optional).
  4. Add a gravel or crushed stone base according to the installation schematics on the website. Compact the area tightly and ensure it is flat.
  5. Ensure that the ground is prepared to your liking as the HEXpave grid will follow its contour.

Connection

  1. The HEXpave units have male and female ends. Align and insert the male clip ends into the female connection points.
  2. If cuts are necessary, it is recommended to make them before connecting the units. Cutting can be done using a hand saw or jig saw.
  3. If a unit needs to be removed after connection, be aware that it may cause other units to move. Only remove units if necessary.

Anchor/Fill:

  1. Anchoring is only necessary for incline installations. The HEXpave grid can effectively work up to 10 degrees of incline.
  2. There are 5 anchor holes in each grid. It is recommended to use one to two anchors per grid if needed.
  3. Filling the grid is simple. Avoid driving on the HEXpave while filling. A wheelbarrow or small bobcat/cart can be used for this purpose.
  4. If overfilling the grid, keep in mind that the excess gravel will be considered loose. It is recommended to have the gravel flush with the HEXpave for a long-lasting installation.
  5. If using soil or sod, fill the grid to the top with soil and plant seed or lay sod on top and press it within the grid.
  6. If not using any fill and laying the grid on grass, anchor it down to prevent it from floating.

Remember to take your time and ensure you are satisfied with the grid layout before filling, as it will determine the final appearance of the installation.

Introducing Vodaland HEXpave Grid System!
1 Inch in height. It’s designed for light to medium loads (when filled with gravel), and even comes with the ability to utilize installation anchors (optional). The HEXpave Grid System is the perfect product for projects such as:

  • Shed Bases
  • Hot Tub Bases
  • Light Weight Parking
  • Patio Installations
  • Walking Paths
  • Driveway Extensions
  • Athletic Courts
  • Paver Bases
  • Turf Installation

Ground Preparation

  1. Preparing your ground for our HEXpave grid is extremely important. You want to make sure you have a nice, smooth surface. We do not like to say «level», because that is an overstated term. However; just make sure you smooth the area out.
  2. We recommend removing all large rocks, and debris from the area. If putting on grass which is already in place, we still recommend scanning the area to make sure nothing is in the way from it laying flat on the grass or ground.
  3. Compact your soil (sub-base), lay geo-textile (optional), and add gravel/crushed stone base.
    • Please refer to the installation schematics on our website for instructions on the amount of base required for your application. Compact the area tight and flat.
  4. Remember, the HEXpave grid will follow the contour of your ground preparation. So, it is very important to make sure that the ground is exactly the way you like it.
  5. Before laying down the HEXpave, give your ground a slight sprinkle of water with the hose. This will make installation much easier with a little «give» to your foundation.

Connection

Connecting the Hexpave units is extremely simple. However here are a couple of answers/directions to the most common issues and questions.

  1. There are male and female ends on the grid (two of each). The male clip ends are aligned and inserted into the female connection points.
  2. To make the hard-fastened connection, hold down one grid and pull up on the other. This makes a «snap» lock that you will feel and also hear.
  3. If you need to make cuts, we recommend doing this before connection. You can after, but removing the units after connection can move the other units that you already installed. Cutting is simple, hand saw or jig saw will do the trick!
  4. Disconnecting is just as easy as connecting. You will «tip up» the HEXpave grid and the male and female locks will come apart. We only recommend doing this if you made a mistake (obviously), or if you need to replace a unit in the future.

AND THAT IS IT!
Make sure you are 100% happy with the grid layout before you fill because that is the way it’s going to look. Take your time, do it right, do it once.

Anchor/Fill

  1. Anchoring is only necessary if you are creating a walking path up a slight hill, or any other type of incline installation.
    • The Hexpave grid can work up to 10 degrees effectively. So, remember that when you create your installation design.
  2. There are 5 anchor holes in the grid. If you choose to utilize the optional  anchors, we really only recommend one to two per grid. The holes are there in case you make cuts so you still have options to anchor after the cut. But of course, you don’t have to anchor in all those spots within one grid.
  3. Filling your grid could not be simpler. We do not recommend driving on the hexpave when you are filling but a wheel barrow or small bobcat/cart would be just fine.
  4. If you choose to overfill your grid, always keep in mind that is going to be considered loose gravel. We recommend the gravel be flush with your HEXpave to make for a nice long-lasting installation.
  5. If you are utilizing soil or sod, please fill the grid to the top with your soil, then plant seed. If you are using sod, please fill the grid to the top with soil, then lay sod on top and press within the grid.
  6. If you are not doing any fill and laying down over grass to grow through, then you are finished. But if laying on grass without fill, please do anchor down so your grid is not just floating on the grass.

FAQ’s

Can I cut the grid?

Yes, you can absolutely cut the HEXpave. Please just note that if you do, you won’t be able to connect on the cut side. Best to use a hand saw or a good table saw to make your cuts.

Can HEXpave go on inclines?

You can use the HEXpave on very slight inclines up to 5 degrees, and if so, must be anchored down. This is primarily for walking path areas and should not be driven on in an incline installation.

  • Vodaland fully stands behind each and every one of our products. We always urge our customers to email or call us with any questions. If you ever have any issues or concerns, we would like to hear them, please send us an email at info@vodaland.ca

Thank you again for your business!

  • Please note: All the specifications, drawings, and installation schemes can be found and downloaded on our website. Go to the product page and you’ll find tabs for all these options at the bottom of the page. Installation videos can also be found on YouTube at: Vodaland Canada.