SALTO ZH 160 Wireless Hardware Gateway Installation Guide
- June 16, 2024
- SALTO
Table of Contents
**SALTO ZH 160 Wireless Hardware Gateway Installation Guide
**
Description
The Gateway is the link between the PC and SALTO’s wireless network SALTO RFnet or SALTO BLUEnet (wireless escutcheons). It gives real-time information to the PC. Gateways are completely managed through the SALTO Software, it collects all the information sent by escutcheons that belong to the Gateway. It has been designed with PoE technology, capable of power the SALTO Gateway through Ethernet infrastructure.
Electrical characteristics
Operation conditions
| Min| Typ| Max| Unit
---|---|---|---|---
Temperature| 0| 25| 60| ºC
Humidity| 35| | 85| %
Cable requirements
Ethernet | UTP CAT5e |
---|
Node Connection (AB) Generic twisted pair wire Note1
Node Connection (Vdd)24 AWG
Complies with IEC 60332, IEC 60695-11-21 or VW-1 (UL 2556)
SALTO RFnet Characteristics(if internal node installed)
Frequency Range | 2400-2483 Mhz |
---|---|
RF Standard | IEEE 802.15.4 |
Indoor Radio Range | 10/15m* |
Max output power | 5dBm |
(*) Depending upon installed environment.
UL Statement
Comply with UL/CSA 62368-1:
Product could be connected to PoE networks without routing to the outside
plant
Mechanical installation
Electrical installation
- When PoE and auxiliary power supplies are connected at the same time, Poe is disconnected.
- Pressing CLR button 5 seconds, Gateway enters in addressing mode.
Auxiliary power supply needed when Ethernet infrastructure is not PoE (Power over Ethernet).
RS485 bus termination resistor is needed (ON position) when the node is located at the end of the bus, or there are not external nodes connected.
Configuration
Addressing and configuration
Gateway is a DCHP ready device. If there is no DCHP server on the local
Ethernet network, user can manually configure a fixed IP address changing
different parameter using SALTO Gateway Web Server:
- Pressing CLR button for 5 seconds, SALTO Gateway enters in addressing mode (green LED turns to orange).
- Access to 192.168.0.234 IP address with a standard browser and configure network parameters as needed.
- Pressing again CLR button for 5 seconds or confirming the configuration, the device is going to quit the addressing mode.
When addressing process success, configure the wireless network with SALTO’s software (check the help of the application).
Installation example
(*) Depending upon installed environment.
Signalling
LED COLOR | DESCRIPTION |
---|---|
No light | Lack of power supply |
Green | Everything is OK |
Orange | Gateway in “Addressing mode” |
Red | Gateway in “Bootloader mode” state |
Flashing Green | No initialized by SALTO’s software |
The LEDs on the Ethernet Connector show the state of the Ethernet communication.
LED COLOR | DESCRIPTION |
---|---|
No light | No Ethernet Connection |
Green | Ethernet active |
Flashing Orange | Data transfer taking place through Ethernet |
Operational test
Once the product is installed, follow these steps to check the correct operation:
- Visually chek that the LED is active after power on.
- When nodes and locks are installed, check that the LED is green.
- Check Ethernet connector LED to know communication state.
This unit should be tested at least once a year as described in “Operational Test”.
European view
All contents current at time of publication.
SALTO Systems S.L. reserves the right to change availability of any item in
this catalog, its design, construction, and/or materials.
© 2023 SALTO Systems S.L.
221135-ED.2 – 16/10/2023
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>