LUTRON LQSE-4S8-120-D Switching Modules Installation Guide

June 6, 2024
Lutron

LUTRON LQSE-4S8-120-D Switching Modules

Installation

LUTRON LQSE-4S8-120-D Switching Modules Installation
Fig1

Mains and Zone Wiring

Verify Wiring

  • Follow the steps below to verify there are no faults in the load or wiring.
  • Turn off power. DO NOT WIRE LIVE.
  • With the 5-position bypass jumper installed in the terminal blocks, the wire loads to the DH terminal blocks as shown.
  • Apply power and ensure that the desired loads power on without any faults.

Zone Wiring

  • Turn off the power. DO NOT WIRE LIVE.
  • Wire mains and loads to the module as shown.
  • Remove the 5-position bypass jumper from Hot and Load terminals.
  • Apply power. See section 5 to verify zone wiring.
  • Turn off power while servicing the module. DO NOT WIRE LIVE.
  • Wire QS link to the module as shown, note terminals 3 and 4 are twisted, screened pair. Recommended Lutron cable: GRX-CBL-346S for wiring length less than 500 ft (153 m); GRX-CBL-46L for wiring length up to 2000 ft (610 m).
    • The link may be daisy-chained or t-tapped.
    • Do not connect to terminal 2.

Note: See “HomeWorks QS Wiring Guidelines” application note on www.myLutron.com

Contact Closure Input / Output

Turn off power while servicing the module and wire CCI / CCO as shown. DO NOT WIRE LIVE.

  • CCI If not needed, leave pre-installed jumper in CCI terminals.
    • Input is Normally Closed. If Contact Closure is opened, the module will go to Emergency light levels and will not respond to inputs from other devices.
  • CCO When using a room thermostat or 3rd party contactor for a receptacle control, normally open or normally closed dry contacts must be used.
    • The CCO is not rated to control unclamped, inductive loads. Inductive loads include, but are not limited to, relays, solenoids, and motors. To control these types of equipment, a flyback diode (not included) must be used (DC voltages only). See diagram.
    • Accepts voltages of 0 –24 V~ / 0 –24 V-; see chart below for load switching capacities:
    • Switching Voltage Resistive Load R
    • 0 –24 V- 1.0 A
    • 0 –24 V~ 0.5 A

LED Diagnostic Indicators and System Wiring Verification

LED Behavior Description
Prog (Program) Continuous On Normal operation
Off No power, verify breaker is on; contact Lutron
Flashing: 1 blink / 3 seconds Device is in Program Mode

Rapid flash:

10 blinks / second

| Emergency mode / CCI open / Jumper is missing
Zn

(Zone 1-4)

| Off| Normal Operation: zone off
Continuous On| Normal Operation: zone on
Zone 1-4 LEDs start scrolling| No QS Link communication or no communication with the processor

Programming

Note: For programming: use the programming software suite.

Manual Mode O era ion

  • To turn ALL loads on the module On or Off
    • Press the “Prog” button to toggle lights On or Off.
  • To turn individual loads On or Off
    • Press the respective zone button (e.g., “Zn.1”).

FAQ (Frequently Asked Question)

  1. Can I switch receptacles with this product? No, only lighting and motor loads can be switched.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Lutron User Manuals

Related Manuals