COPELAND 026-4144 Site Supervisor Controller User Guide
- June 15, 2024
- Copeland
Table of Contents
- COPELAND 026-4144 Site Supervisor Controller
- Product Information
- Product Usage Instructions
- FAQ
- Technical Specifications
- Ethernet Connection
- Logging Into the Site Supervisor
- How to Change the IP Address
- Setup Wizard
- Localization Screen
- System Values Screen
- Network Settings Screen
- Basic Navigation
- UL Ratings
- Housing Dimensions and Mounting
- Wiring Diagram
- Site Supervisor RS485 Wiring Guide Examples
- Site Supervisor and MultiFlex
- Site Supervisor and XR75 (120V models)
- Documents / Resources
COPELAND 026-4144 Site Supervisor Controller
Product Information
The Site Supervisor is a system that combines energy management with the ability to monitor various facility systems and provide alerts when there are issues that need attention. This system provides HVAC control, Refrigeration System Monitoring and Control, as well as Lighting Control.
In addition, the Site Supervisor can monitor and report energy consumption and take action to reduce the energy demand during peak periods. This can have a direct impact on utility bills by reducing total energy costs. The Site Supervisor ensures that the HVAC and lighting systems are on and off at the appropriate times. This ability to monitor store conditions can potentially minimize energy consumption.
Technical Specifications
- Operating Temperature
- Relative Humidity
- Enclosure Rating
- Dimensions
- 24 VAC
- 1 Can Bus
- 4 RS485 ports
- 3 Ethernet ports
- 2 USB ports
- MicroSD
- Analog Inputs
- Digital Inputs
- Relay Outputs
UL 94 V-0 L 7 3/16 x W 2 3/8 x H 4 5/16 (183 mm x 60 mm x 100mm)
Expansion Module Connections
- MODBUS Com Ports 1, 2, 3, and 4
- Ports 1, 1, 0
- 1, 2
- 1
- 8
- 4
- 4
Ethernet Connection
-
ETH1 is designed to be used for directly connecting to laptop, PC, or optional touchscreen with a CAT5 network cable.
-
The default IP for ETH1 is 192.168.1.250.
-
The optional Site Supervisor Display touchscreen default IP is 192.168.1.200 and will connect automatically to the Site Supervisor when plugged into ETH1. It is recommended that you do not change these defaults.
Site Supervisor ETH 1 Ports -
ETH0 should be reserved for the secure network connections:
store or corporate networks. Ask your network administrator for the correct network IP address for ETH0. -
ETH0 and ETH1 are physically separated for added security.
Directly connecting to ETH1 will not access the secure network connection on ETH0.
Site Supervisor ETH 0 Ports
Direct Connect Instructions – Connect your Laptop to Site Supervisor’s Ethernet Port ETH1:
- Under the Control Panel – Network and Sharing Center, select Change adapter settings.
- Select the Local Area Connection port being used.
- Select Properties.
Change Adapter Settings
- Highlight the section Internet Protocol Version 4 (TCP/IPv4) and click Properties:
- Click Use the following IP address: and enter the IP address 192.168.1.251 and the Subnet mask 255.255.255.0 of the PC being used on the Local Area Network or direct connection and click OK.
Product Usage Instructions
Logging Into the Site Supervisor
Launch a preferred Web browser: Google Chrome 105.0.5195 and later, Firefox 105.0 and later, MAC Safari 14.1.2 and later, iOS Safari 14.7 and later, Microsoft Edge 84.0.522 and later, and Chrome/ WebView 105.0.5195 and later are the supported browsers.
FAQ
Q: Where can I find the latest Supervisory Control user manual?
A: You can visit the Site Supervisor page on the Copeland website:
https://www.copeland.com/en-us/training-support/hvacrtraining/lumity-
supervisory-control-ss
to download or contact Copeland Electronics and Solutions Technical Support at
833-409-7505.
The Site Supervisor is a system that combines energy management with the
ability to monitor various facility systems and provide alerts when there are
issues that need attention. This system provides HVAC control, Refrigeration
System Monitoring and Control, as well as Lighting Control.
In addition, the Site Supervisor can monitor and report energy consumption and
take action to reduce the energy demand during peak periods. This can have a
direct impact on utility bills by reducing total energy costs. The Site
Supervisor ensures that the HVAC and lighting systems are on and off at the
appropriate times. This ability to monitor store conditions can potentially
minimize energy consumption.
For a copy of the latest Supervisory Control user manual (P/N 026-1803), visit the Site Supervisor page on the Copeland website: https://www.copeland.com/en- us/training-support/hvacr-training/lumity-supervisory-control-ss to download or contact Copeland Electronics and Solutions Technical Support at 833-409-7505.
Technical Specifications
- Operating Temperature -40°F to 149°F (-40°C to 65°C)
- Relative Humidity 20-85% RH non-condensing
- Enclosure Rating UL 94 V-0
- Dimensions L 7 3/16 x W 2 3/8” x H 4 5/16” (183 mm x 60 mm x 100mm)
- 24 VAC 20VA required ; 24VAC/20VA
- 1 Can Bus Expansion Module Connections
- 4 RS485 ports MODBUS Com Ports 1, 2, 3, and 4
- 3 Ethernet ports Ports 1, 1, 0
- 2 USB ports 1, 2
- MicroSD 1
- Analog Inputs 8
- Digital Inputs 4
- Relay Outputs 4
Ethernet Connection
-
ETH1 is designed to be used for directly connecting to laptop, PC, or optional touchscreen with a CAT5 network cable.
-
The default IP for ETH1 is 192.168.1.250.
-
The optional Site Supervisor Display touchscreen default IP is 192.168.1.200 and will connect automatically to the Site Supervisor when plugged into ETH1.
It is recommended that you do not change these defaults. -
ETH0 should be reserved for the secure network connections: store or corporate networks. Ask your network administrator for the correct network IP address for ETH0.
-
ETH0 and ETH1 are physically separated for added security. Directly connecting to ETH1 will not access the secure network connection on ETH0.
Direct Connect Instructions – Connect your Laptop to Site Supervisor’s Ethernet Port ETH1:
- Under the Control Panel – Network and Sharing Center, select Change adapter settings.
- Select the Local Area Connection port being used.
- Select Properties.
1. Highlight the section Internet Protocol Version 4 (TCP/IPv4) and click Properties:
2. Click Use the following IP address: and enter the IP address 192.168.1.251 and the Subnet mask 255.255.255.0 of the PC being used on the Local Area Network or direct connection and click OK.
Logging Into the Site Supervisor
- Launch a preferred Web browser: Google Chrome 105.0.5195 and later, Firefox 105.0 and later, MAC Safari 14.1.2 and later, iOS Safari 14.7 and later, Microsoft Edge 84.0.522 and later, and Chrome/WebView 105.0.5195 and later are the supported browsers.
- Enter the IP Address of the device.
- Enter your Username/Password (default user/pass) and click Login. Then update your password to the minimum complexity requirements and click Save.
Note that when directly connecting your laptop or PC to ETH1, enter the default IP into the browser address bar: ETH1 Default IP Address is 192.168.1.250.
How to Change the IP Address
Method 1: Direct Connect
- Select the Main Menu icon > Configure System > General System Properties > Network Settings:
- On the INTERNET (TCP/IP) section on the screen, enter the IP Address in the ETH 0 IP Address field.
Note that you can set up the Peer Group, Unit Number, Network Mask, and Default Gateway on this screen.
Method 2: USB Port
- Create a “network.txt” with your desired settings (Enter IP Address in the ETH 0 IP Address Field):
- Save to the root folder of a thumb drive. Insert the thumb drive into the USB port of E3.
- Power cycle the E3. The new IP Address will be saved.
Setup Wizard
Note that if setpoints have been pre-loaded in the unit, the Setup Wizard will
not auto-start after logging in.
If your unit has been received directly from the Copeland factory, the Setup
Wizard will open and take you through the following setup screens:
Localization Screen
Set the E3’s localization data such as language, date and time formats, and engineering units from the Localization screen.
-
Language : The default for the language selection is American English (United States). The system stores a setting for the preferred system language (internal language code). The default language is used when no user is currently logged into the E3 or when the currently active preferred language does not have a translation for a given label, prompt, or display text.
-
Date : The Date format can be set to either Day, Month, and full Year (D-M-YR) or Month-Day and full Year (M-D-YR) format. The day, month, and year values are separated by either a forward slash or a dash line depending on user selection.
The Date Format can be changed based on user preference and saved to user profiles. On initial E3 startup, the Date format defaults to the format of the language selected. For example, en-US will default to D-M-YR and all others will default to M-D-YR. -
Time : The Time format can be set to either a 12-hour (12-hr) format or 24-hour (24-hr) format. The hour, minute, and second values are separated by either a colon or a period depending on user selection.
The Time format can be changed based on user preference and saved to user profiles. On initial E3 startup, the Time format defaults to the format of the language selected.
Date and Time delimiters default to forward slashes and colons. -
Engineering Units :The default engineering units are based on the assigned units for the chosen preferred language. Users can choose or change their preferred set of engineering units and save them to their user profiles.The default engineering units are based on the International System of Units (SI System) format.
Set the system language type in the Language drop-down menu. Click the right arrow > to save and proceed to the System Values screen.
System Values Screen
From the System Values screen, name the unit by entering it in the Site Name field. The Confirmation window will slide open. Click OK. Then click the right arrow > to proceed to the Network Settings Screen.
Network Settings Screen
Configure the settings on the Internet TCP/IP screen such as host name, text, and email settings. If you have Internet access, enter the IP Subnet Mask and Default Gateway settings (see your IT Administrator). If connecting directly to a laptop, use the Default IP and leave the DHCP set to Disable. For text messaging, enable the SMS setting and use the SMTP address (see your IT Administrator). Click the arrow > to save and finish the Setup Wizard.
Basic Navigation
For every Site Supervisor screen, the Main Menu, Home, Back Arrow, Control Inventory, and Schedules/Events icons appear at the first row of top of the screen. A screen title also appears at the top left of the screen.
Basic Screen Parts and Elements
- Main Display – this is the main section of the screen, which contains and displays the content of the chosen selection such as reports, device information, configuration settings, and more.
- Menus and Submenus – these can be viewed on the Main Menu Panel. The Menus and Sub-menus are grouped into different categories. Each menu selection can have several sub-menus. When you click on a lowest sub-menu level, the screen of the chosen selection is displayed.
Note: When some screen information and contents are clicked, more or related information can be displayed or additional screens accessed. For more information about icon descriptions and buttons, refer to the latest Site Supervisor full manual P/N 026-1803.
UL Ratings
Type | Ratings | Terminal |
---|
Relay 1 (N.O. & N.C.)
| 5 A, 125/240 V CA, General Purpose, 100 000 cycles ; 4FLA/4LRA, 250VAC, Motor Load, 100 000 cycles ;| ****
J5-2, J5-3, J5-4 (Base Board)
Relay 2 (N.O. & N.C.)
| 5 A, 125/240 V CA,General Purpose, 100 000 cycles ; 4FLA/4LRA, 250VAC, Motor Load, 100 000 cycles ;| ****
J5-1, J5-2, J6-6 (Base Board)
Relay 3 (N.O. & N.C.)
| 5 A, 125/240 V CA,General Purpose, 100 000 cycles ; 4FLA/4LRA, 250VAC, Motor Load, 100 000 cycles ;| ****
J6-1, J6-4, J6-5 (Base Board)
Relay 4 (N.O. & N.C.)
| 5 A, 125/240VAC,General Purpose, 100 000 cycles ; 4FLA/4LRA, 250VAC, Motor Load, 100 000 cycles ;| ****
J6-1, J6-2, J6-3 (Base Board)
Housing Dimensions and Mounting
The Site Supervisor can be mounted to standard 35mm DIN Rail. Snap the orange tabs on the back of the unit to the down position to fasten. If not using the DIN Rail mounting option, fasten to the mounting surface using the openings in the mounting tabs. Pull the four orange mounting tabs out until they lock, which will expose the mounting holes.
Wiring Diagram
Site Supervisor RS485 Wiring Guide Examples
For more wiring information, refer to the latest Supervisor Control user manual (P/N 026-1803).
- The Site Supervisor IONet connections must be wired reverse polarity.
- For the Site Supervisor Serial IONet connections, connect the white wire to the negative terminal and the black wire to the positive terminal.
- For 8RO and MultiFlex RS485 IONet connections, connect the white wire to the positive terminal and the black wire to the negative terminal.
- Connect the shield wire to earth/chassis at the Site Supervisor end of the IONet network segment. DO NOT connect the shield wire to any connector on the Site Supervisor.
- For daisy-chain configurations, terminate devices at the beginning and the end of the network segment. All other devices in the network segment are not terminated (termination jumpers in the not-terminated position).
Site Supervisor and MultiFlex
- The Site Supervisor and XR75CX shares the same MODBUS network polarity. Do not reverse polarity.
- Connect the shield wire to earth/chassis at the Site Supervisor end of the MODBUS network segment. Do not connect the shield wire to any connector on the Site Supervisor or XR75CX.
- For daisy-chain configurations, terminate devices at the beginning and the end of the network segment. Set the dip switch position 1 and 2 to the ON position on the Site Supervisor. For XR75CX end of network, terminate with a 150-ohm resistor or 535-2711 termination block. All other devices in the network segment are not terminated.
Site Supervisor and XR75 (120V models)
For Technical Support:
Call: 833-409-7505
Email:
ColdChain.TechnicalServices@copeland.com
For more product information, scan the QR Code:
Documents / Resources
|
COPELAND 026-4144 Site Supervisor
Controller
[pdf] User Guide
026-4144, 026-4144 Site Supervisor Controller, Site Supervisor Controller,
Supervisor Controller, Controller
---|---
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>