IMPORTANT

READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
RAB fixtures must be wired in accordance with the National Electrical Code and all applicable local codes. Proper grounding is required for safety. THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE BY A PERSON FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED.
WARNING: Make certain power is OFF before installing or maintaining fixture. No user serviceable parts inside.

SAFETY INSTRUCTIONS

WARNING: Risk of fire or electric shock. Suitable for Damp locations.
WARNING: Suitable for 9/16” or 15/16” Flat Tee Grid in both Insulated Ceilings and Non-Insulated Ceilings. Access above ceiling required.
WARNING: Do not handle energized fixture when hands are wet, when standing on wet or damp surfaces, or in water.
WARNING: Vapor barrier must be suitable for 90° C.
WARNING: Fixture to be independently supported to building structure.

RECESSED CEILING MOUNTING

The fixture is suitable only for INDOOR RECESSED CEILING application. Above ceiling access required.

To mount in an insulated or non-insulated ceiling – 9/16” or 15/16” exposed Flat Tee Grid Ceiling follow the steps below.

  1. Firmly bend the pre-installed Grid Clips (up and out as shown in Fig. 1).

  2. Rotate and slide the Fixture as required to fit through the Tee-Grid Bar and place it as indicated by the directional arrow as shown in Fig. 2. Secure the Fixture to the Tee-Grid Bar.

  3. Support wires are required by Installation Codes. Support the Fixture to the building structure by Support Wires (supplied by others) through the Grid Clip Hole as shown in Fig. 3.

  4. Make sure that the orientation of the Splice Box and Access Plate faces an accessible tile to make electrical splices.

  5. Loosen Access Plate Screw and remove the Access Plate. Knock out appropriate Conduit Knockouts on the Access Plate to route input conduit. Use appropriate conduit connectors as required by code (Fig. 4).
    RAB SMKEZPAN1X4 Ezpan 1X4 Surface Mounting Kit - Figure
4

  6. Connect wires as shown in wiring diagram. Push all wires back into the Splice Box. Use appropriate UL approved wire connectors as required by code to complete wiring. Be careful not to pinch wires.
    WARNING: To prevent wiring damage or abrasion, do not expose wiring to edges of sheet metal or other sharp objects.

  7. Replace Access Plate and tighten Access Plate Screw.

0-10V DIMMABLE WIRING

Universal voltage driver permits operation at 120V through 277V, 50 or 60 Hz. For 0-10V dimming, follow the wiring directions as shown below (Fig. 5).

Do not use any supply voltage other than 120V-277V.

  1. Connect the black fixture lead to the LINE supply lead.
  2. Connect the white fixture lead to the COMMON supply lead.
  3. Connect the GROUND wire from fixture to supply GROUND.
  4. Connect the purple fixture lead to the (V+) DIM lead.
  5. Connect the pink (or gray) fixture lead to the (V-) DIM lead.

NOTE: Do not connect DIM V+ (purple)/ DIM V- (pink/gray) to line voltage or supply ground.

CLEANING

CAUTION: Be sure fixture temperature is cool enough to touch. Do not clean or maintain while fixture is energized.

  1. Clean polystyrene lens & fixture with non-abrasive cleaning solution.
  2. Do not open fixture to clean the LEDs. Do not touch the LEDs.

TROUBLESHOOTING

  1. Check the line voltage at fixture. Refer to wiring directions.
  2. Is the fixture grounded properly?

BATTERY BACKUP MODELS

WIRING

CAUTION: THIS IS A BATTERY BACKUP FIXTURE for standby lighting. Voltage could be present in Battery. To prevent high voltage from being present on output leads, inverter connector must be open. Do not join inverter connector until installation is complete and AC power is supplied to the emergency ballast.

Note : Make sure that the necessary branch circuit wiring is available. An unswitched AC source of power is required. The emergency ballast must be fed from the same branch circuit as the AC ballast (Fig. 6).

Do not use any supply voltage other than 120V-277V.

  1. Connect the UNSWITCHED black fixture lead to the HOT supply lead.
  2. If using an un switched circuit, connect both black leads together.
  3. If using a switched circuit, connect SWITCHED black lead to the switch.
  4. Connect the COMMON fixture lead to the COMMON supply lead.
  5. For 0-10V Dimming, connect DIM (+) purple lead and DIM (-) pink (or gray) lead to 0-10V dimmer connections on the driver.
  6. Connect the GROUND wire from fixture to supply ground.
  7. All unused leads must be capped and insulated.
  8. After installation is complete, supply AC power to the emergency ballast and join the inverter connector.
  9. At this point, power should be connected to both the AC ballast and the emergency ballast, the Charging Indicator Light should illuminate indicating the battery is charging.
  10. A short duration discharge test may be conducted after the emergency ballast has been charging for one hour. Charge for 24 hours before conducting a 90-minute discharge test. Refer to OPERATION.

RAB SMKEZPAN1X4 Ezpan 1X4 Surface Mounting Kit - Figure
6

Note: These instructions do not cover all details or variations in equipment nor do they provide for every possible situation during installation, operation or maintenance.

OPERATION

  1. When AC power is applied, the charging indicator light is illuminated, indicating that the battery is being charged.
  2. When power fails, the emergency driver automatically switches to emergency power (internal battery), operating at reduced output. The emergency driver supplies 12W of power in emergency mode for a minimum of 90 minutes.
  3. When AC power is restored, the emergency driver automatically returns to charging mode.

MAINTENANCE

Although no routine maintenance is required to keep the emergency driver functional, it should be checked periodically to ensure that it is working. The following schedule is recommended:

  1. Visually inspect the charging indicator light monthly. It should be illuminated.
  2. Test the emergency operation of the fixture at 30-day intervals for a minimum of 30 seconds.
  3. Conduct a 90-minute discharge test once a year. Fixture would provide reduced illumination for a minimum of 90 minutes.

Easy Answers

rablighting.com
Visit our website for product info

Tech Help Line
Call our experts: 888 722-1000

e-mail
Answered promptly – sales@rablighting.com

Free Lighting Layouts
© 2022 RAB LIGHTING Inc. Answered online or by request

RAB logo

© 2022 RAB LIGHTING Inc
EZPAN 1X4, 2X2, 2X4 – 0522
73534-RAB

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals