e-peas AEM30330 Vibration Energy Harvesting User Guide
- June 6, 2024
- e-peas
Table of Contents
e-peas AEM30330 Vibration Energy Harvesting
FEATURES
Connectors
- 1 screw connector for the Photovoltaic Cell + 2 screw connector for AC input signal
- 1 screw connector + 1 JST connector for the Storage Element
- 1 screw connector for LOAD
- 1 screw connector for RZMPP
Configuration
- 3 jumpers R_MPP[x] to define the MPP ratio linked to the harvester technology
- 2 jumper T_MPP[x] to define the MPP timing
- 4 jumpers STO_CFG[x] to define the storage element protection levels
- 3 jumper LOAD_CFG[x] to define the LOAD voltage
- 4 resistors footprint related to the custom mode (STO_CFG[3:0]=LHHH)
- 1 jumper to set the dual cell supercapacitor BAL feature
- 5 jumpers to enable the different mode
- 1 jumper to select the rectifier
Size
- 79mm x 49mm
- 4 x M2.5 Mounting holes
SUPPORT PCB
BOM around the AEM30330
Footprint & Symbol: Informations available on the datasheet
STEP 1 : AEM30330 Configuration
- STEP 2 : Connect the Storage Element
- STEP 3 : Connect the Load on LOAD
- STEP 4 : Connect the Photovoltaic Cell
Internal Boost efficiency Vs. input voltage in Low Power mode:
Internal Boost efficiency Vs. input voltage in High Power mode:
STEP 5: Check the Status
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>