tern Lockstand QuadStruts Kickstand User Guide
- June 12, 2024
- tern
Table of Contents
tern Lockstand QuadStruts Kickstand
Product Information
The Lockstand QuadStruts is a product designed to provide stability and support for bicycles. It includes the following components:
- QuadStruts Leg x 2
- QuadStruts Linkage Rod x 2
- M6 Bolt Set x 2
- M8 Bolt Set x 2
- M10 Bolt Set x 2
The product is designed to be installed on a bicycle and can be used with the Lockstand Extensions (sold separately) and the SidekickTM Wide Decks.
It is recommended to visit a local dealer for assistance if unsure about the installation process.
Product Usage Instructions
To ensure a successful installation of the Lockstand QuadStruts, please follow these steps:
- Install the Lockstand Extensions (if available).
- Remove the plastic plate from the lower deck on the drive side.
- Install the right QuadStruts Leg.
- Attach the Linkage Rod to the Atlas Lockstand.
- Cut the cable tie on the spring.
- Rotate the bearing on the end of the Linkage Rod to adjust its length.
- Attach the Linkage Rod to the QuadStruts Leg and tighten the bolt by hand.
- Measure the distance between the QuadStruts Leg and the frame (Gap A). The recommended clearance is 1-5 mm. Adjust the length of the Linkage Rod if necessary.
- Fully tighten the M8 bolt set to the Linkage Rod.
- Install the left QuadStruts Leg on the non-drive side.
- Reinstall the top plastic plate on the lower deck.
- Adjust the ground clearance on both sides.
How to Use the Lock Stand QuadStruts
For the Lockstand QuadStruts to function properly, ensure the following:
- Tire pressure is between 40 – 55 psi.
- The distance between the Dome Head Bolt on the QuadStruts Leg (Gap B) and the ground is properly set. The amount of ground clearance will depend on the total load weight.
How to Adjust Ground Clearance
Follow these steps to adjust the ground clearance:
- Make sure the bike is unloaded and on flat ground.
- Ensure both tires have a pressure between 40-55 psi.
- Do not adjust the length of the Linkage Rod.
- Make adjustments in Steps 6-8 of the installation process.
The recommended ground clearance (Gap B) varies based on the total load weight:
- 30 – 60 kg (66-132 lb): 8 mm (0.32 in)
- Above 60 kg (above 132 lb): Less than 8 mm
What’s Included
- QuadStruts Leg x 2
- QuadStruts Linkage Rod x 2
- M6 Bolt Set x 2
- M8 Bolt Set x 2
- M10 Bolt Set x 2
- If you are unsure how to install this product, please visit your local dealer.
How to Install
Tools Required (not included)
- 3 mm, 4 mm, 6 mm, and 8 mm Allen Wrenches
- 8 mm, 10 mm, 13 mm, and 17 mm Open Wrenches
- Ruler
- Scissors
Scan to view additional info
To ensure a successful installation, please note the following
- To ensure a successful installation, please note the following:
- All bolts must be tightened to the appropriate torque.
- During the installation process, keep the QuadStruts Legs in the folded position and do not cut the cable ties on the spring until instructed.
- Check that both tires have a pressure between 40-55 psi.
- Identify the left and right QuadStruts Legs. The left leg should be attached to the non-drive side and the right leg should be attached to the drive side of the bike. Make certain that during installation each leg is attached to the proper side.
- The Lockstand Extensions should be installed on the Atlas Lockstand before installation of the Lockstand QuadStruts.
- Please be aware that the Lockstand QuadStruts only fit the GSD Gen 2 bike model.
-
Install the Lockstand Extensions (sold separately).
-
Remove the plastic plate from the lower deck on the drive side.
-
Install the right QuadStruts Leg.
-
Attach the Linkage Rod to the Atlas Lockstand.
-
Cut the cable tie on the spring.
-
Rotate the bearing on the end of the Linkage Rod to adjust the length of the rod.
-
Attach the Linkage Rod to the QuadStruts Leg and tighten the bolt by hand.
-
Measure the distance between the QuadStruts Leg and the frame (Gap A). The recommended clearance is 1-5 mm. Readjust the length of the Linkage Rod as shown in Step 6 until Gap A is 1-5 mm.
If the gap is too wide, the Lockstand Extensions might bottom out while cornering. -
Fully tighten the M8 bolt set to the Linkage Rod.
-
Reinstall the top plastic plate on the lower deck.
-
Install the left QuadStruts Leg on the non-drive side by following Steps 2-10.
-
Adjust the ground clearance on both sides.
How to Use the Lock stand QuadStruts
Tire pressure must be between 40 – 55 psi and the distance between the Dome Head Bolt on the QuadStruts Leg (Gap B) and the ground must be properly set in order for the QuadStruts to function. The amount of ground clearance will depend upon total load weig
How to Adjust Ground Clearance
- Make sure the bike is unloaded and on flat ground before making any adjustments.
- Make sure that both tires have a pressure between 40-55 psi.
- Do not adjust the length of the Linkage Rod. Adjustments should be made in Steps 6-8.
Total Load Weight Ground Clearance (Gap B)
- 30 – 60 kg (66-132 lb) 8 mm (0.32”)
-
60 kg (>132 lb) < 8 mm (<0.32”)
- Adjust the length of the Dome Head Bolt until it touches the ground.
- Loosen the middle M10 nut to create a gap above the rubber spacer. Refer to the table above to determine the height of the gap.
- Rotate the Dome Head Adjustment Bolt until the rubber spacer touches the upper portion of the Leg.
- Tighten the middle M10 nut to 20-25 Nm.
- Do not rotate the Dome Head Bolt.
- Only tighten using the middle M10 nut.
Safety
- Important: Do not exceed the max load limit of 100 kg (220 lb). Please remember the max load limit for both the Atlas Lockstand and Lockstand QuadStruts includes the total weight of the bike, accessories, cargo and passengers.
- Never leave passengers or pets on a parked bike unattended.
Before Riding
- Using and riding a heavily-loaded GSD is quite different than riding without any additional weight. To become familiar with riding with a load, gradually add heavier items to the bike. Then ride in a safe location to get a feel how to balance with the additional weight.
- Check that both tires have a pressure between 40-55 psi.
- Check to ensure accessories have been correctly installed and securely fastened.
To Engage the Lockstand QuadStruts
- Hold the handlebar with both hands, use your foot to push the Lockstand Extensions toward the ground and then pull the bike backwards.
- When the bike starts to move up and over the Altas Lockstand, pull back until you feel resistance.
- Then push the handlebar downwards until the Altas Lockstand is locked.
- Ensure the Atlas Lockstand is locked before removing your hands.
To Disengage the Lockstand QuadStruts
- Hold the handlebar with both hands, press the remote unlock lever and push the bike forward.
To Park the GSD Vertically
- Disengage the Lockstand QuadStruts before parking the GSD vertically.
WARRANTY
LIMITED PRODUCT WARRANTY INFORMATION: This Product comes with a ONE (1) YEAR
Limited Warranty from the date of retail purchase by the original end-user. If
a material or workmanship defect arises and a valid claim is received within
the Warranty Period, this Product will be replaced. Mobility Holdings cannot
be held liable for damages to personal property due to misuse or improper care
and maintenance. This Product Warranty does not, under any circumstance, cover
the replacement or cost of any third party product used with or connected to
the Product. Tern, the Tern Werd (logotype), the Tern Berd (device), Lockstand
and QuadStruts used alone or in combination are trade names, trade devices or
registered trademarks of Mobility Holdings, Ltd.
© 2022. Tern is a trademark of Mobility Holdings, Ltd. All Rights Reserved..
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>