REZNOR LDAP-DJ20 High-Elevation Pressure Switch Replacement Kit

OPTION DJ20 FOR MODEL LDAP

NOTE: For unit sizes 800 and 1200, be sure to replace the pressure switch in each heat section but do not replace the flue connection box pressure switch—it is the same for all elevations.

  • For installations at elevations >6,000 feet (>1,830 meters), option DJ20 is required and the heat section pressure switch(es) must be replaced before the heater is operated.
  • Refer to the installation/operation/maintenance manual provided with the heater for important safety information.
  • Ensure that all components listed in Table 1 are available before beginning installation.

Table 1. High-Elevation Pressure Switch Replacement Kit (Option DJ20) Components

Unit Size| Kit PN| Heat Section
Pressure Switch
PN (Quantity)| Differential Pressure (IN WC)| Label Color
Startup Cold| Equilibrium
Hot| OFF Setpoint| ON Setpoint
400| 208078| 197029 (1)| 1.75 to 1.45| 1.00 to 0.80| 0.60| 0/8| Light blue
800| 208892| 197029 (2)| 1.85 to 1.55| 1.05 to 0.85
1200| 208893| 197029 (3)| 2.35 to 1.85| 1.50 to 0.95

DANGER

  • These instructions are designed to prepare a heater for high-elevation operation prior to installation. If the heater has already been installed, turn off the gas and electric for your safety before servicing.
  • The high-elevation pressure switch replacement kit is to be selected and installed by a qualified service person in accordance with these instructions and in compliance with all codes and requirements of authorities having jurisdiction. The qualified agency performing this work assumes responsibility for this installation.

Replace the heat section pressure switch(es) as follows:

  1. If heater has already been installed, turn OFF gas and electric.
  2. Locate pressure switch in heat section (refer to installation/operation/maintenance manual provided with heater) and mark and disconnect two switch wires.
  3. Mark and disconnect sensing tube(s) from pressure switch.
  4. Remove two screws that secure mounting bracket and remove bracket and pressure switch. Save bracket and screws for reuse.
  5. Install replacement pressure switch (refer to Table 1) using mounting bracket and two screws. Reconnect sensing tube(s) and wires.
  6. For unit size 800 or 1200, replace remaining heat section pressure switch(es).
  7. When heater has been installed, as part of startup procedure, adjust outlet pressure of combination gas valve(s) and attach high-elevation adjustment label (refer to installation/operation/maintenance manual provided with heater).

Specifications and illustrations subject to change without notice or incurring obligations.
Latest version of this manual is available at www.reznorhvac.com.
©2022 Nortek Global HVAC LLC, O’Fallon, MO. All rights reserved.
LDAP-DJ20 (01-22) 208081-A