REYEE RG-RAP1200 Dual Band Wall Plate Access Point Installation Guide

June 3, 2024
REYEE

REYEE RG-RAP1200 Dual Band Wall Plate Access Point

Packing List

Item Name Quantity Unit
1 RG-RAP1200(P)Host 1 Set
2 This Quick Installation Guide 1 Copy
3 Warranty card 1 Copy
4 Mounting Screw 2 Piece

Appearance and Interface

Top View

Note:

  1. Reset button
  2. LAN/PoE-Out port Rear View
  3. LAN ports

Rear View

Note:

  • WAN/PoE Port

Note:

  1. When powering the AP through PoE, connect one end of the Ethernet cable to the WAN/PoE port and the other end to a
    PoE-capable device.

  2. With IEEE 802.3at PoE+ input, the PoE-OUT port supports up to 15.4W output power to the external terminals complying with IEEE 802.3af.

LED Indicator and Button

Product Installation

Loosen screws on the 86-type faceplate that is mounted on the wall.

Connect the Ethernet cable to the WAN/PoE port.

Align screw holes on both sides of the device over those on the faceplate. And then tighten screws with a screwdriver.

lnstall the plate cover in the way as shown in the figure.

Note:

You need to buy the mounting bracket, if you mount the AP on a single-gang wall junction box compliant with US standards.

Network Configuration

Method 1 (Recommended) Scan the QR-code on the manual or device to download Ruijie Cloud App. Follow the guide on App to set up and configure the network.

Method 2
Connect to the device SSID (@Ruijie-mxxxx when there are multiple devices and @Ruijie-sxxxx default when there is only one device), or connect the cable with LAN port and visit http:/110.44.77.253
(default password:admin). It is recommend to configure the IP address of PC as 10.44.77.250.
Note:
This equipment is restricted to indoor operation in 5.15-5.25GHz for Hong Kong.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals