GMLighting MDL-4GR-5CCT-X Gimbal Rotatable Recessed LED Downlight Instruction Manual

June 1, 2024
GMLighting

GMLighting MDL-4GR-5CCT-X Gimbal Rotatable Recessed LED Downlight

GMLighting-MDL-4GR-5CCT-X-Gimbal-Rotatable-Recessed-LED-Downlight-
PRODUCT

Product Information

Specifications

  • Model: MDL-4GR-5CCT-X
  • Voltage: 120V
  • Dimmable: Yes
  • IC Rated : Yes
  • Color Temperature Options : 5

Product Usage Instructions

Installation Instructions

  1. Familiarize Yourself: Identify the downlight fixture model and refer to the cutout hole size in Table (Fig. 1).
  2. Select Color Temperature: Choose one of the five color temperatures using the selector switch on the junction box.
  3. Installation Preparation:
    • For Remodel: Trace and cut a circle on the surface material. Install the power supply box.
    • For New Construction: Use the new construction mounting plate. Follow mounting instructions and prepare the plate using the correct aperture cut-out.
  4. Connect Incoming Power: Connect the power supply box to the 120V power source following the wiring instructions.
  5. Mount Junction Box and Plate:
    • For Remodel Installation: Secure the junction box in the ceiling space and feed it into the hole.
    • For New Construction & Plate Install: Mount the power supply box to the new construction plate before installing the plate. Install drywall and position the plate accordingly.
  6. Connect Fixture Trim: Twist and insert the male/female connectors of the quick connector until tight.

FAQ

  • Q: Can I install this product in an area with high ambient temperatures?
    • A : No, ensure that the installation location matches the listed ambient temperature range to avoid performance issues.
  • Q: Do I need a licensed electrician for installation?
    • A: It is recommended to engage a qualified and licensed electrician for safe and proper installation.
  • Q: How many color temperature options does this product offer?
    • A : This product offers five color temperature options that can be selected using the switch on the junction box.

WARNING!

BEFORE YOU START

  • Please check local electrical codes before beginning
  • Turn power off before installing
  • Make sure to use properly rated wire

TOOLS NEEDED

  • Hole saw or keyhole saw
  • Measuring Tape
  • Stud finder

PARTS INCLUDED

  • RSD downlight assembly
  • Cut-out hole template
  • Wire connectors

NOTE: WE RECOMMEND THAT YOU ENGAGE A QUALIFIED AND LICENSED ELECTRICIAN. ALL SYSTEM PARTS ARE COMPATIBLE WITH AND ONLY WORK TOGETHER. DO NOT ATTEMPT TO SWAP OUT OTHER MANUFACTURER’S PRODUCTS. ENSURE THAT BOTH THE WALL SWITCH AND WIRING COMPARTMENT IS GROUNDED IN ACCORDANCE WITH NEC OR LOCAL ELECTRICAL CODES.

DO NOT INSTALL IN AN APPLICATION THAT IS OUTSIDE OF THE PRODUCTS LISTED AMBIENT TEMPERATURE AND IN AN AREA THAT IS NOT EASILY ACCESSED FOR SERVICE REQUIREMENTS. DOWN LIGHT IS IC RATED.

  1. Familiarize yourself with the downlight fixture model to be installed. Refer to Table ( Fig. 1 ) for cutout hole size. 120V electrical power whip should be installed by a licensed electrician before proceeding.
    • CAUTION : The space behind the location of the downlight must be clear of building materials and electrical components.GMLighting-MDL-4GR-5CCT-X-Gimbal-Rotatable-Recessed-LED-Downlight-FIG \(1\)
  2. SELECT COLOR TEMP:
    Select the color temperature of the light source. You’ll find the color temp. selector switch on the front of the junction box. You must choose one of five color temperatures before mounting the Power Supply Box ( Fig. 4A ).GMLighting-MDL-4GR-5CCT-X-Gimbal-Rotatable-Recessed-LED-Downlight-FIG
\(4\)

INSTALLATION

INSTALLATION PREP FOR REMODEL

Determine the position of your downlight (s) and trace a circle on the surface material. Use a keyhole saw or hole saw – cut through the surface ( Fig. 2 ).

NOTE: It is easier to install the power supply box at this point. Go to Step 4

INSTALLATION PREP FOR NEW CONSTRUCTION:

Use UNV-NCP’s new construction mounting plate. Consult the mounting instructions that come with this plate ( Fig. 3 ). Be sure you use the correct aperture cut-out ( Fig. 1 ) to prepare the plate for use. A New Construction Plate assists with the position of the hole location and Power Supply Box mount before drywall is installed. Do steps 4 and 5.2.

Universal Construction Plate UNV-NCP

(Sold Separately.

Scan QR

Scan QR Code for Installation Instructions)

CONNECT INCOMING POWER:

Open the Power Supply box cover and remove appropriate knock-outs to install fittings (1/2” trade size) with power leads. Connect the Power Supply Box to the 120V power source using flexible conduit or Romex (by others) through the mounting hole. Using wire connectors, connect incoming leads to power supply input leads. Ground to Green wire, Neutral to White wire, Hot Line to Black wire of box ( Fig. 4A ).

GMLighting-MDL-4GR-5CCT-X-Gimbal-Rotatable-Recessed-LED-Downlight-FIG
\(4\)

MOUNT JUNCTION BOX AND PLATE INSTALL:

REMODEL INSTALLATION:
Secure junction box in ceiling space. Use keyhole slots on back of box to hang using two round head screws (by others). ( Fig 4B ).

Proceed to feed the junction box up into hole (Fig. 4C) , leaving the quick-connect cord hanging out of the trim hole for easy-access. Go to Step 6 next.

NEW CONSTRUCTION & PLATE INSTALL:

Mount the power supply box to New Construction Plate before installing the plate (see locations in Fig. 3 ). Position the plate at the bottom of the studs, where the downlight hole in the ceiling will be. Nail plate to studs and install drywall. Locate hole in plate with stud finder and cut out hole to match plate. Pull the quick-connect cord out of the trim hole for easy access.

CONNECT FIXTURE TRIM:

Connect the quick connector by inserting and twisting the male/female connectors until tight (Fig. 5).

AIMING FIXTURE & MOUNTING TRIM:

The fixture can be tilted downward 80° and rotated 360° to aim light where needed. First, tilt light section down into the desired vertical position by pushing up on the right or left side. ( Fig. 6 ) Next, hold the light in position below the hole in the ceiling and rotate horizontally until light is aimed in the desired direction. (Fig. 7) Depress torsion mounting springs, and push MDL-4GR up into hole ( Fig. 8 ) letting the springs snap into place. Assure that the trim is held firmly and centered on hole. Make final aiming adjustments to tilt and rotation.

GMLighting-MDL-4GR-5CCT-X-Gimbal-Rotatable-Recessed-LED-Downlight-FIG
\(8\) GMLighting-MDL-
4GR-5CCT-X-Gimbal-Rotatable-Recessed-LED-Downlight-FIG
\(9\) GMLighting-MDL-
4GR-5CCT-X-Gimbal-Rotatable-Recessed-LED-Downlight-FIG
\(10\)

©2024 GM LIGHTING, LLC

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

GMLighting User Manuals

Related Manuals