VISTA 1470 Commercial Series Bollard Installation Guide
- September 18, 2024
- VISTA
Table of Contents
1470 Commercial Series Bollard
“`html
Product Specifications:
-
Model: 1470 Commercial Series Bollard
-
Installation: Above grade only
-
Electrical Code Compliance: National Electrical Code (NEC) and
local codes -
Listing: UL Listed
Product Usage Instructions:
Bollard Installation:
-
Ensure power is off at the supply source.
-
Remove anchor bolt top fasteners and bollard access door.
-
Place a die spring and bushing over each J-bolt.
-
Select bollard orientation relative to J-bolts.
-
Route supply wires through the center access hole of the base
plate. -
Place bollard upright onto anchor bolts, fitting bushings into
radial slot features in the base. Rotate the bollard to aim the
fixture properly. -
Secure the fixture to anchor bolts using supplied
fasteners. -
Tighten anchor bolt nuts until bollard is level.
-
Verify supply voltage matches fixture voltage. Make electrical
connections inside bollard housing following NEC guidelines. -
Re-install bollard access door securely.
-
Re-energize electrical service and check for proper
operation.
J-Bolt Anchor Installation:
-
Orient J-bolt anchor assembly for desired access door
location. -
Ensure top of J-bolt anchor assembly bracket is flush and level
with final grade. -
Pour concrete pad to top surface of the J-bolt anchor assembly
bracket, ensuring it is smooth and level.
FAQ:
Q: Can I install the bollard below grade?
A: No, the luminaire is UL listed for above grade installation
only.
Q: How often should maintenance be performed?
A: A regular scheduled maintenance program is recommended to
assure proper operation and efficiency. Check all access doors,
seals, and anchor bolts regularly.
“`
INSTALLATION INSTRUCTIONS
1470
COMMERCIAL SERIES BOLLARD
IMPORTANT NOTE: Luminaire must be installed and grounded in accordance with
the National Electrical Code (NEC) and local codes. Luminaire is UL listed for
above grade installation only. Always use UL recognized wire connectors for
connections.
MAINTENANCE: To assure proper operation and efficiency, all access doors,
seals and anchor bolts must be properly secured. All splice connections must
be positioned such that flooding does not immerse connections. A regular
scheduled maintenance program is recommended.
SAFETY WARNING: Luminaire can become hot. Take care when locating luminaire.
NOTE: Save these instructions for future reference
BOLLARD INSTALLATION
IMPORTANT NOTE: Mount J-Bolt Anchor Assembly as specified on page two of this
installation instruction.
1. Verify that the power is off at the supply source. 2. Remove the anchor
bolt top fasteners and bollard access door before installing
the bollard. 3. Place a die spring and bushing over each of the projecting
J-bolts. 4. Select the orientation of bollard relative to J-bolts. 5. Route
the supply wires through the center access hole of the base plate. Place
the bollard upright onto the anchor bolts, fitting the bushings into the
radial slot features in the bollard base. Rotate the bollard about the J-bolts
to properly aim the fixture. 6. Secure the fixture to anchor bolts using the
supplied anchor bolt top fasteners. 7. Tighten each of the three (3) anchor
bolt nuts until the bollard is properly leveled. 8. Verify that supply voltage
matches fixture voltage. Make electrical connections to the fixture inside the
bollard housing.
NOTE: All electrical splices are to be made as prescribed by the National
Electrical Code (NEC) or other relevent codes. Attach ground wire to an
approved ground source.
9. Re-install the bollard access door securely with supplied fasteners. 10.
Re-energize electrical service and check for proper operation.
Access Door
Bollard
Anchor Fasteners
Bushing Die Spring Electrical Conductors Conduit J-Bolt Anchors Concrete Pour
Bollard Base Plate
Access Door
Finished Grade
Electrical Conductors Anchor Fasteners (3)
J-Bolt Anchor Bracket J-Bolt Anchors
Die Springs / Bushings (3)
Conduit
Concrete Pour
30° Base Rotational Adjustment
www.VistaPro.com · email@vistapro.com · Fax: (888) 670-VISTA (8478) 1625
Surveyor Avenue · Simi Valley, CA 93063 ·
805-527-0987 · (800) 766-VISTA (8478)
Vista Professional Outdoor Lighting reserves the right to modify the design
and/or construction of fixtures shown in this document without further
notification.
Page 1 of 2 REV 08.15.24
INSTALLATION INSTRUCTIONS
1470
COMMERCIAL SERIES BOLLARD
J-BOLT ANCHOR INSTALLATION
1. Install supplied J-bolt anchor (galvanized J-bolt ½-13 thread, 12 inches
long) assembly over electrical supply conduit and into concrete. Position the
electrical supply conduit such that it passes through the center of the
bracket of the J-bolt anchor assembly.
NOTE: Electrical supply conduit ends should be no higher than 3″ (76mm) above
grade with supply wires loop at a recommended 12″ (305mm) minimum length. (See
illustration) Maximum conduit number and size: Two (2) 3/4″ (25mm) conduits or
three (3) 1/2″ (20mm) conduits.
2. Orient the J-bolt anchor assembly to ensure that the access door of the
1470 Bollard is in the desired location when the bollard is installed. (See
attached illustration).
NOTE: For proper bollard installation, the top of the J-bolt anchor assembly
bracket must be flush and level with final grade.
3. Pour the concrete pad to the top surface of the J-bolt anchor assembly
bracket. For best results, ensure that the top surface of concrete is smooth
and level.
NOTE: For proper bollard installation, the anchor bolt top fasteners must be
above grade and removable. These will be used later to secure the 1470 Bollard
to the J-bolt assembly. The concrete pour around the J-bolt assembly should be
a minimum of 12″ across the top in any direction and a minimum of 18″ deep.
4. Allow concrete pad to cure securing J-bolt anchor assembly into the pad
before installing 1470 Bollard fixture.
NOTE: Protect J-bolt and conduit ends from damage prior to installation of
1470 Bollard fixture. See page one of installation instructions for complete
assembly.
Supply Wire Loop J-Bolt Anchor Bracket
J-Bolt Anchor Bolt Fasteners (3)
Concrete Pour
Recommended
Maximum 3″ Conduit Height
J-Bolt Anchors
Conduit
Recommended
Minimum Concrete
18″
Depth
12″ J-Bolt Anchors
J-BOLT ORIENTATION FOR BOLLARD
All illustrations are viewed from the top, with the orientation of the J-bolt anchor assembly projecting upward. Front of the bollard is defined as the side opposite of the access door.
PATHWAY
PATHWAY
PATHWAY
ACCESS DOOR
PATHWAY
ACCESS DOOR
ACCESS DOOR
www.VistaPro.com · email@vistapro.com · Fax: (888) 670-VISTA (8478) 1625
Surveyor Avenue · Simi Valley, CA 93063 ·
805-527-0987 · (800) 766-VISTA (8478)
Vista Professional Outdoor Lighting reserves the right to modify the design
and/or construction of fixtures shown in this document without further
notification.