luminii Stenos Suspended Track Installation Guide

June 13, 2024
luminii

luminii Stenos Suspended Track Installation Guide

luminii Stenos Suspended Track.png

Please read all instructions prior to installation and keep for future reference!

  1. Product to be installed by a qualified electrician
  2. Use only with class 2 power unit
  3. 24 Volts DC
  4. Suitable for dry locations only
  5. 96W max, 24ft max, and 3 Electrical Joiners max per power feed.
  6. Mechanical Joiners and End Cap isolate power circuits. Electrical Joiners are used to continue power down the track.
  7. System shapes and power feed locations shown are for reference only. Refer to custom drawing package for the particulars of a specific custom system.

FIG 1.JPG

FIG 2.JPG

IMPORTANT SAFETY INSTRUCTIONS!
WHEN INSTALLING OR USING THIS TRACK SYSTEM, BASIC SAFETY PRECAUTIONS SHOULD ALWAYS BE FOLLOWED, INCLUDING:

A. READ ALL INSTRUCTIONS.
B. DO NOT INSTALL THIS TRACK IN DAMP OR WET LOCATIONS.
C. DO NOT INSTALL ANY PART OF THE TRACK SYSTEM LESS THAN 5 FEET ABOVE THE FLOOR.
D. DO NOT INSTALL ANY LUMINAIRE ASSEMBLY CLOSER THAN 6 INCHES FROM ANY CURTAIN, OR SIMILAR COMBUSTIBLE MATERIAL.
E. DISCONNECT ELECTRICAL POWER BEFORE ADDING TO OR CHANGING THE CONFIGURATION OF THE TRACK.
F. DO NOT ATTEMPT TO ENERGIZE ANYTHING OTHER THAN LIGHTING TRACK LUMINAIRES ON THE TRACK. TO REDUCE THE RISK OF FIRE AND ELECTRIC SHOCK, DO NOT
ATTEMPT TO CONNECT POWER TOOLS, EXTENSION CORDS, APPLIANCES, AND THE LIKE TO THE TRACK.

Mounting Preparations

FIG 3 Mounting Preparations.JPG

FIG 4 Mounting Preparations.JPG

FIG 5 Mounting Preparations.JPG

Suspended Track – Straight Run

FIG 6 Suspended Track – Straight Run.JPG

FIG 7 Mounting Preparations.JPG

FIG 8 Mounting Preparations.JPG

Power Feed Installation

FIG 9 Power Feed Installation.JPG

Canopy Installation (steps require multiple people)

FIG 10 Power Feed Installation.JPG

FIG 11 Power Feed Installation.JPG

Continuous Row Mounting (if applicable)

FIG 12 Continuous Row Mounting.JPG

S.10 Connect A/C cable to cable gripper on track section 2, following step S.2.
S.11 Slide track section 2 onto straight mechanical joiner on track section 1. Adjust position following steps S.2-S.4.
S.12 Once the two tracks are leveled, tighten the set screws on the mechanical straight joiner to secure.

FIG 13 Continuous Row Mounting.JPG

FIG 14 Continuous Row Mounting.JPG

L – Suspended Track – L Shape

FIG 15 L - Suspended Track – L Shape.JPG

Marking location and installing mounting brackets

FIG 16 Marking location and installing mounting
brackets.JPG

FIG 17 Marking location and installing mounting
brackets.JPG

Power Feed Installation

FIG 18 Power Feed Installation.JPG

FIG 19 Power Feed Installation.JPG

Mount next track section to the ceiling and join to previous track section(s)

FIG 20 Mount next track section to the ceiling.JPG

FIG 21 Mount next track section to the ceiling.JPG

Install Electrical L Joiner and Cosmetic Finish Plates

FIG 22 Install Electrical L Joiner and Cosmetic Finish
Plates.JPG

U – Suspended Track – U Shape

FIG 23 U – Suspended Track – U Shape.JPG

Marking location and installing mounting brackets

FIG 24 Marking location and installing mounting
brackets.JPG

FIG 25 Marking location and installing mounting
brackets.JPG

Power Feed Installation

FIG 26 Power Feed Installation.JPG

FIG 27 Power Feed Installation.JPG

Mount next track section to the ceiling and join to previous track section(s)

FIG 28 Power Feed Installation.JPG

FIG 29 Power Feed Installation.JPG

FIG 30 Power Feed Installation.JPG

R – Suspended Track – Rectangle Shape

FIG 31 R - Suspended Track – Rectangle Shape.JPG

Power Feed Installation

FIG 32 Power Feed Installation.JPG

FIG 33 Power Feed Installation.JPG

Marking location and installing mounting brackets

FIG 34 Marking location and installing mounting
brackets.JPG

FIG 35 Marking location and installing mounting
brackets.JPG

Mount next track section to the ceiling and join to previous track section(s)

FIG 36 Mount next track section to the ceiling.JPG

R.12 Connect A/C cable to cable gripper on track section 2, following step U.2 .
R.13 Slide track section 2 onto mechanical L joiner on track section 1. Adjust position following steps R.10-R.11
R.14 Once the two tracks are leveled, tighten the set screws on the mechanical L joiner to secure.
R.15 Repeat steps R.12-R.14 for track section 3.
R.16 Slide track section 4 onto mechanical L joiners on track section 1 and track sections 3. Adjust position following steps R.10-R.11.
R.17 Once the two tracks are leveled, tighten the set screws on the mechanical L joiner to secure.

Install Electrical L Joiners and Magnetic Cover Plates

FIG 37 Install Electrical L Joiners and Magnetic Cover
Plates.JPG

*LUMINII RESERVES THE RIGHTS TO CHANGE SPECIFICATION & INSTRUCTION WITHOUT NOTICE

Read More About This Manual & Download PDF:

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals