BLUE JAY BJ193-X Series Panel Meter User Manual
- June 1, 2024
- BLUE JAY
Table of Contents
BJ193-X Series Panel Meter
User Manual BJ193 Series Panel Meter
Version:2.2
BJ193-X Series Panel Meter
Read me
When you use BJ193-X series Digital Meter, be sure to carefully read this user
manual, and be able to fully understand the implications, the correct guidance
of operations in accordance with user manual, which will help you make better
use BJ193 series Digital Meter, and help to solve the various problems at the
scene.
- Before the meter turning on the power supply, be sure that the power supply within the provisions of the instrument;
- When installation, the current input terminal must non-open, voltage input terminals must Non-short circuit;
- Communication terminal (RS232 or RS485) is strictly prohibited to impose high pressure;
- Be sure the instrument wiring consistent with the internal system settings;
- When communicating with the PC, instrument communication parameters must be consistent with the PC.
● Please read carefully before using this user manual
● Please save this document
SUMMARIZE
BJ193-X series Digital Meter is used for power quality monitoring, factory
automation and building automation.
These series can measure the power parameters in power grid:
Current,
Voltage,
Frequency,
Active power,| Reactive power,
Apparent power,
Power factor,
---|---
It can replace many of a traditional analog measurement instruments, improve system accuracy and reliability.
SPECIFICATIONS
-
Reference standard:
Basic electricity: GBfT13850-1998 (IEC688-1992)
Active power: GBfT17215-2002 (IEC61036:2000)
Reactive power: GBfT17882-1999 (IEC61268:1995) -
Accuracy standards
Parameter| Accuracy
---|---
Voltage
Current
Active Power
Reactive Power
Apparent power
Power Factor
Frequency| 0.5%fs
0.5%fs
0.5%fs
0.5%fs
0.5%fs
0.5%fs
0.05%rd -
Input
Voltage: Rated 100/ 220/ 380V
Current: Rated 5A (optional 1A)
Frequency: 45-65Hz
Notes: accept customized order -
Load
Voltage: <0.5VA I phase (rated 220V)
Current: <0.5VA I phase (rated 5A) -
Overload
Current: 1.2 times rated continuous; 1 O seconds for 1 O times the rated.
Voltage: 1.2 times the rated continuous; 1 O seconds for 800V. -
Dielectric strength
IEC 688 I IEC 255-3 (1989)
2kV AC RMS 1 minute, between input I output I case I power supply. -
EMC Test****
| standard| Test voltage
---|---|---
Electrostatic discharge immunity test:| IEC-61000-4-2
level 4| 8Kv
Electrical fast transient burst immunity test| IEC61000-4-4
level 3| Input 1kV; Power supply 2kV
Surge (Shock) immunity test| IEC61000-4-5level 4| common mode test voltage 4kV -
Work environment
Temperature: -20°C- +60°C
Humidity: RH 20%-95% ( No condensation) -
Protection
Panel: IP40 -
Storage Conditions
Temperature: -25°C-+ 70°C
Humidity: RH 20%-95% -
Power Supply
AC /DC 80-270V
Maximum power consumption 3W
INSTALLATION AND START-UP
The manual you hold in your hands contains information and warnings that the
user should respect in order to guarantee a proper operation of all the
instrument functions and keep its safety conditions. The instrument must not
be powered and used until its definitive assembly on the cabinet’s door.
Whether the instrument is not used as manufacturer’s specifications, the
protection of the instrument can be damaged.
When any protection failure is suspected to exist (for example, it presents
external visible damages),the instrument must be immediately powered off. In
this case contact a qualified service representative.
3.1.- Installation
Mounting
Instrument is to be mounted on panel. All connections keep inside the cabinet.
Note that with the instrument powered on, the terminals could be dangerous to
touching and cover opening actions or elements removal may allow accessing
dangerous parts.
Therefore, the instrument must not be used until this is completely installed.
Auxiliary power:
BJ193X Series Digital Meter with universal {AC I DC) power input, if not for a
special statement, we provide the 220VAC/DC or 11 OVAC/DC power interface for
standard products Instruments limit work power supply : AC I DC :80- 270V,
please ensure that the auxiliary power can match for BJ193-X series meter to
prevent damage to the product.
A. Suggest install 1A fuse in the fire line side.
B. For the areas with poor power quality, suggest install lightning surge
suppressor and rapid burst suppressor to prevent lightning strikes.
3.2.- Connection terminal and drawing (details please see label on the rear
part)
3.2.1.- Three phase 4 wire voltage
Terminal description
11. Voltage A-phase input
12. Voltage B-phase input
13. Voltage C-phase input
14. Neutral Voltage input
3.2.2.- Three phase 3 wire voltage
Terminal description
11. Voltage A-phase input
12. Voltage B-phase input
13. Voltage C-phase input
14. COM for B-phase input
3.2.3.- Single phase or DC voltage
Terminal description
11. Voltage phase input
14. Neutral Voltage input
3.2.4.- Three phase current
Terminal description
4. Current A-phase – S1 input
5. Current A-phase – S2 input
6. Current 8-phase – $1 input
7. Current B-phase – S2 input
8. Current C-phase – S1 input
9. Current C-phase – S2 input
3.2.5.- Single phase or DC current
Terminal description
4. CT secondary side – S1 input
5. CT secondary side – $2 input
3.2.5.- Other terminals (optional function)
AUX| | Analog output|
---|---|---|---
RS485 port| | Digital input
Digital output|
Note: This connection drawing is for reference only, the actual
connecting terminal please refer to the label on the rear part.
IMPORTANT REMARK!
If power= -0.01 is shown for any of the phases and voltage and current are not
zero for this phase, check out following points:
– Assure that A,B,C phases coincide in voltage and current.
– Correct polarity? Reverse the current transformer placed at this phase.
SCREEN DISPLAY
Note:
- Single phase meter only have one line LED screen
- 48*48 meter panel like following panel design. Without “right” button, detail operation please see chapter 5.
OPERATION MODE
The instrument has three line displays. Every led will be on according to the
parameter presently shown in screen.
When the 193-X is powered up, all the LED indicator will on, and meter start
self- test, after some seconds, the meter is ready for operation and shows one
of the available screens.
Parameters on display can be switched by pressing key on screen at any moment
When the key is pressed, the screen CURRENT values of each phase are now
showing.
In setting menu, pressing can move the setting cursor to left;
Pressing can enter the number O – 9.
Pressing it can open the setting menu and return to previous menu.
In setting menu for change number 0-9 (only for 48*48 size meter)
Pressing this key you can exit it with saving any modification that you might
have done, in menu operation press “Enter” key, and user can go to the next
menu.
Note:
Press in normal standby status, and the meter will show different data in main
screen:
In the menu set mode, when changes the parameter and exit setting, the meter
will ask to
“SAVE”, press exit without saving
press save and exit.
SETUP PROCEDURE
The SETUP procedure of the BJ193-X is performed by means of several SETUP
options.
Once into the SETUP, use the keyboard to select different options and enter
required variables:
- Password enter
- Input signal selection
- Communication preferences
Single phase menu:
Three phase menu:
Note:
The procedure above is for reference, not all series have the step 3
(communication preference), AO menu for D series have this function, bUS menu
for K series, please contact the Technical Service.
SAFETY CONSIDERATIONS
All installation specification described at the previous chapters named :
INSTALLATION AND STARTUP, OPERATION MODE and SPECIFICATIONS.
Note that with the instrument powered on, the terminals could be dangerous to
touching and cover opening actions or elements removal may allow accessing
dangerous parts. This instrument is factory-shipped at proper operation
condition.
MAINTENANCE
The 193-X does not require any special maintenance. No adjustment, maintenance
or repairing action should be done when the instrument open and powered on,
should those actions are essential, high-qualified operators must perform
them.
Before any adjustment, replacement, maintenance or repairing operation is
carried out, the instrument must be disconnected from any power supply source.
When any protection failure is suspected to exist, the instrument must be
immediately put our of service. The instrument’s design allows a quick
replacement in case of any failure.
TECHNICAL SERVICE
For any inquiry about the instrument performance or whether any failure happens, contact to Blue Jay’s technical service.
Blue Jay – After-sales service
E-mail : tech@cqbluejay.com
Tel: +0086-023-67628702
www.cqbluejay.com
Add: 1802,Building 2,No.88,Jianxin East
Road,Chongqing,400020,China
Email: tech@cqbluejay.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>