KOZY HEAT Slayton 42S Direct Vent Fireplace Instructions
- June 10, 2024
- Kozy Heat
Table of Contents
Slayton 42S Direct Vent Fireplace
Please leave these reference guides at the installation location until the installation is finished. See owners manual for full installation and finishing instructions before making final decisions as information is subject to change.
Specifications
(all measurements are in inches)
- GAS LINE OPENING: LEFT/RIGHT SIDES
- ELECTRICAL ACCESS: RIGHT SIDE
Model| BTU| Height| Front Width| Back Width| Depth| Glass Viewing
Area
---|---|---|---|---|---|---
Actual| Framing| Actual| Framing| Actual| Framing| Actual| Framing
SLA‐42S| 42,000| 32‐9/16| 38‐3/8| 50| 55‐1/4| 50| 55‐1/4| 15‐13/16| 19| 42‐3/8
x 15‐11/16
Framing Opening
Finishing Clearances
NON‐COMBUSTIBLE ZONE
Dimension | SLA‐42S |
---|---|
N | 56‐3/4 |
O | 39‐7/8 |
Mantel Clearances
Dimension
P| Q| R| S| T
42| 14‐1/4| 17‐1/4| 29‐11/16| 62‐1/4
Finish Trim Kit
Important!
If you are finishing around the fireplace with le or stone make sure that you
install the Finishing Trim Kit at the framing stage.
The trim kit allows for your finishing board and your le/stone to finish up
against, creating a shadowbox for the face to sit inside.
Horizontal Termination Framing
Horizontal Venting Minimum Requirements
Heat Shield Requirements
The vertical vent heat shield
must be installed for EVERY type of venting applica on.
The horizontal vent heat shield must be installed when incorporating minimum
horizontal venting.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>