PROLED L71017x2G Downlight Cabinet 110 F 2G User Guide

June 3, 2024
PROLED

Manual PROLED® Downlight CABINET 110 F 2G
item L71017x2G

Characteristics

  • SMD Chip LED in neutral white or warm white
  • Aluminium housing round
  • Housing colour white
  • not swiveling
  • Beam angel 120°
  • optional 300mA constant current switching power supply (driver)
  • dimmable with special constant current dimmer or driver
  • Operating temperature range
  • 10°C till +45°C
  • for cutouts of min. 100mm Ø
  • CE compliant with applicable European directives
  • Build in light source with energy efficiency class E

Saftey indices

Be sure to have a qualified electrician complete installation.
The customer is not entitled to claim for any lights installed without observing European safety directives.
The manufacturer is then discharged from liability when damage is caused by improper use or installation.
If any luminaire is subsequently modified, the persons responsible for the modification shall be considered as manufacturer.
Do not cover lamps with heat-insulating materials.
For indoor use only. Protection class IP20.

Installation

Please follow the sequence of installation step by step. Non-observance can lead to damage of LED.

  1. Disconnect the electric circuit.
  2. Connect the luminaire to the secondary side (low voltage) of the driver, if not already factory-made.
  3. Afterward, connect the primary side (230V) of the driver to the electric circuit.
  4. Connect the electric circuit. The luminaire should now light. Should this be not the case, disconnect again the electrical installation and check all connections and the current entry.
  5. Afterwards, connect again the electrical installation.

Please follow the sequence, if not destroying of LED

Installation steps

  1. Make a cut out for the luminaire in the ceiling and check if there is enough installation space.

  2. Cutout: luminaire to driver only after power-off.

  3. Install luminaire in the ceiling according to below sketch

  4. Adjust luminaire to suitable position in cutout.

ATTENTION:
Installation and commissioning may only be performed by qualified persons. National installation regulations must be observed. Luminaires must be disconnected from mains before any work.

05.22 Technical amendments reserved
MBN GmbH · Balthasar-Schaller-Str. 3 · 86316 Friedberg · Germany
www.proled.com

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals