LARK 83607 Hamlet Light Instruction Manual

June 13, 2024
LARK

LARK 83607 Hamlet Light Instruction Manual
LARK 83607 Hamlet Light

Mounting Instructions

  1. Find a clear area in which you can work.
  2. Unpack fixture and glass from carton.
  3. Carefully review instructions prior to assembly.

Stem Install

  1. Determine the desired height at which the pendent will be installed
  2. The fixture is supplied with assorted stem sizes. Determine what combination of stems are needed to achieve desired length
  3. Slip stems over wire and thread first stem onto top of pendent, longest stem first. Repeat process until all required stems are thread together.
DRAWING 1-Stem install

Installation

  1. Prepare mounting strap (B) for mounting by installing screws (A) in mounting plate (B) – see Drawing 2. Be sure the holes into which the screws are threaded match spacing of holes (C) in the canopy (4).
  2. Attach mounting plate (B) to junction box (J), using screws (G) NOT provided and slip supply wires through large center hole in mounting plate (B).
  3. Now adjust screws (A) so the screw will extend 3/16” past the face of the canopy, when canopy is flush against ceiling. after screws are adjusted tighten hex nut (H) to lock screws in place.
  4. Make electrical connections from supply wire to fixture lead wires. Refer to instruction sheet (IS 18) and follow all instructions to make all necessary wiring connections.
  5. Lift decorative ring (5) towards ceiling and hold over junction box (J)
  6. Hold fixture towards ceiling and slip mounting holes (C) in canopy (4) over screws (A)
  7. Secure canopy and decorative ring (5) by threading barrel knobs (D) onto screws (A).
  8. Lamp fixture with appropriate medium base bulb (2)
  9. Use knobs (1) to secure glass (3) to the main body of the fixture
DRAWING 2- Fixture mounting

Fixture mounting

SAFETY WARNING: READ WIRING AND GROUNDING INSTRUC-TIONS (I.S. 18) AND ANY ADDITIONAL DIRECTIONS. TURN POWER SUPPLY OFF DURING INSTALLATION. IF NEW WIRING IS REQUIRED, CONSULT A QUALIFIED ELECTRICIAN OR LOCAL AUTHORITIES FOR CODE REQUIREMENTS.

DRAWING 3-Shade Assembly

Shade Assembly

wiring grounding instructions

SAFETY WARNING: READ WIRING AND GROUNDING INSTRUCTIONS (IS 18) AND ANY ADDITIONAL DIRECTIONS. TURN POWER SUPPLY OFF DURING INSTALLATION. IF NEW WIRING IS REQUIRED, CONSULT A QUALIFIED ELECTRICIAN OR LOCAL AUTHORITIES FOR CODE REQUIREMENTS.

wiring instructions

Indoor Fixtures

  1. Connect positive supply wire (A) (typically black or the smooth, unmarked side of the two-conductor cord) to positive fixture lead (B) with appropriately sized twist on connector – see Drawings 1 or 2.
  2. Connect negative supply wire (C) (typically white or the ribbed, marked side of the two-conductor cord) to negative fixture lead (D).
  3. Please refer to the grounding instructions below to complete all electrical connection

Outdoor Fixtures

  1. Connect positive supply wire (A) (typically black or the smooth unmarked side of the two-conductor cord) to positive fixture lead (B) with appropriately sized twist on connector — see Drawings 2 or 3.
  2. Connect negative supply wire (C) (typically white or the ribbed, marked side of the two-conductor cord) to negative fixture lead (D).
  3. Cover open end of connectors with silicone sealant to form a watertight seal.
    • If installing a wall mount fixture, use caulk to seal gaps between the fixture mounting plate (backplate) and the wall. This will help prevent water from entering the outlet box. If the wall surface is lap siding, use caulk and a fixture mounting platform specially.
  4. Please refer to the grounding instructions below to complete all electrical connections.
grounding instructions

Flush Mount Fixtures

For positive grounding in a 3-wire electrical system, fasten the fixture
ground wire (E) (typically copper or green plastic coated) to the fixture
mounting strap (M) with the ground screw (S) – see Drawing 1.

Drawing 1 – Flush Mount

Note: On straps for screw supported fixtures, first install the two mounting
screws in strap. Any remaining tapped hole may be used for the ground screw.

Chain Hung Fixtures

Loop fixture ground wire (E) (typically copper or green plastic coated)
under the head of the ground screw (S) on fixture mounting strap (M)
and connect to the loose end of the fixture ground wire directly to the
ground wire of the building system with appropriately sized twist-on
connectors – see Drawing 2.

Drawing 2 – Chain Hung

Post-Mount Fixtures

Connect fixture ground wire (E) (typically copper or green plastic coated)
to power supply ground with appropriately sized twist-on connector
inside post. Cover open end of connector with silicone sealant to form a
watertight seal – see Drawing 3.

Drawing 3 – Post-Mount
Post-Mount

LARK 33000 PIN OAK PARKWAY, AVON LAKE, OH 44012 LarkLiving.com

Company Logo

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals