KOZY HEAT Bayport 36 Direct Vent Fireplace Instructions

June 10, 2024
Kozy Heat

Bayport 36 Direct Vent Fireplace

Please leave these reference guides at the installation location until the installation is finished. See owners manual for full installation and finishing instructions before making final decisions as information is subject to change.

Specifications

(all measurements are in inches)

  • GAS LINE OPENING: RIGHT SIDE
  • ELECTRICAL ACCESS: LEFT SIDE

Model| BTU| Height| Front Width| Back Width| Depth| Glass Viewing
Area
---|---|---|---|---|---|---
Actual| Framing| Actual| Framing| Actual| Framing| Actual| Framing
BAY‐36 (all versions)| 26,500| 32| 42| 35‐3/4| 36‐1/4| 18‐7/8| 36‐1/4| 15‐13/16| 15‐7/8| 29‐1/4 x 23‐3/4

Framing Opening

KOZY HEAT Bayport 36 Direct Vent Fireplace

Finishing Clearances

KOZY HEAT Bayport 36 Direct Vent Fireplace - CombusƟble Material
Allowed

Finish Trim Kit

Important! If you are finishing around the fireplace with le or stone make sure that you install the Finishing Trim Kit at the framing stage.
The trim kit allows for your finishing board and your le/stone to finish up against, creating a shadowbox for the face to sit inside.
Do not use with RSF fronts, all other fronts apply.

Mantel Clearances

NOTE: The clearances allowed here are ONLY for Safety Screen Fronts with part numbers that include the number 2 ( Example: #B36‐PSF2 )
Clearances outlined in this drawing are for installations with screen front

B36‐RSF2 ONLY ![KOZY HEAT Bayport 36 Direct Vent Fireplace - CombusƟble

Material Allowed 1](https://manuals.plus/wp-content/uploads/2023/04/KOZY-HEAT- Bayport-36-Direct-Vent-Fireplace-CombusƟble-Material-Allowed-1.jpg)

Dimension BAY‐36
O 32
P 1‐1/2
Q 3/4
R 5
S 7
T 9

NON‐COMBUSTIBLE ZONE

All other screen front installations must follow the clearances outlined hereKOZY HEAT Bayport 36 Direct Vent Fireplace - CombusƟble Material Allowed
2

Dimension BAY‐36
U 32
V 4‐1/2
W 3/4
X 8
Y 10
Z 12

Horizontal Termination Framing

KOZY HEAT Bayport 36 Direct Vent Fireplace - CombusƟble Material Allowed
3

Horizontal Venting Minimum Requirements

H = Horizontal
V = Vertical
Note specific gas type minimums

TOP VENTING LOG MODEL
Requirement BAY‐36‐L
(NG/LP) Vertical Min 90o Elbow
(NG/LP) Horizontal Min 6
(NG/LP) Horizontal Max 8 ft.
TOP VENTING GLASS MODEL
Requirement BAY‐36‐G
(NG/LP) Vertical Min 6 + 90o Elbow
(NG/LP) Horizontal Min 6
(NG/LP) Horizontal Max 8 ft.
REAR VENTING BOTH MODELS
Requirement BAY‐36‐L/G
(NG) Horizontal Min 6
(NG) Horizontal Max 48
(LP) Horizontal Min 6
(LP) Horizontal Max 12

Consult venting chart in the manual for all options above minimum requirements

Heat Shield Requirements

KOZY HEAT Bayport 36 Direct Vent Fireplace - CombusƟble Material Allowed
7The vertical vent heat shield must be installed for EVERY type of venting applica on.
The horizontal vent heat shield must be installed when incorporating minimum horizontal venting and is positioned according to the gas type.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals