RAB DLPLATE-WFR4-NB-CL Wafer Mounting Plate With Collar Instruction Manual

September 20, 2024
RAB

DLPLATE-WFR4-NB-CL Wafer Mounting Plate With Collar

Specifications:

  • Model: DLPLATE/WFR4/NB/CL
  • Model: DLPLATE/WFR6/NB/CL
  • Installation: Wafer Mounting Plate With Collar
  • Location: Cranbury, New Jersey, USA
  • Warranty: Subject to terms and conditions found at
    rablighting.com/warranty

Product Usage Instructions:

T-Grid Ceiling Installation:

  1. Fold the two ends of the bracket slide inward by 90 degrees.
    (Refer to fig.1)

  2. Place the plate on top of the T-Grid tile where the fixture
    will be installed. (Refer to fig.2)

Figure 1: Bracket slide inward by 90
degreesFigure 2: Plate placement on T-Grid tile

Joist Ceiling Installation:

  1. Extend the handle bar to the required length. (Refer to
    fig.3)

  2. Nail the handle bar to the ceiling’s joists. (Refer to
    fig.4)

Figure 3: Handle bar extensionFigure 4: Nail handle bar to joists

For more information and technical assistance, visit our website
at rablighting.com or contact our experts at 888 722-1000 or via
email at sales@rablighting.com.

FAQ:

Q: Where can I find RAB’s warranty
information?

A: RAB’s warranty details can be found at
rablighting.com/warranty.

Q: How can I request a lighting layout?

A: Lighting layouts can be requested online
through our website or by contacting our customer support team.

INSTRUCTIONS
Wafer Mounting Plate With Collar Installation
and end users to save energy. We’d love to hear your comments. Please call the Marketing Department at 888-RAB-1000 or email: marketing@rablighting.com

DLPLATE/WFR4/NB/CL

DLPLATE/WFR6/NB/CL

IMPORTANT
WARNINGS: · Read all the product labels and instructions before installing fixture. · Wear safety gloves and other appropriate safety equipment.

INSTALLATION
T-Grid Ceiling Installation 1. Fold the two ends of the bracket slide inward by 90 degrees. (fig.1) 2. Place the plate on top of the T-Grid tile where the fixture
will be installed. (fig.2)
Fig.1

Joist Ceiling Installation 1. Extend the handle bar to required length. (fig.3) 2. Nail the handle bar to the ceiling’s joists. (fig.4)
Fig.3

Fig.2

Fig.4

© 2024 RAB LIGHTING Inc.
Cranbury, New Jersey 08512 USA
DLPLATE-WFRx-NB-CL-IN-0624

Easy Answers

rablighting.com Visit our website for product info

Tech Help Line Call our experts: 888 722-1000

e-mail Answered promptly – sales@rablighting.com

RAB WARRANTY: RAB’s warranty is subject to all terms and conditions found at rablighting.com/warranty.

Free Lighting Layouts Answered online or by request

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals