VEVOR 3 Step Handrails Outdoor Steps User Manual
- June 1, 2024
- VEVOR
Table of Contents
VEVOR 3 Step Handrails Outdoor Steps
Product Information
Specifications
- Part A: 2pcs
- Part B: 1pcs
- Part C: 3pcs
- Part D: 2pcs
- Part E: 1pcs
- Part F: 8pcs
- Part G: 8/8pcs
Product Usage Instructions
Step 1
- Please put all parts on the ground.
Step 2
- Put Part D into Part A.
- Put Part C into the holes of Part A. Pay attention to the direction of Part C as shown in the figure.
- Connect Part B and Part A with Part E.
- Connect Part C and Part A with Part E.
Step 3
- Avoid mistakes when processing the first and second steps, do not connect parts tightly.
Step 4
- For the cement floor, use an electric drill to drill a 12mm hole.
Step 5
- For the wood floor, place the handrail on suitable stairs.
Step 6
- Screw Part E by Part L.
- Mark hole sites on stairs tracing four holes of Part A.
- Leave the handrail alone and drill down according to the mark with a 12 MM driller.
- Align the handrail and holes.
- Knock nails part F into the ground with a hammer.
Step 7
- For the cement floor and marble floor, please use Part G. For the timber floor, please use Part F.
Step 8
- Follow additional steps as indicated in the manual for proper installation.
FAQ
- Q: Do I need any special tools for assembly?
- A: Yes, you will need an electric drill for cement floors and a 12mm driller for wood floors.
- Q: How should I connect the different parts securely?
- A: Follow the step-by-step instructions provided, and avoid tightening the connections until instructed to do so to prevent errors.
PARTS
Tips: Avoiding mistakes when processing the first and second steps, we suggest not connecting parts tightly.
INSTALLATION INSTRUCTIONS
Please put all parts on the ground
- Put Part # into Part# A
- Put Part#C into holes of Part A (Please pay attention to the direction of Part# as shown in the figure)
- Connect Part#B and Part#A ( two) with Part l# E
- Connect Part # and Part #A with Part# E
- Place the handrail on suitable stairs
- Screw Part by Part L
- Mark hole sites on stairs tracing four holes of Part A
- Leave the handrail alone and drill down according to the mark with a 12 MM driller
- Align the handrail and holes Knock nails (part F) into the ground with a hammer
- Cement floor and marble floor please use Part GTimber floor using Part
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>