USX MOUNT SAS008 Full Motion TV Wall Mount Instruction Manual

June 12, 2024
USX-MOUNT

**USX MOUNT SAS008 Full Motion TV Wall Mount Instruction Manual

**

CAUTION: PLEASE READ ENTIRE MANUA L PRIOR TO USE AND S AVE THESE

INSTRUCTIONS

Before getting started, let ’s check below lists to make sure it is just right for you!

  1. Does your sound bar (including accessories) weigh MORE than 22 lbs. (10 kg)?
    No? Perfect – you may continue. Yes?

This mount is NOT compatible.
CAUTION DO NO T exceed the maximum weight indicated. This mounting system is intended for use only with the maximum weights indicated. Use with products heavier than the maximum weights indicated may result in collapse of the mount and its accessories, causing possible injury.

  1. If you want to mount on the wall, you should know what your wall made of.

    • Solid Drywal

    • Solid concrete

    • Drywall with wood studs?

    • Unsure?
      Message to us.

  2. Do you have all the tools needed? (NO T INCLUDE)

    • Tape Measure

    • Pencil

    • Electric Drill

    • 3/8 in. (10 mm) Socket Wrench

    • Level

Drywall Install

  * Hammer  

Concrete Install

  * 3/8 in. (10 mm) Masonry Drill Bit  

Wood Stud Install

  * Stud Finder  

  * 1/8 in. (3 mm) Wood Drill Bit  
  1. CAUTION
    • Do not use this product for any purpose not explicitly specified by manufacturer.
    • Manufacturer is not responsible for damage or injury caused by incorrect assembly or use.

Dimensions

FRON T VIEW

3-D

RIGH T VIEW – RETRACTED

RIGH T VIEW – EXTENDED

Parts and Hardware

WARNING: This product contains small items that could be a choking hazard if swallowed. Before starting assembly, verify all parts
are included and undamaged. If any parts are missing or damaged, do not return the damaged item to your dealer; contact
Customer Service.
Never use damaged parts!
NOTE: Not all hardware included will be used.
Parts and Hardware for Brackets Installation

  • M 6×5 0mm Lag Bolt

03×2

  • ¢1.6 x25mm Nail

04×24

  • Allen Key

05×1

  • Wall Bracket

06x 2

**Concrete wall anchor (NO T INCLUDED)

** Concrete Wall Anchor 2pcs
Contact us and message to us to have these additional pieces shipped directly to you.

STEP : 1 Split wall bracket into 2 parts

Loosen the screw (the screw remains on the hook) with allen key , and split it into two parts: the wall plate and the hook.

STEP : 2 Wall plate installation

Option 1 For Drywall

CAUTION: Avoid potential personal injury or property damage!

  • Drywall covering the wall, must exceed 3/8 in. (10 mm)
  1. Please measure the length (L) of your sound bar

  2. Fixing the wall plates to the drywall with 24 steel nails

IMPO RTANT : The installation distance of the two wall plates should be less than the sound bar length (L), and the distance between the wall plate and the ground is H. Before putting sound bar, please try to pull the wall plate to make sure that it has been assembled on the wall tightly.
Option 2 For solid concrete wall or brick wall

CAUTION: Avoid potential personal injury or property damage!

  • Mount the wall plate assembly directly onto the concrete surface
  • Minimum solid concrete thickness: 8 in. (203 mm)
  1. Please measure the length (L) of your sound bar.

  2. Drill 2 pilot holes using a 3/8 in. (10 mm) diameter masonry drill bit.

  3. Insert 2 anchors
    CAUTION: Be sure the anchors are seated flush with the concrete surface

  4. Install wall plate using 2 lag bolts . Tighten the lag bolts only until they are pulled firmly against the wall plate.

CAUTION: Improper use could reduce the holding power of the lag bolt.
DO NOT over-tighten the lag bolts.
IMPORTANT: The installation distance of the two wall plates should be less than the sound bar length (L), and the distance between the drilling position and the ground is H. Pilot holes must be drilled to a depth of 2.16 in. (55 mm).
Option 3 For wood studs
CAUTION: Avoid potential personal injury or property damage!

  • Drywall covering the wall, must not exceed 5/8 in. (16 mm)
  • Minimum wood stud size: common 2 x 4 in. (51 x 102 mm) nominal 1½ x 3½ in. (38 x 89 mm)
  • Stud center must be verified.
  1. Please measure the length (L) of your sound bar.

  2. Finding your wooden studs and mark the center of the wooden studs.

IMPORTANT: The installation distance of the two wooden studs center should be less than the sound bar length (L), If it is longer than the sound bar length (L), you can finish the installation on drywall directly as option

  1. Drill pilot holes using a 1/8 in. (3 mm) diameter drill bit.

IMPORTANT: Pilot holes must be drilled to a depth of 2.16 in. (55 mm). Be sure to drill into the center of the studs. The distance between the drilling position and the ground is H.

  1. Fix wall plate to the wall with lag bolts.

NEVER USE ANCHOR FOR WOOD STUDS ASSEMBLY

CAUTION: Improper use could reduce the holding power of the lag bolt.
Before putting sound bar, please try to pull the wall plate to make sure that it has been assembled on the wall tightly.
STEP 3 Hang the Hooks onto wall plate
Hang the hooks onto wall plate and tighten the screws.

STEP 4 Put the Sound bar onto hooks

If the width of your sound bar is within 3.5” ~5.6”, you can just simply put your sound bar on the hooks. You can adjust the hook width by bolts as below drawing shown.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals