signify ID-7608 LED Wall Verge Installation Guide
- May 15, 2024
- signify
Table of Contents
signify ID-7608 LED Wall Verge Installation Guide
Installation Instructions
System Overview
These instructions review how to install Verge wall mount fixtures. Verge 4 ft and 8 ft modules can be installed as individual standalone units, or they can be joined together to create continuous rows. The graphic below shows the components required to install a typical row of Verge wall mount fixtures.
IMPORTANT: Read all instructions including fixture wiring AND mechanical
details before beginning installation.
-
Verge Power Kits
1x j-box cover
1x strain relief -
Verge Left Endcap kit
1x left endcap
2x 1/2″ plugs
2x #10-24 x 1/2″ screw -
Verge Joint Kits
4x 1/2″ plug
2x #10-24 lock nut
2x #10-24 x 9/16″ bolt
1x gasket -
Verge Right Endcap Kit
1x right endcap
2x 1/2″ plugs
2x #10-24 x 1/2″ screw
TOOLS REQUIRED: Stubby Phillips screwdriver, 3/8 ” nut driver
ATTENTION: Install in accordance with national and local building and
electrical codes
Module Lengths
Sync wall mount systems come in 4ft and 8ft modules. Overall module lengths
are shown to the right. Module lengths do not include endcaps.
Indicates overall length of fixture (excluding endcaps)
Endcaps
Add two endcaps to the overall length of each row.
Mount Spacing
©Mounts variable within 2″ – 5″ of end or joint. On 8ft module, additional
mount to be located within 2″ – 5″ of center of module.
©Maximum distance between mounts is 48″.
Note: Fixture is lush with wall.
Row Configurations
The tables below indicate how 4ft and 8ft modules can be combined to create
continuous rows of various lengths.
Nominal row length | 4ft module | 8ft module |
---|---|---|
4′ | 1x | |
8′ | 1x | |
12′ | 1x | |
16′ | 2x | |
20′ | 1x | 2x |
24′ | ||
28′ | 1x | 3x |
32′ | 4x |
IMPORTANT: Read all instructions at least once prior to beginning
installation.
All mount brackets must be secured to wall structure (eg. studs or cross-
braces)
This equipment has been tested and found to comply with the limits for a Class
A digital device, pursuant to part 15 of the FCC Rules. These limits are
designed to provide reasonable protection against harmful interference when
the equipment is operated in a commercial environment. This equipment
generates, uses, and can radiate radio frequency energy and, if not installed
and used in accordance with the instruction manual, may cause harmful
interference to radio communications.
Operation of this equipment in a residential area is likely to cause harmful
interference in which case the user will be required to correct the
interference at his own expense.
-
Install utility box and utility box cover
Determine power feed location and install 2″x4″ utility box (supplied by others) parallel with fixture. Complete connections at utility box with supplied power cord. Attach cover bracket using supplied hardware. Punch power access hole in supplied cover, feed power cord through and attach strain relief on wall side. Attach cover using supplied painted hardware.
NOTE: Bottom of utility box should be in line with bottom of wall brackets. -
Install wall brackets
Bottom of utility box should be in line with bottom of wall brackets
Determine fixture mounting location and secure wall brackets to structure using appropriate fasteners (two per bracket, supplied by others). 4ft fixtures: Require two bracket assemblies; 8ft fixtures: Require three bracket assemblies. Brackets must be installed a maximum of5″ from end of fixture (on 8ft fixture, the third bracket can be 5″ of ether side of ingrown crispate).
NOTE: Mounted fixture(s) will sit approximately /4″ above top edge of bracket assembly. -
Unpack / Prepare fixtures
Arrange boxed fixtures on floor in specified locations; remove fixtures from boxes; remove plastic from fixtures. Cap all unnecessary power feed holes at back of fixture(s) using supplied 1/2″ plugs. -
Remove Top Reflector
Shift top reflector to the left and then remove the reflector.
b Remove Front Reflector
Remove the screws holding the front reflector and then remove the front reflector. -
Raise Fixture and Engage on Wall Brackets
With 2 people, raise fixture into position and engage it on hooks located on top of wall brackets, then rotate it down into position. Secure bracket using supplied hardware.
POWER LOCATIONS: Prior to engaging fixture in mounting brackets, feed installed power cord through the access hole at back of the fixture. -
Access Wiring / Remove Pan
To access wiring, remove screw from top pan and lift pan off. Apply strain relief to power cord.
NOTE: Care should be taken when lifting up top reflector to avoid disconnecting internal wiring -
Complete electrical connections
Complete electrical connections using wire nuts (supplied by others). Re- install pan and hardware removed in STEP 5. -
Level and secure first fixture
LEVEL: Using 5/16″ hex nut driver, level fixture by adjusting the tilt screw.
SECURE: Secure fixture to wall bracket assemblies by tightening the lock screw -
Install and join additional fixtures to create row
With two people, raise second fixture and engage on mounting brackets (see STEP 4). At joint, remember to insert black gasket. -
Complete electrical connections at joints
Complete in-row electrical connections.
NON-POWER LOCATIONS: Use supplied quick-wire connectors. Tuck wires into wire cavity.
POWER LOCATIONS: Remove installed quick-wire connectors and complete electrical connections using wire nuts (supplied by others). Tuck wires into wiring cavity.
NOTE: Use smallest appropriate wire nuts. -
Level and secure additional fixture
Level second fixture by adjusting the tilt screw (see step 8). Slide second fixture flush against first fixture and secure joint using supplied nut and bolt hardware (requires 3/8 nut drivers). Secure fixture to wall brackets by tightening the lock screw at each bracket location (see step 8).
Repeat steps 8-10 for each additional fixture(s) ingrown. -
Install Endcaps
Attach endcap to first and last module in each row using supplied hardware.
IMPORTANT: Do not over-tighten endcap fasteners. Leda lite recommends tightening fasteners by hand.
When nut is flush with crispate, turn an additional /4 turn. -
Re-install Front Reflector
Re-install front reflector using short (stubby) screwdriver. -
Install Light Guide and Re-install Top Reflector
Identify smooth side of the Light Guide and ensure it is installed smooth side DOWN.
Install Light Guide panel into LED fixture after joining and wiring is complete. Ensure panel is seated correctly as shown above.
Final Step: Install the top reflector and shift into place.
© 2019 Signify Holding. All rights are reserved. Reproduction in whole or part
is prohibited without the written consent of the copyright owner. Phone:
604.888.6811
Page 3
Web: ledalite.com/products Revision D November
17, 2023