BELL Lighting 09126 Spectrum 2W Emergency Down Light Installation Guide
- September 3, 2024
- BELL lighting
Table of Contents
09126 Spectrum 2W Emergency Down Light
“`html
Product Information:
Specifications:
- Model: LED IP20
- Material: LiFePO4
- Installation: Surface mounted or recess mounted
- Dimensions: 97.8mm x 97.8mm
- Technical Helpline: +44 (0)1924 893380
- Website: www.belllighting.co.uk
- Manufacturer: British Electric Lamps Ltd
- Address: BELL House, Foxbridge Way, Normanton Industrial
Estate, Normanton, West Yorkshire. WF6 1TN
Product Usage Instructions:
Mounting Options:
Surface mounted product installation:
-
Drill out installation holes according to dimensions shown in
the diagram. -
Using wall plugs and screws, affix the surface mounted fittings
to the wall/ceiling. -
Wire up the luminaire, insert it into the surface mounted
accessory in the direction indicated by the arrow to complete the
installation.
Recess mounted product installation:
-
Aperture for recessed mounting: 75-90mm
-
Wire up the luminaire, push the spring on each side upward as
shown in the diagram. -
Insert luminaire into the aperture to complete the
installation.
Changing the Lens:
- Turn the bezel anticlockwise to remove the bezel.
- Carefully pry out the lens.
- Replace with alternative lens.
- Replace the bezel by rotating it clockwise to affix into
place.
Changing the Battery:
-
Push the side cover upwards and remove it in the direction
indicated by the arrow. -
Remove the old battery and replace, ensuring correct polarity
is maintained. -
Replace the side cover.
Frequently Asked Questions (FAQ):
Q: What should I do if a mains supply failure occurs during a
functional test?
A: The test shall be postponed, and the system
will enter emergency operation. Following restoration of the mains
supply, a postponed functional test shall re-commence automatically
as soon as conditions permit.
Q: When will a duration test start?
A: A duration test will only be started once
the battery is fully charged. If a mains supply failure occurs
during a duration test, the test shall be postponed, and the system
shall enter emergency operation. Following restoration of the mains
supply, a postponed duration test shall re-commence automatically
once the battery is fully recharged. The indicator will be slow
flashing Green for 5 days once the duration test has been carried
out successfully.
“`
LED IP20
Important Information
LiFePO4
We recommend that luminaires are installed by a qualified electrician ensuring the installation complies with current IEE wiring regulations BS7671:2018 & local building control.
· All tests should be carried out in accordance to EN 50172:2004.
· BELL will not accept responsibility for any claims arising from poor installation.
· The light source of this luminaire is not replaceable, when the light source reaches end of life, the whole luminaire must be replaced.
Important User Advice
· The ambient room temperature should not exceed 35°C.
· Ensure that there is adequate free air ventilation around the fitting.
· Always switch off mains supply before installing.
Specification 1. Supply Voltage: 220-240VAC 50/60Hz 2. Ambient Room Temperature: 0 to 35°C 3. Insulation Class: II 4. Ingress Protection: IP20 5. Battery Recharge Time: 24 hours 6. Wattage: 1.2W 7. Emergency duration: more than 3 hours 8. Lumens: 150lm (Open), 110lm (Corridor) 9. Battery installed: LiFePO4 3.2V 1500mAh 10. Deep Discharge Protection DDP 11. Non-maintained Operation
unit:mm
97.8
97.8
unit:mm
Installation Instructions: 09126
Read these instructions before97.8installation and retain for future reference
97.8
This equipment should be installed by a competent eLElDecItP2r0ician
Wiring Diagram Connections
LiFePO4
Connections
97.8
97.8
Date
Revision
1.3.2024
1
97.8
97.8
Selecting the test mode: Step 1: Switch the product mode using the switch
shown by the arrow. Step 2: Push switch to the left to switch the product mode
to manual test mode.
Mounting Options
Step 3: Push switch to the right to switch the product mode to self-test mode
Mounting Options
Changing the lens: Step 1: Turn the bezel anticlockwise to remove the bezel.
Step 2: Carefully pry out the lens. Step 3: Replace with alternative lens.
Step 4: Replace the bezel by rotating it clockwise to affix into place.
Changing the battery: Step 1: Push the side cover upwards and remove it in the
direction indicated by the arrow. Step 2: Remove the old battery and replace,
ensuring correct polarity is maintained. Step 3: Replace the side cover.
Surface mounted product installation:
Step 1: Drill out installation holes according to dimensions shown in the diagram.
50.8
Step 2: Using wall plugs and screws, affix the surface mounted fittings to the wall/ceiling.
Step 3: Wire up the luminaire, insert it into the surface mounted accessory in the direction indicated by the arrow to complete the installation..
Recess mounted product installation: Step 1: Aperture for recessed mounting: 75-90mm Step 2: Wire up the luminaire, push the spring on each side upward as shown in the diagram. Step 3: Insert luminaire into the aperture to complete the installation
50.8
75.00
75.00
Technical Helpline +44 (0)1924 893380
www.belllighting.co.uk
British Electric Lamps Ltd BELL House, Foxbridge Way, Normanton Industrial
Estate
Normanton, West Yorkshire. WF6 1TN
T: +44 (0)1924 893380 F: +44 (0)1924 894320 E: sales@belllighting.co.uk
www.belllighting.co.uk
Installation Instructions: 09126
Read these instructions before installation and retain for future reference
This equipment should be installed by a competent electrician
Date 1.3.2024
Revision 1
Functionality of the test switch
· A short press (1s) on the button starts a function test lasting 5 seconds.
· Holding down the button (>10s) resets the timer (System reset)
Functional test Self-test Mode
· The functional test lasts for 5 seconds and occurs every 7 days, to check
the functionality of the emergency unit, the batteries and LED module.
Please note: If a mains supply failure occurs while a functional test is in
progress, the test shall be postponed, and the system will enter emergency
operation. Following restoration of the mains supply, a postponed functional
test shall re-commence automatically as soon as conditions permit.
Duration test Self-test Mode
· 24 hours after installation, a 3-hour duration test is performed.
· 3 hour duration tests are performed every 180 – 182 days to check the
battery capacity.
Please note: A duration test will only be started once the battery is fully
charged and if a mains supply failure occurs while a duration test is in
progress, the test shall be postponed, and the system shall enter emergency
operation. Following restoration of the mains supply, a postponed duration
test shall re-commence automatically once the battery is fully re-charged.
The indicator will be slow flashing Green for 5 days once the duration test
has been carried out successfully.
Indicator LED System status is by the bi-colour indicator LED.
LED Indication Permanent Green Fast flashing Green (0 .25s on 0 .25s off) Slow flashing Green (1s on 1s off) Permanent Red Fast flashing Red (0 .25s on 0 .25s off) Slow flashing Red (1s on 1s off) Green and Red off
Status Standby, System OK Function test underway Duration test underway Lamp failure Battery capacity failure Battery fault Battery Operation
Description Mains operation, battery is charged Function test underway Duration test underway Open Circuit or Short circuit or LED failure Battery failed duration test Incorrect battery voltage or Short circuit or OpenCircuit Emergency mode: Mains disconnected or Mains failure
Please note: · Fault status: If an error is detected, the indicator LED
switches to RED. Once the error has been corrected, after re-connecting the
battery with
the mains power disconnected, the indicator LED will switch back to GREEN when
mains power is re-applied . · Battery failed duration test: After an exchange
of the battery and holding down the button (>10S) to reset the timer, the
indicator LED will switch
to GREEN · Always select the desired test mode before applying the power. Do
not switch test mode whilst the luminaire is powered. · If Self-test mode is
selected, additional Manual tests are not required and if performed, will
cause premature failuunreit:omfmthe battery.
97.8
This product may contain substances that can be hazardous to the
eunnviitr:omnmment if not disposed of prop9e7rl.y8. Electrical and electronic
equip9m7.8ent should never be disposed of with general household waste but
must be separated for its correct treatment and recovery. Where possible
recycle your packaging.
LED IP20
97.8
97.8
97.8
LED IP20
LiFePO4
Connections
LiFePO4
Technical Helpline +44 (0)1924 893380
www.belllighting.co.uk
Connections
British Electric Lamps Ltd BELL House, Foxbridge Way, Normanton Industrial
Estate
Normanton, West Yorkshire. WF6 1TN
T: +44 (0)1924 893380 F: +44 (0)1924 894320 E: sales@belllighting.co.uk
www.belllighting.co.uk
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>