CAL-ROYAL BTN-112 Door Bottom Sweep Instruction Manual
- June 5, 2024
- CAL-ROYAL
Table of Contents
CAL-ROYAL BTN-112 Door Bottom Sweep
Installation Guidelines
- Determine the required length, mark and cut the door bottom sweep to full width of the door.
- Close the door and place door bottom sweep along the outside bottom edge of door so that it makes contact with a threshold. Mark door in the center of slotted holes.
- Dill pilot holes in the door at marks.
- Fasten door bottom sweep to door with screws.
- Adjust to ensure firm contact with threshold / above the finish floor.
Packaging includes
- – Screws for wood and metal doors
Tools Required
- Power tool drill
- Measuring tape
- Marker
- Caulking gun
- Cutting tools (hacksaw & plier)
- Screw driver
TESTING/RATINGS
Gasketing material for fire doors intended for application to UL listed steel
frames andor classified steel covered Composite type, and hollow metal type
fire doors rated up to 3hrs; wood and plastic covered composite type fire
doors rated up to 1-1/2 hrs; and wood core type fire doors rated up to 20
minutes. 43ZY
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>