RAB LFLED4NLVA LED Floodlight Instructions
- October 30, 2023
- RAB
Table of Contents
RAB LFLED4NLVA LED Floodlight
RAB Lighting is committed to creating high-quality, affordable, well-designed and energy-efficient LED lighting and controls that make it easy for electricians to install and end users to save energy. We’d love to hear your comments. Please call the Marketing Department at 888-RAB-1000 or email: marketing@rablighting.com
IMPORTANT
READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN THESE INSTRUCTIONS FOR
FUTURE REFERENCE.
RAB fixtures must be wired in accordance with the National Electrical Code and
all applicable local codes. Proper grounding is required for safety. THIS
PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE
BY A PERSON FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND
THE HAZARDS INVOLVED. WARNING: Make certain power is OFF before installing or
maintaining fixture. No user serviceable parts inside.
CAUTION: For proper weatherproof function all gaskets must be seated properly
and all screws inserted and tightened firmly. Apply weatherproof silicone
sealant around the edge of the wall cover plate or junction box. This is
especially important with an uneven surface. Suitable for wet locations.
Suitable for mounting within 1.2m (4ft) of the ground.
WALL MOUNTING
Mount to a weatherproof junction box and cover plate (not provided) as shown in Fig. 1. To ensure weatherproof seal, apply weatherproof silicone sealant around the edge of the wall cover plate or surface box. This is especially important with an uneven wall surface.
- Seal arm thread using Teflon® tape or silicone sealant.
- Thread fixture into Cover Plate (sold separately).
- Connect wires as shown in the wiring diagram (Fig. 3).
- Attach Cover Plate to Junction Box (sold separately).
- Aim floodlight in the direction desired and tighten Locknut and Arm Screw.
GROUND MOUNTING
Mount to a Mighty Post (RAB Cat# MP19) as shown in Fig. 2.
- Thread fixture into Mighty Post Cap.
- Connect wires as shown in the wiring diagram (Fig. 3) and place inside the Mighty Post.
- Place Mighty Post Cap on the Mighty Post.
- Aim floodlight in the direction desired and tighten Locknut and Arm Screw.
WIRING
The driver permits operation at 12 VAC ONLY. Wire LFLED4LV using approved
wiring devices for SPT-1 cord.
ACCESSORIES
Reflector door lens kit can be ordered separately:
LNSLFLED8 15° spot reflector, door, lens kit for LFLED4LV
LSLFLED8 20° spot reflector, door, lens kit for LFLED4LV
CLEANING & MAINTENANCE
CAUTION : Be sure fixture temperature is cool enough to touch. Do not clean or maintain while fixture is energized.
- Clean glass lens with non-abrasive glass cleaning solution.
- Do not open the fixture to clean the LED. Do not touch the LED.
TROUBLESHOOTING
- Check that the line voltage at the fixture is correct. Refer to wiring directions.
- Keep leaves and debris out of hood.
Note: These instructions do not cover all details or variations in equipment nor do they provide for every possible situation during installation, operation or maintenance.
Easy Answers
rablighting.com
Visit our website for product info
Tech Help Line
Call our experts: 888 722-1000
e-mail
Answered promptly – sales@rablighting.com
Free Lighting Layouts
Answered online or by request
RAB WARRANTY : RAB’s warranty is subject to all terms and conditions
found at rablighting.com/warranty.
73105-RAB
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>