vetus BOWB385 BOW PRO ‘B’ Series Thrusters Instruction Manual
- June 9, 2024
- vetus
Table of Contents
- vetus BOWB385 BOW PRO ‘B’ Series Thrusters Instruction Manual
- Safety
- Introduction
- Installation recommendations
- Installation
- Final assembly
- Electrical installation
- Troubleshooting
- Technical data
- Principal dimensions
- Wiring diagrams
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
vetus BOWB385 BOW PRO ‘B’ Series Thrusters Instruction Manual
Safety
Warning indications
Where applicable, the following warning indications are used in this manual in
connection with safety:
Danger
Indicates that great potential danger exists that can lead to serious injury
or death.
WarninG
Indicates that a potential danger that can lead to injury exists.
Caution
Indicates that the usage procedures, actions etc. concerned can re-sult in
serious damage to or destruction of the engine. Some CAU-TION indications also
advise that a potential danger exists that can lead to serious injury or
death.
Note
Emphasizes important procedures, circumstances etc.
Symbols
Indicates that the relevant procedure must be carried out.
Indicates that a particular action is forbidden.
Share these safety instructions with all users.
General rules and laws concerning safety and accident prevention must always
be observed.
Introduction
This manual give guidelines for installing a VETUS bow and/or stern thruster
from the BOW PRO series, model ‘BOWB385’ and ‘BOWB420’ .
The bow or stern thruster system consists of the following basic components:
- Side thruster
- Tunnel
- Energy storage
- Energy supply
- Operation
Note
If necessary, consult the installation manuals for all components before
putting the complete system into operation.
For maintenance and warranty, please refer to the ‘Maintenance and Warranty
Manual’.
The quality of installation will determine how reliably the bow and/or stern
thruster performs. Almost all faults can be traced back to errors or
inaccuracies during installation. It is therefore imperative that the steps
given in the installation instructions are followed in full during the
installation process and checked afterward.
Alterations made to the bow thruster by the user will void any li-ability on
the part of the manufacturer for any damages that may result.
The actual thrust generated by the bow and/or stern thruster will vary from
vessel to vessel depending on the windage, the hull dis-placement, and the
shape of the underwater section.
The nominal thrust quoted can only be achieved under normal conditions:
-
During use ensure the correct battery voltage is available.
-
The installation is carried out in compliance with the recommendations given in this installation instruction, in particular with regard to:
-
Sufficiently large diameter of the battery cables so that voltage drop is reduced to a minimum.
-
The manner in which the tunnel has been connected to the hull.
-
Use of bars in the tunnel openings.
These bars should only be used where this is strictly necessary (if sailing regularly in severely polluted water.) -
The bars must have been fitted correctly.
-
Note
- The areas in which the electric motor(s) of the thruster(s) and batteries are positioned must be dry and well ventilated.
- Check for possible leaks immediately the boat is relaunched.
- The maximum continuous length of usage and the thrust as specified in the technical details are based on the recom-mended battery capacities and battery cables.
Installation recommendations
Positioning of the thruster tunnel
Several installation examples.
To achieve the optimum performance, position the thruster tunnel as far
forward as possible.
If, in addition to controlling the movement of the bow, the stern of the
vessel is required to move sideways, then a second thruster may be installed
at the stern.
For a planing boat the tunnel should, if possible, be so situated so that when
the vessel is planing it is above the water level thus causing no resistance.
Installation of two bow thrusters in tandem (for larger boats). In this case,
depending on weather conditions, one or both bow thrusters may be used.
Tip:
We do not advise fitting 2 bow thrusters into one tunnel; this does not result
in doubling the thrust!
When choosing the location for the thrust tunnel, take the following into
account for optimum performance:
-
* The distance A shown in the drawing must be at least 0.5 x D (where D is the tunnel diameter).
- The length of the tunnel (distance B) should be between 2 x D and 4 x D.
Positioning of the bow thruster in the thrust-tunnel
When determining the exact position of the bow thruster in the thrust tunnel, the tailpiece MUST NOT protrude the tunnel end.
The propeller should preferably be situated on the centerline of the vessel, but it must always be accessible from the outside.
-
* The electric motor can be installed in various positions.
- If the motor is set up horizontally or at an angle, support is absolutely essential.
- The electric motor must be positioned in such a way that it is al-ways well clear from the maximum bilge water level.
Connection of thrust tunnel to ships hull
Direct connection of the tunnel to the hull, without a fairing, pro-duces reasonable results.
- A The connection to the hull can be abrupt.
- B It is better to make the connection rounded with radius R of about 0.1 x D.
- C It is even better to use sloping sides C with dimensions 0.1 to 0.15 x D.
Connection of the thrust tunnel to the ship’s hull with a fairing results in lower hull-resistance during normal sailing.
- A The connection with a fairing can be abrupt.
- B It is better to make the connection with a fairing rounded with radius R of about 0.1 x D.
- C The best connection is with a fairing using sloping side C with dimensions 0.1 to 0.15 x D.
Tip: The manner, in which the thrust tunnel is connected to the hull, has a great influence on the actual performance of the bow thruster and to the drag the hull experiences when underway.
- Length ‘L’ of the fairing should be between 1 x D and 3 x D.
- This fairing should be embodied in the ship’s hull in such a way that the centerline of the fairing will correspond with the anticipated shape of the bow-wave.
If the connection of the thrust tunnel and the boat’s hull is to be made with
a sloped side, it should be executed in accord-ance with the drawing.
Make the sloped side (C) with a length of 0.1 to 0.15 x D and make sure that
the angle be-tween the tunnel and the sloped side will be identical to the
angle between the sloped side and the ship’s hull.
Grid bars in the tunnel openings
Although the thrust force will be adversely affected, grid bars may be placed
into the tunnel openings, for protection of the thruster.
In order to limit the negative effect of this on the thrust and on hull
resistance during normal operation as much as possible, the following must be
taken into account:
-
Do not fit more bars per opening than is indicated in the drawing.
-
The bars must have a rectangular cross-section.
-
Do not fit round bars.
-
The bars must overlap a certain amount.
-
The bars must be installed so they are perpendicular to the expected waveform.
Installation of the thrust tunnel
- Drill 2 holes in the hull, where the centerline of the thrust tunnel will be, in accordance with the diameter of the marking tool.
-
Pass the marking tool (home-made) through both pre-drilled holes and mark the outside diameter of the thrust-tunnel on the hull.
D [mm] (inches)Steel| GRP| Aluminium
420| 420| 420
(15 3/4”)| (15 3/4”)| (15 3/4”) - Dependent on the vessel’s construction material, cut out the holes by means of a jigsaw or an oxy-acetylene cutter.
- Install the thrust-tunnel.
Polyester thrust tunnel:
Resin: The resin used for the polyester thrust tunnel is Isophthalic
polyester resin (Norpol Pl 2857).
Pre-treatment: The outside of the tunnel must be roughened. Remove all of
the top surface down to the glass-fibre. Use a grinding disc for this.
Important: After the tunnel been sawn to length, treat the end of the
tube with resin. This will prevent water seeping in.
Laminating: Apply a coat of resin as the first coat. Lay on a glass-fibre
mat and impregnate with resin. Repeat this procedure until you have built up a
sufficient number of layers.
A polyester thrust tunnel should be finished as follows:
- Roughen the hardened resin/glass-fibre. Apply a top coat of resin.
- Treat the side of the tunnel which comes into contact with water with ‘epoxy paint’ or 2-component polyurethane paint.
- Then apply anti-fouling treatment if required.
Drilling the holes in the thrust-tunnel
- Mark the installation position of the bow thruster by means of the intermediate flange.
- Use the drill pattern supplied, to deter-mine the correct position of the holes to be drilled.
Important: The pattern of the holes must be positioned precisely on the
centerline of the tunnel.
Consult the template for the dimensions of the holes to be drilled. Drill the
holes through the thrust tunnel and take care that the holes are free of
burrs. Protection of the bow thruster against corrosion
To prevent corrosion problems, do not use copper based anti-fouling.
Cathodic protection is a ‘must’ for the protection of all metal parts under
water and the bow thruster is supplied
with a zinc anode for this purpose.
Corrosion of a steel or aluminium thrust tunnel can be reduced by ensuring
that the tail piece is completely insulated from the thrust-tunnel.
NOTE: The gaskets supplied are al-ready electrically insulated. However
the bolts and the shaft need to be fitted with insulation material, for
example nylon bushes.
Installation
Introduction
Note
The areas in which the electric motor(s) of the bow thruster(s) and the
batter-ies are positioned must be dry and well ventilated.
For overall dimensions see drawing, page 106.
The bow thruster is supplied in parts as shown.
Installation tailpiece and intermediate flange
-
Ensure that the plastic shim plate (1) has been positioned on the tail piece.
-
Place one packing (2) between the tail piece and the tunnel.
-
Apply a sealant (e.g. polyurethane or silicone) between the tail piece and packing, and between the packing and the tunnel wall.
-
Place the tail piece in the hole in the tunnel.
Any extra packings used should be ones capable of justifying the tail piece. e.g. Sikaflex®-292. -
Grease the hole of the intermediate flange and position this flange.
-
Check dimension ‘H’; it must be between 32 and 35 mm (between 1 1/4” and 1 3/8”).
-
If the dimension ‘H’ is less than 32 mm (1 1/4”), fit an additional gasket between the thrust tunnel and the intermediate flange.
-
Check again dimension ‘H’.
-
Now fit the intermediate flange permanently to the tail piece and grease the threads of the bolts with ‘outboard gear grease’ *) be-fore inserting and tightening them. ****
Note
Check for possible leaks immediately the ship returns to water.
Final assembly
- Check again dimension ‘H’.
- Make sure that the key (1) is properly positioned in the keyway of the shaft.
- Grease the shaft with ‘outboard gear grease’ and install the propeller (2) with the lock washer (3) and the hexagonal nut (4).
- Secure the nut by bending the tag of the washer.
- Fit the zinc anode (5) to the propeller shaft by means of the bolt (6)
The propeller should run a minimum of 1.5 mm (1/16”) free of the thrust tube wall, all round.
- Grease the input shaft with an installation compound, like ‘Molykote® G-n plus’s
- Fit the flexible coupling to the input shaft of the tail piece and secure the coupling with the locking screw.
- Grease the shaft of the electric motor with an installation com-pound, like ‘Molykote® G-n plus’.
- Grease the threads of the fastenings bolts with ‘outboard gear grease’ *) and install the electric motor to the intermediate flange.
- For a first check, turn the propeller by hand, it should turn easily, whilst being connected to the output spindle of the electric motor.
Electrical installation
Choice of battery
The total battery capacity must be sufficient for the size of the bow
thruster; see the table. See page 114 for the applicable battery capacity.
The minimum battery capacity is specified in the table; with a larger battery
capacity, the bow thruster will perform even better!
We recommend VETUS maintenance free marine batteries; these can be supplied in
the following sizes: 55 Ah, 70 Ah, 90 Ah, 108 Ah, 120 Ah, 143 Ah, 165 Ah, 200
Ah and 225 Ah.
We also recommend that each bow thruster is powered by its own separate
battery or batteries. This allows the battery bank to be placed as close as
possible to the bow thruster; the main power cables can then be short thus
preventing voltage losses caused by long cables.
Always use batteries whose type and capacity are compatible for their use.
Note
Be sure to only use ‘sealed’ batteries if the batteries are located in the
same compartment as the bow thruster.
VETUS ‘SMF’ and ‘AGM’ maintenance-free batteries are ideal for this
application. Batteries that are not ‘sealed’ may produce small amounts of
explosive gas during the charging cycle.
MCVB boosted charge function
Using the MCVB boosted charge function, the 48 Volt motor can be used in an
(existing) 24 V on-board power grid.
By connecting the 24 Volt battery bank to the MCVB boosted char-ge connection,
the 48 Volt, battery bank is charged. An additional charging facility is not
required. See page 113 for the connection diagram.
Note
As a standard, the MCVB boosted charge function is only suitable for Lead acid
batteries
Main power cables (battery cables)
The minimum diameter and battery capacity must be sufficient for the bow
thruster’s current draw in use. Consult the table on page 114 for the correct
values.
Note
The maximum operating time and the thrust, as specified by the technical
details in your bow thruster installation and operating manual, are based on
the recommended battery capacities and battery connection cables.
Main switch
The main switch must be fitted to the ‘positive cable’. The VETUS battery switch type BATSW600 is a suitable switch.
Fuses
Main power fuse 1,
A fuse must be included in the ‘positive cable’ for the main switch, as close
to the battery as possible. This fuse protects the on-board power cabling from
short circuits.
For all fuses we can supply a fuse holder, VETUS part no.: ZEHC100. See page
114 for the size of the fuse to be used.
Note
When replacing the fuse, the replacement must be of the same rating.
Connecting the main power cables and configuring the bow and/or stern
thruster
For connection diagrams,
Make sure that no other electrical parts come loose when connecting the
electric cables.
Check all electrical connections after 14 days. Electrical parts (such as
bolts and nuts) may come loose as a result of fluctuations in temperature.
Note
Be careful not to rotate the bolt and nut 1 while connecting the cables. To
prevent this happening, keep an open-ended spanner on nut 1 while screwing on
bolt 2, without rotating this spanner. The torque for nut 2 is 8 – 10 Nm (6 –
7 ft.lbf).
Apply cable terminals to the battery cables and connect the cables to the
motor controller.
Note
- The tightening torque of bolts in the motor regulator is a maximum of 10 Nm (7 ft-lbf).
- Make sure that the voltage stated on the motor type plate is identical to the boat’s power supply voltage.
- To allow the bow thruster or stern thruster to be distinguished on the CAN bus, these must be configured appropriately.
Bow thruster
The configuration as supplied is for application as a bow thruster.
Stern thruster
Configure a stern thruster by pressing the “PRESS FOR BOW OR STERN” button on
the underside of the cover.
Connecting CAN bus (control current) cables
See diagrams from page 107 if multiple panels have to be connected.
Note
The CAN bus power supply must always be connected to 12 Volt (≥10 V, ≤16 V).
Use the E-Drive MPE1KB key switch as power supply.
Caution
As required by international standards, all neutral (negative) conductors of
the DC system must be connected to one central point. This prevents not only
dangerous situations and corrosion problems, but also error messages in the
CAN bus system.
Troubleshooting
Please note that his is a general instruction. Specific actions may slightly
differ from one type to another.
Check, and if necessary correct, the following items if the system is not
working properly.
CAN bus system
-
Is the power supply switched on?
-
Is the CAN bus supply voltage correct? (=12VDC).
-
Does the control panel switch on?
-
Are both terminating resistors correctly positioned?
Note: The CAN bus power supply has an integrated terminating resistor. -
Did all connectors “click” when inserted in the connection point?
-
Are the correct CAN bus cables used and in good condition?
-
Are the correct CAN bus connectors used and in good condition?
-
Does the total length of the CAN bus network not exceed 40 meters?
-
Is each “node” connected to the power supply? Check by measuring the voltage on the 2 opposite pins in the connector on the node (pin 1=12 VDC positive, pin 3=12 VDC neutral).
Thruster installation
- Is the battery supply switched on?
- Is the supply voltage of the thruster correct? (measure the voltage at the motor controller terminals).
- Is the thruster correctly configured? (bow or stern thruster).
- Do both the positive and neutral cables have the correct diameter and length?
- Are both the positive and neutral wires connected to the correct terminals of the thruster motor controller?
- Are both the positive and neutral wires correctly routed? Incorrect routing may cause the wire(s) to press against the circuit board, which can lead to malfunctions.
- Is the pressed cable lug of the neutral cable isolated from the nearby motor winding connections? (spacer ring installed?) Note: Not applicable to bow thrusters with external cable connections.
- Are the cable glands of the power supply cables firmly tightened?
- Is the white connector for the thermal sensor of the motor cor-rectly connected to the circuit board under the top cover?
- Is the fuse (5 A) of the motor controller in place?
- Is the connector running from the top cover circuit board to the thruster motor controller fixed and are all connector pins correctly connected? (latch in place?)
Technical data
Principal dimensions
Wiring diagrams
Note
The CAN bus is a chain to which the bow thruster and the panels are connected.
At one end of the chain, the power supply (5) must be connected and the
terminator (8) must be connected at the other end!
-
One (1) thruster (bow or stern), One (1) helm station
-
Thrusters (bow AND stern), One (1) (8.3) or two (2) (8.4) helm stations. The diagram can be extended to up to four (4) helm stations.
-
Connection of batteries and charging circuit with a 48 volt on-board supply
Fokkerstraat 571 – 3125 BD Schiedam – Holland
Tel.: +31 (0)88 4884700 –
sales@vetus.com –
www.vetus.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>