Fittes 4×9 Flush Floor Vent Luxe Supply Installation Guide
- June 17, 2024
- Fittes
Table of Contents
Fittes 4×9 Flush Floor Vent Luxe Supply
Instruction For Use
-
Drop in base on subfloor. If required, fasten with wood screws.
*DO NOT use provided screws here.
-
Install surface material on top of Base so that it is completely flush.
-
Dry fit Body into Base.
-
With the resistance from the flange,adjust Body up and down until it is flush with the top of surface.
-
Once adjusted to prefered height,fasten the Body to the Base using provided screws through the four pilot holes in each corner
-
Backfill Tray with bonding material and place precut piece of surface material inside Tray.
-
Hold in place and flip Tray. Apply even pressure until surface material lies flat with the rim of Tray.Leave to cure.
-
Insert and slide Tray in place. Enjoy!
- Control Air Flow *
Slide to remove tray and adjust flange open and closed. For optimal air flow, push flanges past 90º.
Additional Support
support@fittes.com/www.fittes.com
Customer Support
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>