VYNCO VM17 17 Way Distribution Board Instruction Manual

June 5, 2024
VYNCO

VYNCO VM17 17 Way Distribution Board Instruction Manual
Distribution Board

SAFETY

This product complies in full with AS/NZS 61439.3.
Distribution Board
This product should be installed by a suitably qualified person in accordance with Australian and New Zealand wiring rules.

INSTALLATION PROCEDURE

This product is designed to be installed inside a wall cavity only (flush mounting). Do not surface mount.

For surface mounting use VM17SK surface mount enclosure in conjunction with this board.

The metal wall enclosure must be earthed. Fold out tags (x4) on the side walls of the enclosure can be folded out to set the correct height onto the studs. Door hinge pins are easily removable and the door can be reversed so that it swings either left or right.
This product is designed to be used with NewZealand and Australia’s MEN system.

DO NOT install a link between the neutral bars and earth bar on circuits dedicated to RCDs. Please ensure circuits and protective devices are adequately identified during installation.

Specification

Rated Operational Voltage 415V AC maximum, 50Hz
Maximum Current 100A
Rated Insulation Voltage 1000V
Short Circuit Withstand 10kA

Dimensions

Cover Assembly 323 x 402 x 35mm
Base (cut out size) 277 x 355 x 93mm

VYNCO INDUSTRIES (NZ) LIMITED
CHRISTCHURCH
388 Tuam Street, Phillipstown, Christchurch, 8011
PO Box 9022, Tower Junction, Christchurch 8149
New Zealand
P +64 3 379 9283 F +64 3 379 6838
E sales@vynco.co.nz
VYNCO.CO.NZ

AUCKLAND
9 Levene Place, Mount Wellington
PO Box 12 249, Penrose, Auckland 1061
New Zealand
P +64 9 525 6051 F +64 9 525 5799

EARTH AND NEUTRAL BUSBAR LAYOUT

| Material| Number of Bars| Double Screw Tunnels| Single Screw Tunnels
---|---|---|---|---
Earth Bar| Brass steel| 1| 3| 12
Neutral Bar| Brass steel| 1| 2| 8
RCD Neutral Bar| Brass steel| 3| 1| 3

REMOVING DOOR

STEP 1
Rotate top pin 90°.
REMOVING DOOR

STEP 2
Slide pin down to release door. There is no need to remove pin completely.
REMOVING DOOR

STEP 3
Lift and remove door
REMOVING DOOR

FITTING DIAGRAM

To fit into wall cavity, fold out tabs to set height of enclosure onto studs.
FITTING DIAGRAM

WARRANTY

This product is covered by a 1 Year Vynco Warranty proof of purchase is required. Please contact Vynco for details of returns procedure.
NOTE: This product contains NO user serviceable parts.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals