PLANET Technology BSP-360 Industrial Renewable Power User Guide
- June 13, 2024
- Planet Technology
Table of Contents
- PLANET Technology BSP-360 Industrial Renewable Power
- Product Information
- Product Usage Instructions
- Safety Precautions
- Package Contents
- Requirements
- Hardware Introduction
- Hardware Installation
- Web Management
- Deployed Devices Monitored via NMS-360 Controller
- Customer Support
- Appendix
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
PLANET Technology BSP-360 Industrial Renewable Power
Product Information
The Industrial Renewable Power 5-Port Gigabit Managed Switch/Router with 4-Port 802.3at PoE+ (BSP-360) is a high-performance networking device designed for industrial applications. It provides reliable and efficient network connectivity with Power over Ethernet (PoE+) capabilities.
Key Features:
- 5 auto-sensing 10/100/1000Mbps Ethernet RJ45 ports
- 4 ports with 802.3at PoE+ support
- Remote login interface for management
- LED indicators for easy monitoring
- Supports PV (Photovoltaic) arrays and batteries for renewable power
- Compact and rugged design for industrial environments
Requirements for Management:
- A workstation with an Ethernet NIC (Network Interface Card)
- An internet browser compatible with TCP/IP protocols (e.g., Chrome 98.0.xxx or above)
- Web browser and JAVA runtime environment plug-in installed on the workstation
- Ethernet port connection using standard network (UTP) cables with RJ45 connectors
- PV (Photovoltaic) array and battery setup meeting the specified requirements
Hardware Introduction:
The BSP-360 has a front panel that includes 5 auto-sensing 10/100/1000Mbps
Ethernet RJ45 ports, one USB interface, and LED indicators for easy
monitoring. The device also features a DC output of 24V with a maximum current
of 2A.
Note:
For detailed installation and usage instructions, please refer to the Quick
Installation Guide included in the package.
Product Usage Instructions
Safety Precautions:
- All electrical work must comply with local and international electrical codes.
- Read all instructions and cautionary markings on the guide, controller, batteries, PV array, and other devices.
- Use insulated tools when working with the inverter, controller, batteries, or any DC source to prevent short-circuits.
- Remove all jewelry to reduce the risk of accidental exposure to live circuits.
- Avoid attempting to repair the unit unless fully qualified as it contains no user-serviceable parts.
Package Contents:
- 1 x BSP-360 Industrial Renewable Power Switch/Router
- 1 x Quick Installation Guide
- 1 x Wall Mounting Kit
- 1 x DIN-rail Kit
- 5 x RJ45 Dust Cap
If any item is missing or damaged, contact your dealer immediately. Retain the original packing materials in case you need to return the product for repair.
Safety Precautions
Please read the following before using:
- All electrical work must be done in accordance with local, and/or international electrical codes.
- Before installing or using this device, read all instructions and cautionary marking located in (or on) this guide, the controller, the batteries, PV (Photovol-taic) array and any other device used.
- To reduce the risk of short-circuits, use insulated tools when installing or working with the inverter, the controller, the batteries, or any DC source (e.g., PV).
- Remove all jewelry. This will greatly reduce the chance of accidental exposure to live circuits.
- The controller contains more than one live circuit (batteries and PV array). Power may be present at more than one source.
- This product contains no user serviceable parts. Do not attempt to repair this unit unless fully qualified.
Package Contents
Thank you for purchasing PLANET Industrial Renewable Energy Managed PoE Switch/Router, BSP-360. Open the box of the BSP-360 and carefully unpack it. The box should contain the following items:
If any of these are missing or damaged, please contact your dealer immediately. If possible, retain the carton including the original packing materials to enable you to repack the product in case there is a need to return it to us for repair.
Requirements
PLANET BSP-360 provides a remote login interface for management purposes. The following equipment is necessary for further management:
- Workstation is installed with Ethernet NIC (Network Interface Card)
- Choice of Internet browsers includes Windows XP/2003, Vista, Windows 7, Windows 8, Windows 10, Windows 11, MAC OS X, Linux, Fedora, Ubuntu or other platforms compatible with TCP/IP protocols.
- The above workstation is installed with Web browser and JAVA runtime envi-ronment plug-in.
- Ethernet Port connection
- Use standard network (UTP) cables with RJ45 connectors.
- PV and battery
- Two 12V lithium or lead-acid batteries connected in series or one 24V lithium or lead-acid battery.
- The maximum operating voltage of PV is 45V.
It is recommended to use Chrome 98.0.xxx or above to access the BSP-360.
Hardware Introduction
Front Panel
The front panel of the BSP-360 consists of 5 auto-sensing 10/100/1000Mbps
Ethernet RJ45 ports and one USB interface. The LED Indicators are also located
on the RJ45 ports of the BSP-360.
Figure 3-1 Front Panel of BSP-360
Item | Interface | Description |
---|---|---|
1 | Port-1~Port-4 | 4 10/100/1000BASE-T RJ45 auto-MDI/MDI-X ports with |
802.af/at PoE+ injector function.
2
|
Port-5
| One 10/100/1000BASE-T RJ45 auto-MDI/MDI-X port. Port-5 functions as WAN
port when the operation mode of BSP-360 is configured to “Gateway mode”.
3| USB| Connect the USB storage to USB port and back up the
configuration file.
4| Reset Button| < 5 seconds: System reboot.
10 seconds: Factory default.
5
| 4-pin Terminal Block| 2 x 24V 2A DC output connector.
The output voltage is the same as battery voltage. Maximum power output is clamped at 48W.
LED Indicators
System
LED | Color | Function |
---|---|---|
PWR | Green | On |
Alarm
| ****
Red
| Slow Blinks| To indicate PV < 24V.
Fast Blinks| To indicate battery voltage is ≤ LVD.
PV
System
| ****
Green
| Slow Blinks| To indicate the system is “Not Charging”.
Fast Blinks| To indicate the battery is “Charging”.
50W| Amber| On| To indicate the system consumes over 50-watt
PoE power budget.
100W| Amber| On| To indicate the system consumes over 100-watt
PoE power budget.
120W| Amber| On| To indicate the system consumes a total
120-watt PoE power budget.
The detection voltage will have a tolerance of ±0.7V.
PoE 10/100/1000BASE-T Interfaces (Port-1 to Port-4)
LED | Color | Function |
---|---|---|
LNK/ACT | Green | Blinks |
established.
PoE
| ****
Amber
| Lights| To indicate the port is providing DC in-line power.
Off| To indicate the connected device is not a PoE Powered Device (PD).
10/100/1000BASE-T Interfaces (Port-5)
LED | Color | Function |
---|---|---|
LNK/ACT | Green | Blinks |
established.
Upper Panel
The upper panel of the BSP-360 consists of one terminal block connector with
PV and battery power inputs.
The input voltage range of each interface is shown as follows:
PV In Connector
24~45V DC
Battery In/Out
24V DC
The wire gauge for the terminal block should be in the range from 16 to 20 AWG.
Fault Alarm Connectors
The fault alarm contacts are in the middle (3 & 4) of the terminal block
connector as the picture shows below. Inserting the wires, the Renewable
Energy Switch will detect the fault status of the power failure.
- When the system is “ON”, the fault alarm is “off”.
- When the system is “OFF”, the fault alarm will “trigger”.
Hardware Installation
The following section describes the hardware installation of the BSP-360. Before connecting any network device to the BSP-360, read this chapter carefully.
Please follow the following steps to install the system:
Step 1. Installing BSP-360
Place the BSP-360 in a desired location using the wall-mount or Din-rail
fixtures.
- Please install the BSP-360 in a proper enclosure or shelter.
- The BSP-360 must be grounded.
Step 2. Installing battery
- Connect the negative electrode of the battery to the terminal for the nega-tive electrode of the battery on the BSP-360. By default, the lithium battery is in use.
- Connect the positive electrode of the battery to the terminal for the positive electrode of the battery on the BSP-360.
- After the battery is well connected to the BSP-360, the PWR LED will be ON and System LED will slowly blink, and Alarm LED will slowly blink.
The BSP-360 accepts the 24V DC battery system. Please pay attention to the battery characteristics and also refer to the section — Recommended Settings for Different Batteries in the Quick Installation Guide.
- Be noted for the thickness of electric wire and please refer to the section — Recommended Use of the Connected Wires in the Quick Installation Guide.
- Before the first installation
- The lead-acid battery default LVD (Low Voltage Disconnec-tion) is set at 22.2V DC; we suggest charging the voltage of battery to 23.5V DC or above for the BSP-360.
- The lithium battery default LVD (Low Voltage Disconnec-tion) is set at 21.3V DC; we suggest charging the voltage of battery to 24V DC or above for the BSP-360.
- Check the total power consumption of your connected network device before installation. Improper battery capacity could shorten the battery life or make your network device lack of power supply.
- Please link to PLANET Download Center and download BSP360-PV&BAT_calculation. The calculation list can help you to select solar panel and battery. Refer to Section 6 for customer support.
Step 3. Installing PV Panel
- Connect the negative electrode of the PV panel to the terminal for the negative electrode of the PV panel on the BSP-360.
- Connect the positive electrode of the PV panel to the terminal for the posi-tive electrode of the PV panel on the BSP-360.
- After the PV is well connected to the BSP-360 and providing 24V or above voltage, the System LED will blink fast for battery charge if the battery is not full.
- Be noted for the thickness of electric wire and please refer to the section — Recommended Use of the Connected Wires in the Quick Installation Guide.
- Check the total power consumption of your device and the sunshine duration of your area from the weather bureau for a proper PV. Improper PV could shorten the battery life or provide insufficient power to the BSP-360.
- The BSP-360 supports a maximum of 45V 8.8A DC input.
Step 4. Connecting 802.3af/802.3at PoE Device
- Connect the PoE devices to ports 1~4 on the BSP-360.
- Check the PoE-in-Use LED. If the network devices such as PoE camera and PoE wireless AP are powered, the PoE-in-use LED will turn ON and Link/Act LED will blink for a successful connection or data receiving.
- Please use Cat5/5e or above cable and the maximum distance should within 100 meters.
- If the Network devices are installed outdoors, please consider to install a well-grounded lightning arrestor (such as PLANET ELA-100) to protect the network device and the BSP-360.
Step 5. Wiring the DC Outputs
Please follow the steps below to insert the power wires for DC power required
equipment.
- Please find the terminal block connector with two DC power outputs shown below:
- Insert the Positive and Negative DC wires into the V+ and V- terminals, respectively; Terminals 1 and 3 for Power 1, and Terminals 2 and 4 for Power 2.
- Connect the other points of DC power wires to the power devices. Tighten the wire-clamp screws for preventing the wires from loosening.
- Install the terminal block on the BSP-360.
- The voltage of DC out is based on the battery voltage and the maximum DC out from the BSP-360 is 24VDC, 2A.
- The wire gauge for the terminal block should be in the range from 16 to 20 AWG.
- The external device should also be grounded properly.
Please ensure the output voltage is correct for remote device. Otherwise, it will damage your remote device.
Step 6. Connecting to PC or your remote Ethernet network.
After completing the above 6 steps, the BSP-360 is ready for service.
Web Management
- The following shows how to start up the Web Management of the BSP-360. Note the BSP-360 is configured through an Ethernet connection. Please make sure the manager PC must be set to the same IP subnet address.
- For example, the default IP address of the BSP-360 is 192.168.0.100, then the manager PC should be set to 192.168.0.x (where x is a number between 1 and 254, except 100), and the default subnet mask is 255.255.255.0.
Logging in to the BSP-360
- Step 1. Use Internet Explorer 8.0 or above for Web browser and enter IP address http://192.168.0.100 (the factory-default IP address) to access the Web interface.
- Step 2. When the following dialog box appears, please enter the default user name “admin” and password “admin” (or the password you have changed before).
- Default IP Address: 192.168.0.100
- Default User Name: admin
- Default Password: admin
- Step 3. After entering the password, the main screen appears. The above banner shows the information of Green Power, Total Power Usage, PoE Usage and Battery Capacity.
- Step 4. The Function Menu on the left of the Web page lets you access all the functions and status the BSP-360 provides.
Now, you can use the Web management interface to continue the BSP-360 management. Please refer to the user manual for more details.
- For security reason, please change and memorize the new pass-word after this first setup.
Deployed Devices Monitored via NMS-360 Controller
[OPTIONAL] Deployed Devices Monitored via NMS-360 Controller
If you also have an NMS-360 controller, please refer to the following steps
to set up the central management.
The NMS-360 is used to centrally manage a large number of BSP-360. Therefore, you need to upgrade the BSP-360 firmware before using NMS-360. Please download and use the latest BSP-360 firmware from the website so that setting can be completed smoothly. The NMS-360 incorporated in a workstation can monitor the BSP-360s compliant with the MQTT Protocol, SNMP Protocol, ONVIF Protocol and PLANET Smart Discovery utility. Follow the steps below to set up the NMS-360 and BSP-360 accordingly.
- Step 1. Connect the devices, NMS-360 Controller and your computer to the same network.
- Step 2. BSP-360: Log in to the BSP-360 Web User Interface and enable both the SNMP and NMS controller functions.
If you want to use central management, and ONVIF monitoring functions, please refer to the user manual or NMS-360 series related profile.
Customer Support
Thank you for purchasing PLANET products. You can browse our online FAQ resource on PLANET web site first to check if it could solve your issue. If you need more support information, please contact PLANET switch support team.
Support team mail address:
BSP-360 User’s Manual:
https://www.planet.com.tw/en/support/downloads?&method=keyword&keyword=BSP-360&view=3#list.
BSP-360 PV &BAT Calculation:
https://www.planet.com.tw/en/support/faq?method=keyword&keyword=BSP-360+Calculation.
Appendix
Appendix A: Recommended Use of the Connected Wires
The wire gauges for the current are shown below:
Gauge | Diameter | Amp |
---|---|---|
AWG #16 | 1.295 | 10.00 |
AWG #17 | 1.143 | 8.40 |
AWG #18 | 1.016 | 6.40 |
AWG #19 | 0.914 | 5.20 |
AWG #20 | 0.813 | 4.00 |
Appendix B: Recommended Settings for Batteries
Use Lead-acid battery for BSP-360. You could set the Battery type at Battery
Management on the web of BSP-360.
Battery Management
Use Lithium battery for BSP-360. You could set the Battery type at Battery Management on the web of BSP-360.
Battery Management
Appendix C: BSP-360 Battery Default Setting
Battery Information
Type/Setting| Lithium Battery (Default)| __
Lead-acid Battery
FCV (Float Charge Voltage)| 26.6V| 27.2V
ACV (Absorption Charge Voltage)| 28.7V| 29.2V
LVD (Low Voltage Disconnection)| 21.3V| 22.2V
LVR (Low Voltage Reconnection)| 24.0V| 23.5V
Default Charge Board LVD| 21.3V
Default Charge Board LVR| 24.0V
opyright © PLANET Technology Corp. 2022. Contents are subject to revision without prior notice.
PLANET is a registered trademark of PLANET Technology Corp. All other trademarks belong to their respective owners.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>