VISTA STM-S Wall Mount Instruction Manual
- June 1, 2024
- VISTA
Table of Contents
VISTA STM-S Wall Mount
Specifications
- Product Model: STM-S Wall Mount
- Series: Commercial Series
- Mounting Type: Stanchion Mount
- Mounting Compatibility: Structural Surface over Recessed 4-0 Box or Conduit Stub Out
- Bolt Size : 3/8 Red Head Style Bolts (by others)
- Design and Construction: Subject to modification by Vista Professional Outdoor Lighting
Product Usage Instructions
Installation Steps
- Ensure electrical supply is off at the circuit breaker before starting installation.
- Install 3/8 red head style bolts (by others) on 6 centers over 4-0 box or conduit stub out.
- Mount the stanchion onto the wall over the red head style bolts.
- Tighten stanchion washers and nuts onto the base securely.
- Apply sealant (by others) around the base of the stanchion.
- Install nut covers into the stanchion base.
- Thread fixture stem through the stanchion mount cap.
- Make electrical connections from the supply service to the fixture.
- Secure the cap onto the fixture.
Mounting Details
- Bolt Mount Pattern: Thru Holes Suitable For 3/8 Bolts (Bolts By Others)
- Wall: 3/8 Red Head Mounting Bolts (By Others)
- Stanchion Nuts: Apply Sealant (By Others) Around Base Of Stanchion
- Bolts Position: To Be Mounted 5/8-7/8 From Wall Surface
FAQ
- Q: Can I use my own bolts for installation?
- A: It is recommended to use 3/8 red head style bolts provided by others for secure installation as per product specifications.
- Q: What type of sealant should be used?
- A: Use sealant recommended by professionals for outdoor use to ensure proper weatherproofing of the stanchion mount.
WARNING: STM-D Stanchion Mount Single must be installed and grounded in
accordance with the National Electrical Code (NEC) and local codes. Failure to
do so will void the warranty and may result in serious injury and or damage to
the luminaire Stanchion Mount.
NOTE: Always use UL-listed wire connectors for connections (by others).
NOTE: Save these instructions for future reference.
Installation Instructions
LUMINAIRE FITTING
- THE STANCHION MOUNT IS SUITABLE FOR WET LOCATIONS
STANCHION MOUNTING TO STRUCTURAL SURFACE OVER RECESSED 4-0 BOX ( by others) OR CONDUIT STUB OUT
- Make sure electrical supply is off at circuit breaker before starting stanchion mount installation.
- Install 3/8” read head style bolts (by others) on 6” centers over 4-0 box or conduit stub out. BOLTS TO PROTRUDE 5/8” – 7/8” FROM WALL SURFACE
- Pull electrical supply wiring through stanchion to top opening of stanchion.
- Apply appropriate sealant along the base of the stanchion mount, secure stanchion onto wall over red head style bolts.
- Tighten fully stanchion washers and nuts onto base.
- Apply sealant (by others) onto stanchion nut covers. Install nut covers into stanchion base.
- Thread fixture stem through stanchion mount cap.
- Make electrical connections from supply service to fixture. Secure cap onto stanchion using two ¼”-20 screws.
- Aim fixture and secure. Energize fixture to test for proper operation.
Contact
- www.VistaPro.com
- email@vistapro.com
- Fax: (888) 670-VISTA (8478)
- 1625 Surveyor Avenue · Simi Valley, CA 93063
- 805-527-0987
- (800) 766-VISTA (8478)
Vista Professional Outdoor Lighting reserves the right to modify the design and/or construction of the fixture shown without further notification.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>