BLUE JAY BJ195PUI DC Panel Meter User Manual
- June 1, 2024
- BLUE JAY
Table of Contents
- BLUE JAY BJ195PUI DC Panel Meter
- Read me
- 1. – SUMMARIZE
- 2. – SPECIFICATIONS
- 3. INSTALLATION AND START-UP
- 4.- OPERATION MODE
- 5. SETUP PROCEDURE
- 6. COMMUNICATION INTERFACE
- 7.- SAFETY CONSIDERATIONS
- 8. MAINTENANCE
- 9. TECHNICAL SERVICE
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
BLUE JAY BJ195PUI DC Panel Meter
USER MANUAL
Version:1.11
Read me
When you use BJ195-X Series Digital Meter, be sure to carefully read this user manual, and be able to fully understand the implications, the correct guidance of operations in accordance with user manual, which will help you make better use BJ193 series Digital Meter, and help to solve the various problems at the scene.
1. Before the meter turning on the power supply, be sure that the power
supply within the provisions of the instrument;
2. When installation, the current input terminal must non-open, voltage input
terminals must Non-short circuit;
3. Communication terminal (RS485 or Ethernet) is strictly prohibited to
impose high pressure;
4. Be sure the instrument wiring consistent with the internal system
settings;
5. When communicating with the PC, instrument communication parameters must
be consistent with the PC.
- Please read carefully before using this user manual
- Please save this document
1. – SUMMARIZE
BJ195-X Series Digital Meter is used for power quality monitoring, factory automation and building automation.
These series can measure the power parameters in power grid:
Current, Voltage, RMS power load, Energy consumption.
It can replace many of a traditional analog measurement instruments, improve
system accuracy and reliability.
APPLICATIONS
- Measure all power parameters;
- Monitor and control, energy measurement and electrical fire;
- Replace the three-phase power meter, three phase electricity transmitter;
- Transformers, generators, capacitors and electric motors distributed detection;
- Medium and low pressure systems;
- SCADA, EMS, DCS integrators.
2. – SPECIFICATIONS
1. Reference standard
Basic electricity | GB/T13850-1998 (IEC688-1992) |
---|---|
Active power | GB/T17215-2002 (IEC61036:2000) |
Reactive power | GB/T17882-1999 (IEC61268:1995) |
2. Accuracy standards
Parameter | Accuracy |
---|---|
Voltage | 0.2%fs |
Current | 0.2%fs (depends on Shunt) |
Power | 0.5%fs |
Energy | 1.0%fs |
3. Input
- Voltage: Rated 300/ 600/ 1000V
- Current: Rated 75mVA (optional 50mV / 100mV or customized)
4. Load
Voltage: <0.5VA / phase (rated 300V)
Current: <0.5VA / phase (rated 5A)
5. Overload
Current: 1.2 times rated continuous; 10 seconds for 10 times the rated.
Voltage: 1.2 times the rated continuous; 10 seconds for 2 times.
6. Dielectric strength
IEC 688 / IEC 255-3 (1989)
2kV AC RMS 1 minute, between input / output / case / power supply.
7. EMC Test
| Standard| Test voltage
---|---|---
Electrostatic discharge immunity test:| IEC-61000-4-2 level 4| 8Kv
Electrical fast transient burst immunity test| IEC61000-4-4 level 3| Input
1kV; Power supply 2kV
Surge (Shock) immunity test| IEC61000-4-5 level 4| Common mode test voltage
4kV
8. Work environment
Temperature: -20°(~ +60°(
Humidity: RH 20%~95% (No condensation)
9. Protection
Panel: IP40
10. Storage conditions
Temperature: -25°C~+?0°C
Humidity: RH 20%~95%
11. Power supply
AC /DC 85-265V
Maximum power consumption 3W
3. INSTALLATION AND START-UP
The manual you hold in your hands contains information and warnings that the user should respect in order to guarantee a proper operation of all the instrument functions and keep its safety conditions. The instrument must not be powered and used until its definitive assembly on the cabinet’s door.
Whether the instrument is not used as manufacturer’s specifications, the
protection of the instrument can be damaged.
When any protection failure is suspected to exist (for example, it presents
external visible damages), the instrument must be immediately powered off. In
this case contact a qualified service representative.
3.1. Installation
Mounting
Instrument is to be mounted on panel. All connections keep inside the cabinet.
Note that with the instrument powered on, the terminals could be dangerous to touching and cover opening actions or elements removal may allow accessing dangerous parts. Therefore, the instrument must not be used until this is completely installed.
Notes:
Input signal: BJ195-X Series using a separate acquisition calculate for each
measurement channel, to ensure consistent in use, for different load forms,
it’s a variety of connection mode. Access wire shall be met 2.5 square mm.
A. Voltage input
Input voltage should not exceed the rated input voltage products 450V,
Otherwise, you should use external VT. Suggest 1A fuse be installed in the
voltage input side.
B. Current Input
Standard input current is 5A or 1A, if greater than 5A/1A should use external
CT.
When the CT is connected with other meters, make sure wiring methods be used
in series.
Warming: Forbid to install a CT on the live feeder wire with open secondary leads. This can be extremely dangerous!
Before remove the current input connection, must be sure to disconnect the primary circuit or shorted secondary circuit of CT.
C. Sequence of wire
Warming: Please make sure that the input voltage and current corresponding to
the same phase, sequence, and the same direction; Otherwise, the Values and
symbols will be wrong! (Power and Energy)
Always observe the physical orientation of CT (P1 – P2) when installing on the
feeder wire. Always pay attention to wiring polarity and phasing when
terminating the CT leads to the BJ195-X Series. S1 connect to Ix*, S2 connect
to Ix.
The input network configuration of instrument depends on the CT number of the
system: in the condition of 2 CT, select the three-phase, three-lines two
components;
in the condition of 3 CT, select the three-phase, four-lines three component
mode.
Instrument connection mode, set of the instrument (programming input network
NET) should be the same load wiring as measured wiring. Otherwise, the
measurement instrument will lead to incorrect voltage or power.
In three-phase 3 wire mode, measurement and shows the line voltage;
In three-phase 4 wire mode, measurement and shows phase voltage and line
voltage both.
D. Auxiliary power
BJ195-X Series with universal (AC / DC) power input, if not for a special
statement, we provide the 90-240AC/DC power interface for standard products,
please ensure that the auxiliary power can match with meter to prevent
unexpected damage.
A. Suggest install 1A fuse in the fire line side.
B. For the areas with poor power quality, suggest install lightning surge
suppressor and rapid burst suppressor to prevent lightning strikes.
3.2.- Connection terminal and drawing (details please see label on the
rear part)
Terminal description
11. Positive of Voltage phase input
14. Negative of Voltage input
Terminal description
4. Shunt negative terminal
5. Shunt positive terminal
3.3. Other terminals (optional function)
Note: This connection drawing is for reference only; the actual connecting terminal please refer to the label on the rear part.
4.- OPERATION MODE
The instrument has three line displays. Every led will be on according to the
parameter presently shown in screen.
When the 195-X is powered up, all the LED indicator will on, and meter start
self- test, after some seconds, the meter is ready for operation and shows one
of the available screens.
Parameters on display can be switched by pressing key on screen at any moment
When the key is pressed, the screen CURRENT values of each phase are now
showing.
In setting menu, pressing key can move the setting cursor to left; Pressing
can enter the number O – 9.
Pressing it can open the setting menu and return to previous menu. In setting menu for change number 0-9 (only for 48*48 size meter)
Pressing this key, you can exit it with saving any modification that you might have done, in menu operation press “Enter” key, and user can go to the next menu.
Note:
Press in normal standby status, and the meter will show different data in main
screen:
In the menu set mode, when changes the parameter and exit setting, the meter
will ask to “SAVE”, press exit without saving press save and exit.
5. SETUP PROCEDURE
The SETUP procedure of the BJ 195-X is performed by means of several SETUP options. Once into the SETUP, use the keyboard to select different options and enter required variables:
If meter have Ethernet port, that configuration under “Bus” menu will change to following:
Note:
The procedure above is for reference, not all series have the step 3 (communication preference), AO menu for D series have this function, bUS menu for K series, please contact the Technical Service.
6. COMMUNICATION INTERFACE
6.1. Connection for the RS485 BUS
The composition of the RS-485 cabling must be carried out with a meshed screen cable (minimum 3 wire), diameter of not less than 0.5mm2, with a maximum distance of 1,200 m between the BJ-19 … and the master unit. This Bus may connect a maximum of 32pcs BJ-19 ….
Notes:
- For communication with the master unit, user can choose RS-485 to RS-232 converter or RS485 to USB adapter to use.
- For expand the number of devices in the communication network, a signal repeater can be used.
- Full range of BJ-19 … meter RS485 PIN number is 58,59,60
- Due to product modifications or special requirements, the interface pin place may be change. For details, please refer to product label on the rear side
6.2.- MODBUS © Protocol
Modbus RTU Frame Format:
MODBUS FUNCTIONS:
Note: Float data follow IEEE754, float low bit first, high bit next. (CD AB) Only read parameter, can be read with “03” command
7.- SAFETY CONSIDERATIONS
All installation specification described at the previous chapters named:
INSTALLATION AND STARTUP, OPERATION MODE and SPECIFICATIONS.
Note that with the instrument powered on, the terminals could be dangerous to touching and cover opening actions or elements removal may allow accessing dangerous parts. This instrument is factory-shipped at proper operation condition.
8. MAINTENANCE
The 195-X does not require any special maintenance. No adjustment, maintenance
or repairing action should be done when the instrument open and powered on,
should those actions are essential, high-qualified operators must perform
them.
Before any adjustment, replacement, maintenance or repairing operation is
carried out, the instrument must be disconnected from any power supply source.
When any protection failure is suspected to exist, the instrument must be
immediately put out of service. The instrument’s design allows a quick
replacement in case of any failure.
9. TECHNICAL SERVICE
For any inquiry about the instrument performance or any failure, contact to Blue Jay’s technical service.
Blue Jay – After-sales service
E-mail: tech@cqbluejay.com
Tel:+0086-023-67628702
Email:tech@cqbluejay.com
www.cqbluejay.com
Add: 1802,Building 2,No.88,Jianxin East Road,Chongqing,400020,China
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>