KSR LIGHTING KSRSF337 Multi Wattage Triple CCT Bulkhead Installation Guide
- June 3, 2024
- KSR LIGHTING
Table of Contents
KSR LIGHTING KSRSF337 Multi Wattage Triple CCT Bulkhead
These fittings are Class II and do not need an Earth, but Earth provision is provided.
Important Information
It is recommended that these luminaires are installed and fitted by a
qualified electrician ensuring the installation complies with current IEE
wiring regulations & local building control. These products are designed for
connection to a 240V~50Hz supply.
Any faulty, broken or damaged luminaires should be replaced immediately.
KSR will not accept responsibility for any claims arising from a poor
installation.
Please Note: The limited warranty shall be deemed null and void in the
following circumstances: Failure by the installer, end user or any third party
to exercise caution to protect any covered product or part from outside
damage, adverse temperature (normal operating ambient temperature 0°C –
+30°C), humidity conditions, fluctuations in the electrical system or physical
abuse as well as failure related to workmanship in the installation of the
products or parts.
Important User Advice
Always switch off mains supply before servicing.
Do not use Megger or similar high voltage instruments. Due to the fact this
luminaire contains electronic components that maybe damaged by high test
voltages, they must be disconnected from the circuit before testing. To
prevent damage to the driver, do not mix with conventional magnetic ballasts
on the same electrical circuit.
At the end of life the luminaire is classed as WEEE under directive 2014/30/EU
and should be disposed of in accordance with local legislation.
Installation Procedure
- Isolate mains supply before installation.
- Unscrew and retain the four screws and remove the diffuser.
- Loosen the single LED tray screw as indicated and lift the hinged tray to gain access to the wiring terminals. Pass intended supply wires through grommet.
- Ensure the fixing surface is flat and even.
- Fix base to the wall, ceiling or besa box using adequate fixings with regard to the type of surface.
- Ensure incoming cables are protected.
- Terminate wiring as per, please note an Earth terminal is only supplied to aid the continuation of the Earth circuit.
- Please ensure battery is connected, this battery compartment can be accessed as shown overleaf.
- Select LED colour and wattage required using the switches on the LED driver Note: Never change the LED colour or wattage with the luminaire powered on as this can damage the luminaire.
- To set Photocell adjust the Lux level required via the adjuster (anti-clockwise = lowest, clockwise = highest) and to test simply cover photocell when powered on in daylight and wait for the luminaire to Light up.
- Proceed to Re-secure the LED tray.
- Make sure the seal is in place in the diffuser and undamaged.
- Replace the diffuser re-secure using the four retained screws.
- Turn on the mains supply and test luminaire. If using an optional rim clip the rim over the fitting.
This fitting requires a 24 Hour initial charge period prior to any emergency
testing, please see overleaf for testing routine, write on the battery label
in permanent ink the date of commissioning. All results must be recorded and
left with the end user.
The battery has a design life of at least 4 years but should be replaced if
the duration of operation is less than 3 hours after a 24hr charge time with
no interrupted supply.
Lamp Details
- Lamp: LED
- Wattage: 10W, 14W, 20W
- Colour: 3000K, 4000K and 6000K
- CCT CRI: Ra>84
CCT
| Lumen output
---|---
3000K| 4000K| 6000K
10W| 1145lm| 1261lm| 1212lm
14W| 1457lm| 1658lm| 1559lm
20W| 1819lm| 2126lm| 1947lm
Emergency Range Routine Inspection/Test
All tests must be undertaken at times of least risk and in accordance with
EN 50172:2004 as indicated below:
Daily:
LED charge indicators shall be visually inspected for correct operation.
Monthly:
(in addition to the daily check) If automatic testing devices are used, the
results of the short duration tests shall be recorded. Test shall be carried
out as follows:
- Switch the luminaire over to emergency mode to operate from the batteries by simulating a failure of supply to the emergency circuit for a period sufficient to ensure correct luminaire operation.
Note: The period of simulation failure should be sufficient for the purpose of this clause whilst minimizing damage to the system components e.g lamps. During this period, all luminaires shall be checked to ensure that they are present, clean and functioning correctly. At the end of this test period, the unswitched should be restored and any indicator lamp or device should be checked to ensure that is showing that the supply restored.
Annually:
If automatic testing devices are used, the results of the short duration tests
shall be recorded. For all other systems the monthly inspection shall be
carried out and the following additional tests made:
- Each luminaire shall be tested monthly as above but for its full duration in accordance with the manufacturer’s information.
- The unswitched supply for the luminaire should be restored and any charge indicator lamp or device should be checked to ensure that it shows the unswitched supply has been restored. The charging arrangements should be checked for proper functioning.
- The date of the test and its results shall be recorded in the system logbook.
A copy of this report must accompany any emergency luminaire returned to KSR Lighting for any reason.
Battery Maintenance (Removal and Replacement Procedure)
For battery servicing showing how to access the battery compartment, please
ensure when changing the battery that the circuit is isolated and that the
battery replacement is compatible with the product description.To access the battery compartment simply remove the locking
screw with a screwdriver and proceed to remove cover by releasing the holding
tab located to the the left side of the compartment.
When cover is removed disconnect old battery and recycle in accordance with
WEEE under directive 2014/30/EU, this should be disposed of in accordance with
local legislation.
Proceed to connect the new battery by clicking connectors back together and
replace battery back into battery housing
With battery in place replace cover onto compartment and fasten in place with
locking screw removed earlier Turn on the mains supply and test luminaire
Any deviation from the battery specification may result in damage to the
emergency circuit or failure to perform under emergency conditions.
Emergency Lighting Periodic Test Schedule
All emergency lighting should be installed and tested in accordance to EN5266-1:2011. This test schedule should remain onsite and be accessible to the relevant authorities on request.
Em No.| Luminaire Location| Luminaire Type| Start Time|
Duration (Mins)| *Pass/Fail| Comments/Actions
---|---|---|---|---|---|---
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
| | | | | |
Documents / Resources
| KSR
LIGHTING KSRSF337 Multi Wattage Triple CCT
Bulkhead
[pdf] Installation Guide
KSRSF337 Multi Wattage Triple CCT Bulkhead, KSRSF337, KSRSF337 Triple CCT
Bulkhead, Multi Wattage Triple CCT Bulkhead, Triple CCT Bulkhead, Multi
Wattage Triple Bulkhead, Bulkhead, KSRSF337 Bulkhead
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>