VISTA PROFESSIONAL OUTDOOR LIGHTING 1500 Series Flush Tray Kit Instruction Manual
- June 1, 2024
- VISTA PROFESSIONAL OUTDOOR LIGHTING
Table of Contents
- VISTA PROFESSIONAL OUTDOOR LIGHTING 1500 Series Flush Tray Kit
- GLASS BORDER 1501, 1503, 1505 SERIES STEP LIGHTS
- LUMINAIRE INSTALLATION IN STUD WALL CONSTRUCTION
- LUMINAIRE INSTALLATION IN POURED CONCRETE CONSTRUCTION
- OPTIC PACKAGE AND APERTURE INSTALLATION
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
VISTA PROFESSIONAL OUTDOOR LIGHTING 1500 Series Flush Tray Kit
GLASS BORDER 1501, 1503, 1505 SERIES STEP LIGHTS
IMPORTANT NOTE:
- Luminaire must be installed and grounded in accordance with the National Electrical Code (NEC) and local codes.
- All conduit entries must be sealed from moisture. Use appropriate sealing material on conduit fittings and conduit closure plugs.
- Rough-In Section (RIS) housing with Flush Tray MUST be installed so that the front face of the Flush Tray is flush or slightly forward with the finished wall surface.
- Luminaire is IC and Non-IC rated.
- Luminaire is wet location listed and suitable for mounting within 3ft of ground.
- Suitable for all types of construction including poured concrete construction and in stud wall applications – MINIMUM 2”x 6” WALL DEPTH REQUIRED – NOT SUITABLE FOR 2”x 4” WALLS
- Rough In Section (RIS) housing provided with (3) 1/2” NPT closure plugs and (4) knockout membranes.
- Suitable for through wiring: max. of (4) No. 12 AWG conductors (plus ground) rated for 90°C.
MAINTENANCE : To assure proper operation and efficiency, lens must be
kept clean and free of dirt, dust, leaves, trash and mineral deposits from
water. A regular schedule maintenance program is recommended.
NOTE : Save these instructions for future reference.
LUMINAIRE INSTALLATION IN STUD WALL CONSTRUCTION
IMPORTANT NOTE : Internal supports, temporary cover plate, MDF Flush Tray plate, and vinyl label must remain in place during RIS housing installation.
- Position the housing mounting brackets to accommodate either 1/2” thick drywall or 5/8” thick drywall (fig. 1).
- Secure the (2) RIS housing mounting brackets with (4) 8-32 Hex Nuts (provided) (fig. 1).
- Secure the RIS housing mounting brackets using fasteners (by others) to support studs (fig.2).
- Connect conduit to RIS housing (fig.2).
- Remove and retain vinyl label, temporary cover plate, MDF Flush Tray plate, and internal support. Pull wires for electrical connections to be made later.
- To protect RIS housing during construction, reinstall internal support, MDF Flush Tray plate, temporary cover plate and vinyl label.
LUMINAIRE INSTALLATION IN POURED CONCRETE CONSTRUCTION
IMPORTANT NOTE: Internal supports, temporary cover plate, MDF Flush Tray plate, and vinyl label must remain in place during pouring and curing of concrete.
- Install (4) threaded 8-32 rods (supplied) into RIS housing by piercing through vinyl label and through the MDF Flush Tray plate in specified location. Hand tighten until secure.
- Attach RIS housing to pour form using (4) wing nuts provided so the front face of the Flush Tray will be flush with the finished surface (fig. 3).
- Connect conduit to RIS housing (fig. 3).
- Pour concrete. NOTE: DO NOT PUMP OR DROP CONCRETE DIRECTLY ON TOP OF THE RIS HOUSING (FIG.4).
- Remove the wing nuts from threaded rods before removing pour form. FAILURE TO REMOVE WING NUTS AND RODS PRIOR TO FORM REMOVAL CAN RESULT IN RIS DAMAGE AND WILL VOID WARRANTY.
- Remove and retain vinyl label, temporary cover plate, MDF Flush Tray plate, and internal supports. Pull wires for electrical connections to be made later.
- To protect RIS housing during construction, reinstall internal supports, temporary cover plate, MDF Flush Tray plate and vinyl label.
OPTIC PACKAGE AND APERTURE INSTALLATION
- To prevent electrical shock, turn main power off at circuit breaker.
- Before continuing, remove vinyl label, temporary cover plate, and internal supports.
- Using wire nuts (provided), make wire connections of the Performance optic Module (PoP) to the supply conductors.
- Install Performance optics Module (PoP) to RIS housing using (4) 6-32 screws (provided), making sure gasket is seated properly. Orient PoP correctly to ensure proper light direction.
- Turn on main power at circuit breaker and adjust hot aiming using 1/16” Allen wrench (provided).
- Install Glass Border lens, making sure the gasket is seated properly. Tighten (2) 8-32 screws using 1/8” Allen wrench (provided).
www.VistaPro.com ·
email@vistapro.com · Fax: (888) 670-VISTA (8478)
1625 Surveyor Avenue · Simi Valley, CA 93063 ·
805-527-0987 · (800) 766-VISTA (8478)
Vista Professional Outdoor Lighting reserves the right to modify the design
and/or construction of the fixture shown without further notification.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>