RAB LIGHTING LED Cylinder Light Instructions

August 23, 2024
RAB Lighting

RAB LIGHTING LED Cylinder Light

Specifications:

  • Model Numbers: CD34FA3W-10-508-XX, CD34FA4W-20-508-XX, CD34FA6W-36-708-XX, CD34FA4SP-20-509-XX, CD34FA6SP-30-709-XX
  • Mounting Options: Wall Mount, Ceiling Mount LED Lighting
  • Energy-efficient

Product Usage Instructions

Wall Mount Installation:

  1. Remove (2) M4*8 Screws on two sides and separate Junction Box Adaptor Plate from the Fixture.
  2. Stick Gasket and fix Junction Box Adaptor Plate with (3) 8#-32×1 Screws on the wall. Ensure the UP direction is installed upside down.
  3. Connect the wires with (3) P3 Wire Nuts according to the Wiring Diagram.
  4. Mount back the Fixture on Junction Box Adaptor Plate with (2) M4*8 Screws tightly.

Ceiling Mount Installation:

  1. Unscrew the Junction Box Adaptor Plate and Canopy off the Fixture counterclockwise.
  2. Fix Junction Box Adaptor Plate into junction box with (3) 8#-32×1 Screws.
  3. Unscrew Plug A to adjust the output distribution selectable and CCT. When set, screw back Plug A.
  4. Unscrew Plug B to turn ON/OFF Photocell. When set, screw back Plug B.
  5. Connect the Tether Cable on the Canopy to the Tether Slot in the Junction Box Adaptor Plate.

RAB Lighting is committed to creating high-quality, affordable, well-designed, and energy-efficient LED lighting and controls that make it easy for electricians to install and end users to save energy. We’d love to hear your comments.

Please call the Marketing Department at 888-RAB-1000 or email: marketing@rablighting.com

Wall Mount

Ceiling Mount

IMPORTANT
READ CAREFULLY BEFORE INSTALLING THE FIXTURE. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE. RAB fixtures must be wired in accordance with the National Electrical Code and all applicable local codes. Proper grounding is required for safety. THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE BY A PERSON FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED.

WARNING:

  • Make certain power is OFF before installing or maintaining the fixture. No user-serviceable parts inside.
  • The fixture is suitable for wet locations.
  • Fixture must be mounted a minimum of 4 feet above ground level.

WALL MOUNT WHAT’S IN THE BOX

Important : For wet locations, Gasket must be used.

WALL MOUNT INSTALLATION

  1. Remove (2) M4*8 Screws on two sides and separate Junction Box Adaptor Plate from the Fixture. (Fig. 1)
  2. Stick Gasket and fix Junction Box Adaptor Plate with (3) 8#-32×1 Screws on the wall. (Fig. 2) ( Warning : The mark ”UP” direction must be installed upside.)
  3. Connect the wires with (3) P3 Wire Nuts according to the Wiring Diagram. (Fig. 3) (Fig. 31)
  4. Mount back the Fixture on Junction Box Adaptor Plate with (2) M4*8 Screws tightly. (Fig. 4)
  5. Unscrew Plug A to adjust the output distribution selectable and CCT (Default: Output distribution selectable-Full; CCT-3000K). When set down, screw back Plug A. (Fig. 5)
  6. Unscrew Plug B to turn ON/OFF Photocell (Default: Photocell- OFF). When set down, screw back Plug B. (Fig. 6)

CEILING MOUNT WHAT’S IN THE BOX

Important : For wet locations, caulk the seam between the fixture and ceiling.

CEILING MOUNT INSTALLATION

  1. Unscrew the Junction Box Adaptor Plate and Canopy off the Fixture counterclockwise. Remove Screw A from Canopy and separate Junction Box Adaptor Plate and Canopy. (Fig. 7)
  2. Fix Junction Box Adaptor Plate into junction box with (3) 8#-32×1 Screws. (Fig. 8)
  3. Unscrew˜Plug A˜to adjust the CCT (Default-3000K). When set down, screw back˜Plug A. (Fig. 9)
  4. Fix˜Canopy˜back to the Fixture. (Fig. 10)
  5. Connect Tether Cable on Canopy to Tether Slot in Junction Box Adaptor Plate. (Fig. 11)
  6. Connect the wires with (3) P3 Wire Nuts and (2) P2 Wire Nuts according to Wiring Diagram. (2) P2 Wire Nuts are for dimming wires. (Fig. 12) (Fig. 32)
  7. Align the holes on˜Canopy˜and˜Junction Box Adaptor Plate˜to fix˜Canopy˜back to˜Junction Box Adaptor Plate˜counterclockwise and tighten them with˜Screw A. (Fig. 13)

PENDANT CORD/ PENDANT POLE MOUNT

Important : For wet locations, caulk the seam between the fixture and ceiling.

  1. Unscrew Junction Box Adaptor Plate and Canopy off the Fixture counterclockwise. Remove Screw A from Canopy and separate Junction Box Adaptor Plate and Canopy. (Fig. 14)
  2. Pass˜Thread Lock˜through the˜Cord˜and tighten it securely.
  3. Unscrew˜Plug A˜to adjust the CCT (Default-3000K). When set down, screw back˜Plug A. (Fig. 16)
  4. Fix Junction Box Adaptor Plate into junction box with (3) 8#-32×1 Screws. (Fig. 17)
  5. Connect Tether Cable on Canopy to Tether Slot in Junction Box Adaptor Plate. (Fig. 18)
  6. Pass Cord Clamp through the Cord. Adjust˜Cord˜length according to requirement and tighten˜Cord Clamp with Screw C. A minimum of 6 inches will be needed for connecting to the power supply wires located in the junction box.
  7. Connect the wires with (3) P3 Wire Nuts and (2) P2 Wire Nuts according to Wiring Diagram. (2) P2 Wire Nuts are for dimming wires.(Fig. 20) (Fig. 32)
  8. Fix˜Canopy˜back to˜Junction Box Adaptor Plate˜and tighten them with˜Screw A. (Fig. 21)

CORD-TO-POLE CONVERSION

Note : Please refer to RAB CD34STEM-X. Poles are sold separately.

  1. Remove Cord Clamp˜with˜Screw C, Canopy, Tether Cable˜with˜ Screw B, Junction Box Adaptor Plate˜with˜Screw A. Discard Thread Lock. (Fig. 22)
  2. Insert˜Cord˜through˜Pole section. Screw˜Pole˜section to˜Fixture. Add up to 3 more˜Pole˜sections as required. Each pole section is 12” long. A minimum of 6 inches will be needed for connecting to the power supply wires located in the junction box. (Fig. 23)
  3. Thread˜Cord˜onto˜Hollow Stud˜and tighten them securely. (Fig. 24)
  4. Unscrew˜Plug A˜to adjust the CCT (Default-3000K). When set down, screw back˜Plug A. (Fig. 25)
  5. Unscrew M10 Outside Hexagonal Hollow Nut to Canopy and fix Canopy to Pole through M10 Outside Hexagonal Hollow Nut.(Fig. 26)
  6. Fix Junction Box Adaptor Plate into junction box with (3) 8#-32×1 Screws. (Fig. 27)
  7. Connect Tether Cable on Canopy to Tether Slot in Junction Box Adaptor Plate. (Fig. 28)
  8. Connect the wires with (3) P3 Wire Nuts and (2) P2 Wire Nuts according to Wiring Diagram. (2) P2 Wire Nuts are for dimming wires. (Fig. 29) (Fig. 32)
  9. Fix˜Canopy˜back to˜Junction Box Adaptor Plate˜and tighten them with˜Screw A. (Fig. 30)

Note : ˜ These instructions do not cover all details or variations in equipment nor do they provide for every possible situation during installation, operation or maintenance.

WIRING DIAGRAM

CLEANING & MAINTENANCE

CAUTION : Be sure fixture temperature is cool enough to touch. Do not clean or maintain while fixture is energized.

  1. Do not open fixture to clean the LED. Do not touch the LED.
  2. Do not touch reflector.
  3. Do not clean any fixture surface with wood-base cleaning material such as paper towels or tissues.

TROUBLESHOOTING

  1. Check that the line voltage at the fixture is correct. Refer to wiring directions.
  2. Is the fixture grounded properly?

DIMENSIONAL DRAWINGS

  • Easy Answers
    rablighting.com
    Visit our website for product info

  • Tech Help Line
    Call our experts: 888 722-1000

  • e-mail
    Answered promptly – sales@rablighting.com

  • Free Lighting Layouts
    Answered online or by request

RAB WARRANTY: RAB’s warranty is subject to all terms and conditions found at rablighting.com/warranty.

FAQ

Q: What should I do for wet locations?
A: For wet locations, use a Gasket for wall mounts and caulk the seam between the fixture and ceiling for ceiling mounts.

Q: How do I adjust the Output Distribution and CCT?
A: Unscrew Plug A to adjust the output distribution selectable and CCT. Screw back Plug A when set.

Q: How do I turn ON/OFF the Photocell?
A: Unscrew Plug B to turn ON/OFF Photocell. Screw back Plug B when set.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

RAB Lighting User Manuals

Related Manuals