e-peas AEM10941 EVK Evaluation Kit User Guide

September 29, 2024
e-peas

e-peas AEM10941 EVK Evaluation Kit

FEATURES

Connectors

  • 1 screw connector for the photovoltaic cell
  • 1 screw connector for the storage element
  • 1 screw connector for primary battery
  • 1 screw connector for HVOUT LDO output (80mA @ 1.8 – 4.1 V)
  • 1 screw connector for LVOUT LDO output (20mA @ 1.2 or 1.8 V)

Configuration

  • 2 headers SELMPP[1:0] to define the MPPT ratio linked to the harvester technology
  • 3 headers CFG[2:0] to define the storage element protection levels
  • 6 resistors footprint related to the custom mode (CFG[2:0] = LLL)
  • 2 headers to enable/disable the internal LDOs
  • 2 headers to disable the primary battery feature
  • 1 headers to set the dual cell supercapacitor BAL feature

Size

  • 76mm x 49mm
  • 4 x M2.5 Mounting holes

SUPPORT PCB

BOM around the AEM10941

Footprint & Symbol: Available in the datasheet

STEP 2: Connect the storage element (and the primary battery)
STEP 3 : Connect the load(s) to HVOUT / LVOUT
STEP 4: Connect the harvester

Internal Boost efficiency Vs. input voltage (LBOOST = 22 μH)

STEP 5: Check the status

Status pins

STATUS[2]| 19| Logic output. Asserted when the AEM performs a MPP evaluation.
STATUS[1]| 20| Logic output. Asserted during 600 ms if the battery voltage falls below Vovdis or asserted as long as the AEM is taking energy from the primary battery.
STATUS[0]| 21| Logic output. Asserted when the LDOs can be enabled.

www.e-peas.com

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals