BLUE JAY BJ194E-9SY Multi Function Power Meter User Manual
- June 1, 2024
- BLUE JAY
Table of Contents
- 1. – SUMMARIZE
- 2. – APPLICATIONS
- 3. – FEATURES
- 4.- INSTALLATION AND START-UP
- 5. SCREEN DISPLAY
- 6. – OPERATION MODE
- 7. – SETUP PROCEDURE
- 8. – SAFETY CONSIDERATIONS
- 9. – MAINTENANCE
- 10. – TECHNICAL SERVICE
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
BLUE JAY BJ194E-9SY Multi Function Power Meter User Manual
Tel: +0086-023-67628702 Email:tech@cqbluejay.com
Add: 1802,Building 2,No.88,Jianxin East Road,Chongqing,400020,China
www.cqbluejay.com
Read me
When you use BJ194E-9SY series Power Meter, be sure to carefully read this
user manual, and be able to fully understand the implications, the correct
guidance of operations in accordance with user manual, which will help you
make better use BJ194E-9SY series Power Meter, and help to solve the various
problems at the scene.
- Before the meter turning on the power supply, be sure that the power supply within the provisions of the instrument;
- When installation, the current input terminal must non-open, voltage input terminals must Non-short circuit;
- Communication terminal (RS232 or RS485) is strictly prohibited to impose high pressure;
- Be sure the instrument wiring consistent with the internal system settings;
- When communicating with the PC, instrument communication parameters must be consistent with the PC
- Please read carefully before using this user manual
- Please save this document
1. – SUMMARIZE
BJ194E-9SY Series Power Meter is used for power quality monitoring, factory automation and building automation.
It can measure all of the power parameters in power grid:
Current,
Voltage,
Frequency,
Active power,
Reactive power,
Apparent power,
Energy,
Power factor,
Also can transmit the parameter into 1 route analog outputs or 1 route pulse output. For transformers, generators, capacitor banks and motors of the distributed detection, automatic control system, on-line monitoring display.
It can replace the traditional analog or many digital measurement instruments (such as ammeter, voltmeter, power meter, power factor meter, frequency meter, etc.), greatly reduce system cost, convenient on-site wiring, improve system reliability. BJ194E-9SY Power Meter has serial port, can connection to PC; Uses Modbus to set programming and read the data.
Based on this power meters, can simply set up a monitoring system, that only use the IPC and central software.
2. – APPLICATIONS
♦ All power parameter measurement;
♦ Power factor measurement and control;
♦ Energy Measurement;
♦ Replace the three-phase power meter, three phase electricity transmitter;
♦ Transformers, generators, capacitors and electric motors distributed
detection;
♦ Medium and low pressure systems;
♦ SCADA, EMS, DCS integrators.
3. – FEATURES
3.1. – Electricity metering
By means of an internal microprocessor it simultaneously measures:
Notes: Phase-phase voltage is Uab, Ube, Uca, voltage data determined by the different wiring Available: x: Display and communications.
The 194E-9SY delivers the visualization of above listed parameters by means of LCD display. All the parameters can be simultaneously read in the screen.
OTHER FEATURES
– Low-size (96 x 96 mm), panel-mounting meter.
– True R.M.S. measuring system.
– Instantaneous, maximum and minimum values of each measured parameter.
– Energy measurement (indication through a lighting led)
– Have Analogue outputs, Standard output is 4~20 mA, 0~20mA, 0~SVDC (One of
the above)
– RS-485 or RS-232 type communication to a PC (optional)
3.2. – Specifications
1. – Reference standard:
Basic electricity: IEC 61557-12:2007
Active energy: IEC 62053-21 :2003
Reactive energy: IEC 62053-23:2003
2- Accuracy standards
3. – Input
Voltage: Rated 400V (optional 100V)
Current: Rated SA (optional 1A)
Frequency: 45-65Hz
4. -Load
Voltage: <O.SVA / phase (rated 220V)
Current: <O.SVA / phase (rated SA)
5. – Overload
Current: 1.2 times rated continuous; 10 seconds for 10 times the rated
Voltage: 1.2 times the rated continuous; 10 seconds for 800V
6. – Dielectric strength
IEC/EN 61010-1 :2010
2kV AC RMS 1 minute, between input / output/ case/ power supply
7. – EMC Test
8. – Work environment
Temperature: -20°C~ +60°C
Humidity: RH 20%~ 95% C No condensation )
9. – Protection
Panel: IP40
10. – Storage Conditions
Temperature: -25°C~ + 70°C
Humidity: RH 20%~ 95%
11. -Working Power
AC 80-265V, 45-65Hz, DC 80-380V
DC 20-60V (Optional)
Maximum power consumption 6W
12. – Dimensions
L x W x H =96mmx96mmx128mm
13. – Installation hole size
L x W = (91+0.8mm) x (91+0.8mm)
4.- INSTALLATION AND START-UP
The manual you hold in your hand contains information and warnings that the user should respect in order to guarantee a proper operation of all the instrument functions and keep its safety conditions. The instrument must not be powered on and used until its definitive assembly on the cabinet’s door.
If the instrument is not used as manufacturer’s specifications, the protection of the instrument will be damaged.
When any protection failure is suspected to exist (for example, it presents external visible damages),the instrument must be immediately powered off. In this case contact a qualified service representative.
4.1.- Installation
Mounting
Instrument is to be mounted on panel (cut-out 91+0.8 x 91+0.8 mm). All connections keep inside the cabinet.
Note that with the instrument powered on, the terminals could be dangerous to
touching and cover opening actions or elements removal may allow accessing
dangerous parts.
Therefore, the instrument must not be used until this is completely installed.
Notes:
Input signal: BJ194E using a separate acquisition calculate for each
measurement channel, to ensure consistent in use, for different load forms,
it’s a variety of connection mode.
A. Voltage input:
Input voltage should not exceed the rated input voltage products (1 00V or
400V), Otherwise, should use external CT, the input voltage to be installed in
the 1A fuse.
B. Current Input:
Standard input current is 5A, if greater than 5A should use external CT.
Even if you are using on the CT are connecting with other instruments, wiring
methods should be used in series. Before remove the current input connection,
must be sure to disconnect the primary circuit or shorted secondary circuit of
CT. Suggest using the terminal block, please not directly connect to CT, in
order to facilitate disassembly.
C. Please make sure that the input voltage and current corresponding to the same phase sequence, and the same direction; Otherwise, the Values and symbols will wrong!! (Power and Energy)
The input network configuration of instrument depends on the CT number of the
system:
in the condition of 2 CT, select the three-phase, three-lines two components;
in the condition of 3 CT, select the three-phase, four-lines three component
mode.
Instrument connection mode, set of the instrument (programming input network NET) should be the same load wiring as measured wiring. Otherwise, the measurement instrument will lead to incorrect voltage or power.
In three-phase three-wire mode, the measurement and shows the line voltage;
In three-phase four-wire mode, the measurement and shows the phase voltage.
Auxiliary power:
BJ194E Series Power Meter with universal (AC/ DC) power input, if not for a
special statement, we provide the 220VAC/DC or 11 0VAC/DC power interface for
standard products. Instruments limit work power supply: AC / DC (80-270V),
please ensure that the auxiliary power can match for BJ 194E series meter to
prevent damage to the product.
A. Suggest install 1 A fuse in the fire line side.
B. For the areas with poor power quality, suggest install lightning surge
suppressor and rapid burst suppressor to prevent lightning strikes.
4.2. – Connection terminal (see label on the rear part) Terminal
description
Lower connection terminal
Three-phase network.- 4 wires
4. Current A-phase – $1 input
5. Current A-phase – S2 input
6. Current 8-phase – $1 input
7. Current B-phase – S2 input
8. Current C-phase – S1 input
9. Current C-phase – S2 input
11. Voltage A-phase input
12. Voltage B-phase input
13. Voltage C-phase input
14. Neutral Voltage input
Three-phase network.- 3 wires
4. Current A-phase – $1 input
5. Current A-phase – $2 input
6. Current 8-phase – $1 input
7. Current B-phase – S2 input
8. Current C-phase – $1 input
9. Current C-phase – S2 input
11. Voltage A-phase input
12. Voltage B-phase input
13. Voltage C-phase input
14. Neutral Voltage input
4.3. – Connection Drawing for the BJ194E-9SY
a. – Three-phase network.- 4 wires (low voltage) :
b. – Three-phase network.- 3 wires (low voltage):
IMPORTANT REMARK!
If power= -0.01 is shown for any of the phases and voltage and current are not
zero for this phase, check out following points:
– Assure that A, B and C phases coincide in voltage and current.
– Correct polarity? Reverse the current transformer placed at this phase.
5. SCREEN DISPLAY
5.1. – Panel diagram
5.2. – Display Summary
6. – OPERATION MODE
When the 194E-9SY is powered up, all the character will on, and meter start self- test, after some seconds, the meter is ready for operation and shows one of the available screens.
7. – SETUP PROCEDURE
The SETUP procedure of the BJ194E-9SY is performed by means of several SETUP
options.
Once into the SETUP, use the keyboard to select different options and enter
required variables:
- Password enters;
- Choice of default initial screen;
- Input signal selection;
- Communication preferences.
7 .1. – Password enters
7.2. – System display settings
7 .2.1. – Choice of default initial screen
This option allows choice among fixed or rotary screen:
After password, you will see the meter show “Set” like this:
0. Rotary screen display:
Meter can show data as this cycle: Current; Voltage; Active power, Reactive
Power, Power factor; Frequency; Active Energy; Reactive Energy.
All 5 screens are successively shown at intervals of 5 s.
1-6 Fixed screen:
-
Three-phase current display:
Meter display always three-phase current data in main display. And positive active energy shows in the bottom display. -
Three-phase voltage display
Meter display always three-phase voltage data in main display. And positive reactive energy shows in the bottom display -
Power and negative active energy display:
Meter display always three-phase power data in main display. And negative active energy shows in the bottom display. -
Power factor and negative reactive energy:
Meter display always three-phase PF data in main display. And negative active energy shows in the bottom display. -
Apparent power display:
-
Reactive power and positive active energy display:
Meter display always three-phase reactive power data in main display.
And positive positive active energy shows in the bottom display
7 .2.2. – Clear energy counters
7.3. – Input signal selection
Press (Manu), return to level 1 menu.
In this section, user will set:
- Input net mode;
- Voltage measure range select;
- Current measure range select;
- Voltage transformation ratio;
- Current transformation ratio.
7 .3.1.- Choice the input net mode
N.3.4: Three-phase four-wire, wiring reference section 4.3 a.
N.3.3: Three-phase three-wire, wiring reference section 4.3 b.
Note: Select the wiring mode must match actual wiring, or the reading
data will go wrong.
7 .3.2.- Choice voltage measure range
400V: Maximum measured value is 400V
100V: Maximum measured value is 100V
Note: Select a different range will affect the accuracy of measurements,
if the accuracy is 0.5.
Select 100V range, means the minimum scale value is 0.5V (100 x 0.5%);
Select 400V range, means the minimum scale value is 2V (400 x 0.5%).
7.3.3.- Current measure range select
SA: Maximum measured value is 5A.
1A: Maximum measured value is 1A.
Note: Select a different range will affect the accuracy of measurements,
if the accuracy is 0.5.
Select 1A range, means the minimum scale value is 0.005A (1 x 0.5%);
Select 5A range, means the minimum scale value is 0.025A (5 x 0.5% ).
7.3.4- Voltage transformation ratio
Note: The input values represent the voltage transformer (primary side
voltage) / (secondary side voltage).
Secondary side voltage is 10OV or 4OOV; user set it at section 7.3.2
7 .3.5. – Current transformation ratio
Note: The input values represent the current transformer (primary side
voltage) / (secondary side current).
Secondary side current is 1A or 5A; user set it at section 7.3.3.
7 .4. – Communication Preferences
Press (Manu), return to level 1 menu.
In this section, user will set:
- Meter communication address;
- Baud rate;
- Communication format.
Note: Not all the meter have communication function, please make sure your purchase meter first, if no communication mode, you can skip this section.
7 .4.1. – Meter communication address setting
One or some BJ194 … meter can be connected to a P.C. With this system we can get all the parameters in one central point of reading. The BJ194 … , has a serial RS-485 or RS-232 type output (according to the model). If we connect more than one device to the same communication line (RS-485), we have to assign to each of them a different code or direction (from 1 to 247), since the P.C. needs the identification of every measuring point.
7.4.2.- Communication Baud rate setting
7 .4.3.- Choose communication format
7 .5. – Menu Structure
7.6. – Display Character instructions
8. – SAFETY CONSIDERATIONS
All installation specification described at the previous chapters named:
INSTALLATION AND STARTUP, INSTALLATION MODES and SPECIFICATIONS.
Note that with the instrument powered on, the terminals could be dangerous to touching and cover opening actions or elements removal may allow accessing dangerous parts. This instrument is factory-shipped at proper operation condition.
9. – MAINTENANCE
The 194E does not require any special maintenance. No adjustment, maintenance or repairing action should be done when the instrument open and powered on, should those actions are essential, high-qualified operators must perform them.
Before any adjustment, replacement, maintenance or repairing operation is carried out, the instrument must be disconnected from any power supply source.
When any protection failure is suspected to exist, the instrument must be immediately put out of service. The instrument’s design allows a quick replacement in case of any failure.
10. – TECHNICAL SERVICE
FAQ’s
-
The BJ-194E Power Meter, once cabled and connected is seen to give a correct voltage and current reading, but shows negative values for active power (generation).
This is an error with the cabling for the current transformer secondary; the direction of the transformer current has to be respected as shown in the connection diagram. The current transformers have a two face primary; the current must pass from P1 to P2 giving the result in secondary (S1 and S2) of 5 amps.
The error stems from:
a). The current transformers have been incorrectly installed. As a result it gives the direction of the current as passing from P2 to P1; to resolve this problem, the current transformer does not have to be dismantled and installed again, but the transformer secondary (S1 and S2) just has to be inverted.
b). The connection of the current secondary in the current transformers have been incorrectly connected; to resolve this problem just connect the S1 transformer secondary to the S1 on the meter and the S2 on the current transformer to the S2 on the meter -
The BJ-194E, once cabled and connected, is seen to give an incoherent Power factor and Cos
reading (-0.01 or similar).
This is again a current transformer and voltage phase connection error phase A, must correspond to the current transformer installed in phase A; phase B, must correspond to the current transformer installed in phase B; and phase C, must correspond to the current transformer installed in phase C.
This connection is clearly shown on the back of the analyzer. -
The BJ-194E is measuring in average voltage and is displaying the secondary voltage (for example 110 volts).
Ensure that the voltage Transformer ratio has been correctly set (see section on 7.3.4). -
The BJ-194E does not correctly display the current reading. It shows values varying between 0 to 5 amps of current.
Ensure that the Transformer ratio has been correctly set; once correctly set the current measurement shall be shown correctly (see section on 7.3.5).
For any inquiry about the instrument performance or whether any failure
happens, please contact
to Blue Jay’s technical service.
Blue Jay – After-sales service
E-mail : tech@cqbluejay.com
Tel: +0086-023-67628702
www.cqbluejay.com
Add: 1802,Building 2,No.88,Jianxin East Road,Chongqing,400020,China
Email:tech@cqbluejay.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>