e-peas AEM00941 Evaluation Board User Guide

June 20, 2024
e-peas

AEM00941 Evaluation Board

AEM00941

Quick Start Guide EVK

FEATURES

Connectors

  • 1 screw connector for the DC source

  • 2 screw connectors for AC sources
    1 screw connector + 1 JST connector for the storage element

  • 1 screw connector for primary battery

  • 1 screw connector for HVOUT LDO output (80mA @ 1.8 – 4.1 V)

  • 1 screw connector for LVOUT LDO output (20mA @ 1.2 or 1.8 V)

Configuration

  • 2 headers for SRC_LVL_RANGE[1:0] to define the input voltage regulation of the AEM
  • 2 resistors or 1 potentiometer to set the source voltage regulation
  • 3 headers CFG[2:0] to define the storage element protection levels
  • 6 resistor footprints to configure the custom mode (CFG[000])
  • 2 headers to enable/disable the internal LDOs
  • 2 headers to disable the primary battery feature
  • 1 header to set the dual cell supercapacitor BAL feature

Size

  • 79mm x 49mm
  • 4 x M2.5 mounting holes

SUPPORT PCB

BOM around the AEM00941

e-peas-AEM00941-Evaluation-Board-1

Footprint & Symbol: Available in the datasheet

  1. STEP 1: AEM00941 configuration

    • e-peas-AEM00941-Evaluation-Board-2Source level: Use the potentiometer or resistors R9 and R10 in combination of the source range functionality to define the harvesting voltage.
    • RS = R9 + R10
    • 100 kΩ ≤ RS ≤ 500 kΩ
    • R9 = * RS) / 2.2 V
    • R10 = RS – R9
  2. STEP 2: Connect the storage element (and the primary battery)

  3. STEP 3: Connect the Load(s) to HVOUT / LVOUT

  4. STEP 4: Connect the Harvester
    Internal Boost efficiency Vs. input voltage 100µH LBOOST:
    e-peas-AEM00941-Evaluation-Board- \(3\)

  5. STEP 5: Check the Status

e-peas-AEM00941-Evaluation-Board- \(1\)

www.e-peas.com

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

e-peas User Manuals

Related Manuals