e-peas AEM30330 Vibration Energy Harvesting User Guide

June 6, 2024
e-peas

e-peas AEM30330 Vibration Energy Harvesting

FEATURES

Connectors

  •  1 screw connector for the Photovoltaic Cell + 2 screw connector for AC input signal
  •  1 screw connector + 1 JST connector for the Storage Element
  •  1 screw connector for LOAD
  •  1 screw connector for RZMPP

Configuration

  •  3 jumpers R_MPP[x] to define the MPP ratio linked to the harvester technology
  •  2 jumper T_MPP[x] to define the MPP timing
  •  4 jumpers STO_CFG[x] to define the storage element protection levels
  •  3 jumper LOAD_CFG[x] to define the LOAD voltage
  •  4 resistors footprint related to the custom mode (STO_CFG[3:0]=LHHH)
  •  1 jumper to set the dual cell supercapacitor BAL feature
  •  5 jumpers to enable the different mode
  •  1 jumper to select the rectifier

Size

  •  79mm x 49mm
  •  4 x M2.5 Mounting holes

SUPPORT PCB

BOM around the AEM30330

e-peas AEM30330 Vibration Energy Harvesting 3

Footprint & Symbol: Informations available on the datasheet

STEP 1 : AEM30330 Configuration

e-peas AEM30330 Vibration Energy Harvesting 2

  • STEP 2 : Connect the Storage Element
  • STEP 3 : Connect the Load on LOAD
  • STEP 4 : Connect the Photovoltaic Cell

Internal Boost efficiency Vs. input voltage in Low Power mode:

e-peas AEM30330 Vibration Energy Harvesting 4

Internal Boost efficiency Vs. input voltage in High Power mode:

e-peas AEM30330 Vibration Energy Harvesting 5

STEP 5: Check the Status

e-peas AEM30330 Vibration Energy Harvesting 6

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals