AVer E12 Mobile Device Charger User Manual
- June 3, 2024
- AVer
Table of Contents
AVer E12 Mobile Device Charger
Package Contents
The following items are included in the package. Please check if each item is available before installing.
Tools Required
See the assembly instructions for the tools you’ll need to use
Dimensions
Diagram
Front and Back
Front and Back
-
Top cover
-
Finger pull
-
Door lock
-
Foot rubber
-
Adapter cable holes
Sides -
Power cable hole
-
Ventilation holes
-
Handle
-
Fix Plate holes
-
Snap Rivet holes
-
Ground
-
Antitheft Slot
Top and Bottom -
Ventilation holes
Installation
Please check that you have taken out all package contents out and the numbers
of each item is correct before getting started.
Parts list
Before installing the charging station
- Be sure to reserve enough space for installation. It is recommended to reserve at least 47.2”(W)* 35.42”(D) inches.
- It is recommended to allocate 2 people for efficient assembly.
Step 1: Install door lock cover (Optional)
First, attach the door lock cover hole on the nut column, and then install the
door lock cover using 2 X umbrella head screws into the adapter drawer.
[Note]
It is recommended to use a long screwdriver to tighten screws.
Step 2: Connect the power strip to a wall outlet
- Remove the packing material of the power strip.
- Feed the power strip through the hole provided.
- Connect the power strip to a wall outlet.
[Note]
Set the power socket to the OFF position before plugging the charging station
to wall outlet.
Step 3: Adapter configuration
- Place the power adapter onto the adapter drawer in order.
- Pass the DC-end of the adapter cable through the hole located on the back of the adapter drawer.
- Plug-in the AC-end of the adapter cable to the power AC socket.
- Watch your hand when you place the chassis on the adapter drawer. Please make sure the chassis is placed along the edge of the door lock. (The chassis faces outwards, the door lock face inwards)
[Note]
- Please place the power adapter onto the adapter drawer in order, don’t stack the adapters.
- For some device adapters that are not compatible with the power strip (EX: e. g. iPad 8, iPad Air 4th generation), please contact AVer for help.
Step 4: Extend and fix the sides of the chassis
- Extend the sides of the chassis out at right angles.
- Insert 2 x flat head screws and 2 x snap rivets through the hole located on the corners of the rear plate. Each corner has one on the top and one on the bottom (4 screws / snap rivets total).
- Fix the chassis on the adapter drawer with 3 x flat head screws.
[Note]
- It is recommended to use a long screwdriver to tighten screws.
- It is recommended to allocate 2 people for efficient assembly.
Step 5: Insert dividers into the slots on the shelf
Insert 13 x dividers into the slots on the shelf. Ensure that all dividers are
properly seated.
Step 6: Cable management
- Determine the length of power cable that is needed to reach from the hole located on the back of adapter drawer to the devices.
- Route the adapter DC-end cable. Along with the V-shape routing groove.
- Snap the locking piece until hear a “click” to firmly secure the DC-end cable. Remember to reserve enough length of power cable to connect the power plug of the device.
- Place the mobile device into the bay and plug in the DC-connector to the mobile device.
[Note]
It is recommended to allocate 2 people for efficient device cabling.
Step 7: Install top cover (Optional)
Place the top cover on the top of both sides. Use 4 x snap rivets on the two
outer holes on both sides to prevent removal.
[Note]
If you insert the snap rivet into the wrong hole, it is recommended to remove
it with a scissor and then reinstall with a new snap rivet.
Step 8: Secure the charging station (Optional)
For security, use the lock key to secure the door.
Desk mount (Optional)
- Remove the pre-installed screws on the top of cable grommet on each side (See the figure as below for exact locations).
- Determine the appropriate L- shaped mounting bracket location and fix 2 x L- shaped mounting bracket with screws.
- Secure the station to the wall studs for drywall mounting. Drill the holes at the wall studs through the drywall, and firmly tap 4 x drywall anchors in until they are flush with the wall.
- For concrete wall mounting, please use 4 x concrete anchors and fully flush the anchors to the drilled holes.
- Secure the charging station to the wall with 4 x anchor screws (with 4 x washers).
[Note]
- Please note that the charging station needs to be placed on the desk. The unit may be secured to the surface by inserting 2 screws appropriately.
- The station must be installed by a qualified technician. Use suitable mounting means when installing to cinder block, concrete or drywall.
- It is recommended to use a screwdriver to loosen the screws.
Troubleshooting
Q: Why are all of my devices plugged in but not charging?
- 1. Make sure power cords are undamaged.
- 2. Make sure power cords are firmly inserted into the available socket with stable current.
- 3. Make sure the power plug and current consumption are compliant with your country specification standards.
Q: My station’s main power cord or station components are damaged. Are they
covered under warranty?
A: We provide a 10 year warranty on the station and main frame, and 5 years
warranty on the electrical components.
Q: How do I know if my devices will exceed more than the allotted current?
A: Have a qualified electrician verify the current consumption of your
devices. Perform the test with devices installed and batteries discharged.
Q: When I plug in the device it trips the circuit breaker. What is wrong?
A: You may have other equipment or appliances sharing the same circuit that is
causing a circuit overload. Have a qualified electrician check that adequate
power is available in the circuit.
Specifications
Model | E12 |
---|---|
Capacity | 12 |
Supported Devices | Mobile devices up to 15.6″ |
Charging Type | Fully Charging |
Power Specification | Power Strip: 100-120V ~ 50/60Hz, 12A |
Security | Door Lock cover: 2 points mechanism with key lock |
function.
Fixed Shelf| Yes
Shelf Support Weight(ea.)| 38.1 kg (84lbs)
Adapter Shelves(ea.)| 6.35 kg (14lbs)
Working Temperature| 0˚~30˚C
Working RH%| 10%~90%
Storage Temperature| -40˚C~60˚C
Storage RH%| 5%~95%
Warranty
| 10 years station and tray
5 years electrical components
Station Dimensions (W x D x H)
| Unfolded
527(W) ×453.4 (D) × 444.7 (H)mm
20.75”(W)×17.85”(D)×17.5” (H)
Folded
527(W) ×453.4 (D) × 123 (H)mm
20.75”(W)×17.85”(D)×4.84” (H)
Slot Dimensions (W x D x H)| 30 (W)×425.8(D)×311.3(H) mm
1.18″(W)×17.76″(D)×12.26″(H)
Weight without Devices| 20 kg (44.09 lbs) ± 3 kg(6.61 lbs)
[Note]
- Supported Devices: please check actual device size, including power cable for compatibility with device compartment size. If in doubt please contact AVer for confirmation.
- Specifications are subject to change without prior notice.
Service and Warranty
All of our products come with a quality and safety assurance.
For customers located in North America, please visit the AVer USA support site
for comprehensive RMA, Warranty, and Service information:
https://averusa.com/classroom-technology/support/
For customers located outside North America, please visit AVer Global support
site: https://www.aver.com/
Appendix – Earthing
[Caution]
High touch current, Connect to earth before connecting to supply.
(Yellow/Green wire min. 14AWG)
[Note]
Installation of the protective earthing connection of the socket-outlet by a
skilled person.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>