COOLON ind-manual-emp-tnr-0.5 Emergency Tunnel Ray Industrial Led User Guide

June 13, 2024
COOLON

COOLON ind-manual-emp-tnr-0.5 Emergency Tunnel Ray Industrial Led

Product Information

  • Product Name: EMERGENCY TUNNEL RAY INDUSTRIAL LED
  • Manual Edition: 0.5
  • Electrical Characteristics:
    • IP Rating: IP66
    • IK Rating: IK09
  • Mounting Plate Dimensions: 398mm x 24mm
  • Product Dimensions: 398mm x 380mm x 110mm

Product Usage Instructions

  • Step 1: Choose luminaire position and orientation
    • For horizontal mounting, ensure sufficient clearance is allowed for the airflow through the heatsink. Avoid blocking the air vents.
    • For vertical mounting, mount the TNR in the specified orientation to maximize airflow through the heatsink.
  • Step 2: Securely mount the Tunnel Ray Luminaire. Do not open the junction box or lid.
  • Step 3: Connect the Luminaire cable to the Coolon Emergency Pack. Do not unplug or loosen the sealed cable glands.
  • Step 4: Wire Emergency Pack according to the instructions provided with the unit.
    • Turn the Unit Isolation Switch to the ON position.
    • Close Emergency Battery unit and secure.
    • Plug Luminaire connector into the Emergency Battery unit.
  • Testing Connection:
    • When the unit is first connected, the Emergency battery will commence charging.
    • During mains presence, the unit Charge Monitor will illuminate red.
    • To test the connection, press the Test Button. The Charge Monitor will turn off and the luminaire will illuminate.
    • If the luminaire does not illuminate when the button is pressed, please check the wiring.
    • If the Charge Monitor is not illuminated while the Test Button is not pressed and mains is present, please check the Unit Isolation Switch is not in the OFF position. If the Unit Isolation Switch is in the ON position, please check the wiring.

DIMENSION

COOLON-ind-manual-emp-tnr-0-5-Emergency-Tunnel-Ray-Industrial-
Led-1

INSTALLATION INSTRUCTIONS

  1. Choose luminaire position and orientation. When choosing the location of Tunnel Ray luminaire, please ensure that sufficient clearance is allowed for the airflow through the heatsink. Avoid blocking the air vents.
  2. Securely mount the Tunnel Ray Luminaire. Do not open the junction box or lid.
  3. Connect the Luminaire cable to the Coolon Emergency Pack. Do not unplug or loosen the sealed cable glands.
  4. Wire Emergency Pack according to the instructions provided with the unit.

Testing Connection

  • When unit is first connected, the Emergency battery will commence charging.
  • During mains presence the unit Charge Monitor will illuminate red.
  • To test the connection, press the Test Button. When pressed, the Charge Monitor will turn off and the luminaire will illuminate.
  • If luminaire does not illuminate when button is pressed, please check the wiring.
  • If Charge Monitor is not illuminated while Test Button is not pressed and mains is present, please check the Unit Isolation Switch is not in the “OFF” position. If Unit Isolation Switch is in the “ON” position, please check the wiring.

Emergency Power Pack

COOLON-ind-manual-emp-tnr-0-5-Emergency-Tunnel-Ray-Industrial-
Led-7

support@coolon.com.au • aus. 1300 287 533 • intl.
+613 8681 3633
www.coolon.com.au 
www.coolon.com.au Product must be installed by a suitably qualified person. All documentation is subject to change without notice. Refer to our website for the latest information.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

COOLON User Manuals

Related Manuals